Chapter 326,

In fact, the so-called solid waste disposal equipment is just a large, special drainage pump, which is responsible for transporting liquid fuel to the power generation equipment. www.しwχs520.com

This garbage treatment plant can not only treat solid waste, but also sewage treatment, and like the solid waste treatment equipment, there are also 20 sewage treatment equipment.

The so-called sewage treatment equipment is actually just a large pump, this equipment is only responsible for pumping sewage into the equipment, and then the housekeeper filters out the other elements in the sewage through the ethereal, and then this equipment discharges the very pure water.

For the sewage treatment capacity of this set of equipment, Lin Xiaobo is determined to treat 2,000 cubic meters per day, and it can also treat more than 700,000 cubic meters in a year.

This equipment can also be used to desalinate seawater, for this purpose, several pipes are specially introduced from the seaside to extract seawater and desalinate seawater, which is the same principle for the housekeeper, all of which are filtered out of the elements in the water through the arrangement of the ethereal, leaving only pure water.

Compared with liquid garbage disposal equipment and solid waste disposal equipment, it has just one more pumping function, which can be said to be an empty shelf.

But the equipment that uses liquid fuels to generate electricity is really genuine.

If you take this set of equipment alone, anyone who adds liquid fuels to it, such as oil, diesel, natural gas, etc., can use it to generate electricity.

As the saying goes, the products produced by the housekeeper are all high-quality products, this set of equipment has a very high utilization rate of fuel, and its own maintenance nanorobots are enough for this set of equipment to be used for a long time without wear, Lin Xiaobo is ready to launch this set of equipment at the right time.

The construction of the waste treatment plant began in December, and after four months of construction, it was officially ready to be put into operation on April 12, and most of this time was used to build office buildings, dormitories, canteens and other ancillary facilities.

In the 2,000-acre factory, there are no chimneys, no rumbling machines, but it is dressed like a big garden, with various trees and vines branched out, and a winding river running through the entire factory.

Coupled with the various buildings scattered in it, it can be said that it is more like an upscale community than a garbage treatment plant.

The whole factory is divided into two parts, inside and outside, the inner part is the area where the equipment for garbage processing and power generation is located, with a total size of 500 acres, and there are substations, laboratories and other buildings in it.

The outer part includes several parts: office area, canteen, dormitory area, fitness area, and leisure area.

Usually, those garbage trucks will enter the inner area through a specific road, specifically avoiding the dormitory area.

There are also special staff passages between the inner and outer areas, but these passages are guarded by special personnel and non-staff are not allowed to enter.

In comparison, the outer area is relatively loose, although you need a certificate to enter the office building, but like the dormitory building and the canteen, as long as there is an employee to lead, you can enter.

And these buildings are not particularly tall, and under the cover of a large number of plants, it is not so much a factory, but like a small CBD.

And because the garbage treatment plant is particularly good, when the garbage treatment plant has not yet been built, nearby residents have begun to ask how to get in.

First of all, the work of the garbage treatment plant is not as dirty and messy as imagined, and the employees only need to operate the equipment, and they do not need to pick up the garbage themselves, and they are not pure coolies.

In addition, the salary is also very high, each employee's salary is 6,000 yuan, and after the inspection period, they can become regular employees with five insurances and one housing fund.

Finally, when it comes to the living conditions of the garbage treatment plant, needless to say about the canteen, when Lin Xiaobo is ready to let the garbage treatment plant purchase vegetables from Dalin Village, it is definitely a good thing that is rare in the outside world.

Take the dormitory area as an example, there are as many as ten ten-story dormitory buildings, three units in the East Dormitory Building, a total of 30 units, 1,800 two-bedroom, two-bathroom, two-living room and one kitchen, with an area of 130 square meters.

All the rooms have been simply renovated, mainly practical, not so fancy, even so, presumably other factories, people who work in this factory, all feel that the happiness index has skyrocketed.

The reason why such a good house is built is also because the factory needs fewer people.

Thinking about it, the garbage treatment plant only needs to dump the garbage into it, which has the help of machines, and does not require many people at all.

As a result, there are only 150 people in the entire garbage treatment plant, from the factory director to the chef at the bottom, and in addition to the 20 security personnel of Golden Shield Security, there are only 170 people in total.

In this way, a situation has been created, all employees can live in a big house by themselves, and the factory is also very considerate: "Each regular employee can get a dormitory, as long as they can prove the relationship, they can take their wives or children to live together, and the factory does not need your rent, as long as the house is protected." ”

Naturally, this decision was a boong for all employees, but also for those who left without passing the training.

At 11 o'clock in the morning of April 12, the speeches of various leaders were finally completed, and the person sent by the ancient and modern matrix Huaxia Company was Shen Tianyi, the vice president, who was the second in command of the company.

As for Hu Zongqun, if he has the kung fu to take care of this matter, he will attach great importance to sending a second-in-command.

With the push of the decorative button by several leaders, the garbage treatment plant was officially energized, and the first truck of ten tons of garbage was dumped into the No. 1 hole.

Since these garbage disposal facilities need to be energized before they can work, they still need an external power supply to start, but only half an hour later, in the main control room, everyone can see that an indicator light representing the power generation area is on, which means that the waste treatment plant has started to produce its own electricity.

Now there are still some people in the garbage treatment plant who are key, and they are representatives of the local population.

As for the garbage treatment plant, although the ancient and modern matrix said that the sky is in the sky, but the garbage treatment plant has always given people a good impression, so when the construction started, these resident representatives also came to watch in person.

When truckloads of garbage were poured into the holes, the holes swallowed them all like bottomless pits, and no other machines could be heard in the factory except for the rumbling of cars, only the rising power generation let those present know that the equipment was running.

"Is this really working?" Someone at the scene whispered.

"Mr. Shen, are these devices working properly?" This is a leader who asked again.