Chapter 280 Installation of a photoelectric complementary power generation system
Genius remembers in a second [Aishang Novel Network biquge.info] to provide you with wonderful novels to read.
A few days later, the "Qingtai" brand power generation equipment manufacturer called to inform them that the 5,000-watt wind-solar hybrid power generation system ordered last time had arrived and was ready to be installed and debugged on the island.
After Jiang Yichen discussed the details with the manufacturer, he hurriedly called Lai Shun'er and asked him to arrange relevant matters.
Later, he told Director Shen of the logistics department to immediately go to the electrical appliance store in the city to buy a washing machine, a refrigerator, a micro-oven, an electric oven, an electric baking pan and a rice cooker. Send it to the pier for someone from the island to pick it up.
Since it is necessary to install high-power power generation equipment, it is time for the islanders to change their living conditions, prepare these modern household appliances, and run them at the same time to test the stability of this power generation system.
After another two days, just in time for a sunny riddle, good conditions were created for construction and commissioning.
According to Party A's requirements, the manufacturer sent a car to pull the equipment to the Jinchang Club Wharf in Longwan Village early in the morning. After a short time, Lai Shun'er drove a speedboat to pick up.
A complete set of parts for the power generation equipment was carried onto the rear deck, and three installers were followed by the ship.
The speedboat returned to Yunsha Island, and Xizi and Shi Suo'er also came to help, and together they transported various parts and tools to the platform outside the cave and the highest point of the north peak.
The leading technicians first conducted a terrain and wind speed survey with the instrument, determined the installation location, and then began construction.
In order to be in a hurry, these people have been busy at the summit except for eating and resting for a while at noon.
It turns out that their professionalism is still good. At about two o'clock in the afternoon, at the highest point of the North Mountain Peak, a two-meter-high white sè fan was erected, and the three elegant blades began to rotate with the wind, making a smooth and pleasant sound.
Below it, a large row of brand-new, shiny solar photovoltaic modules are supported diagonally at a 45-degree angle, neatly lined up towards the south.
These two things add a new symbol to the island and bring a touch of modernity.
The staff tried the installation firmly, and then buried the cable through the pipe, all the way to the outer platform of the cave not far below.
Due to the limited space in the cave, after discussion between the two parties, the small unit control room was set up outside the cave. However, a canopy needs to be built here afterwards for protection.
The control room is composed of several parts, such as the control device, the battery, the inverter, and the voltage regulator. Directly from the battery is 48 volts of direct current, and when the battery is connected to the inverter, it is converted into 220 volts of alternating current.
The power generation form of the whole system is very flexible, according to the change of wind power and solar radiation, it can be divided into three modes to choose: the wind turbine supplies power to the load separately; The photovoltaic power generation system supplies power to the load separately; Wind turbines and photovoltaic power generation systems supply electricity to the load together.
At this point, a full set of wind-solar hybrid power generation system has been installed.
The subsequent commissioning work was also very smooth, and the photovoltaic power generation system and wind power generation system were successfully operated at the first time.
Lai Shun'er used a micro-bo furnace and an incandescent lamp to test at the same time, the micro-bo furnace worked normally, the brightness of the incandescent lamp continued to change, and there was no flickering of light and darkness, indicating that the voltage was still relatively stable.
In addition to the above-mentioned equipment, there is also a large plate of spare cables for Party A to retain.
After carefully inspecting each item, Lai Shuner signed his name on the acceptance handover form.
The technical staff also carried out technical training for the three users, and repeatedly emphasized the importance of rational use and maintenance of the equipment.
When all the work was done, it was almost five o'clock in the afternoon.
Lai Shun'er greeted Xizi and Shi Suo'er, helped pack up the tools together, sent the factory personnel down the mountain, and he also drove the speedboat to send the people back to Longwan Village.
Blue Arrow 630 galloped away with a long white tail towards the northern sea.
When Kiko saw that the people were gone, she couldn't suppress the joy in her heart anymore, and she howled loudly. Shi Suo'er giggled on the side.
The island finally has electricity, which means that it has entered the modern society from a primitive society, which is a great epoch-making leap.
"Let's go, let's open the refrigerator and do the laundry!" Xizi waved her hand at Shi Suo'er and ran up the hill first.
"It's fun to wash your clothes, as for it." Shi Suo'er muttered and followed.
If you don't know, when you see this elated look, you will definitely think that the leader of Kiko is a very diligent person who loves housework.
Back on the platform outside the cavern base, Kiko opened the door and went inside.
The household appliances ordered by Brother Chenzi were delivered by Director Shen yesterday and were placed near the dining area in the cave.
Kiko first connected the refrigerator with the power strip, the refrigerator compressor made a slight humming sound, and he put a few plates of leftover vegetables and brine fish in turn.
With this stuff, there's no need to dig through the brains of how to store food. If you want to drink a cold beer in summer, you don't have to go to the gourd depression to dip.
Then, together with Shi Suo'er, he carried a white washing machine out of the cave.
Since there is no running water supply system on the island, the function of a fully automatic washing machine cannot be used. So an old-fashioned semi-automatic double-cylinder washing machine was chosen for manual water filling.
After connecting the wires and drain pipes, Shi Suoer went to the large water tank and poured two buckets of water into the washing tank of the washing machine according to the requirements.
When I turned my head, I saw Kiko come out of the cave again, holding a large pile of clothes in her hands.
"You've saved so much, huh? I said that there was always a bad smell on the side of Chuáng, which made me dream about working on the edge of the manure pond in the village for the past two nights. Shi Suo'er asked in surprise.
"Go, you foodie. Why didn't you dream of nibbling on eggs and scallion pancakes? The nose is almost catching up with the big black in the village. Besides, on this cold day, who likes to do laundry? Isn't this just right for testing the machine? Kiko said disappreciatively.
I got close to the washing machine, observed the capacity of the tank, and stuffed it all into it, regardless of the underwear and outerwear.
Pouring two scoops of laundry detergent, he straightened up, his arm stretched out and pressed the start button. His demeanor was solemn, as if it was not used to start the washing machine, but like a big leader pressing the switch of a rocket to send a shè, or a dam flood discharge switch or something.
The washing machine rumbled, and the sound sounded to his ears like fairy music.
"Haha, this time you can turn over and be liberated." Kiko looked at the swirling clothes and the flow of water, and rubbed her hands together in excitement.
In the past six months on the island, I have really washed enough dirty clothes. Especially in the winter, tsk, not to mention the taste. rs!。