1590. Rise from the ground

Qin Shiou asked, "Don't you need to dig out a basement?" I don't see a basement? ”

Shaq shook his head and explained: "No, BOSS, you can't ask for a basement, this is not a villa, just a three-story building, the foundation must be stable and solid, otherwise there are often strong winds on the seaside, and the unstable foundation will blow problems!" ”

This is the first disadvantage of Canadian wooden houses, it is not hurricane-proof, North America is a hurricane-prone zone, and the South Atlantic and South Pacific are more powerful than the northern seas, so we often see TV reports of hurricanes in the United States, and then after the hurricane or tornado passes through, the house is broken wood everywhere it goes.

Qin Shiou came to Canada in the first winter, when he went to the Bay of St. Lawrence to fish for lobsters, he encountered a hurricane, when the coastal port city was almost in ruins, and the port of the Basque Country was badly damaged.

But Canada is okay, there are not many hurricanes and tornadoes, much less than the United States.

In addition, this kind of wooden house also has the disadvantage of not being fireproof, once it catches fire, there is no way to put out the fire, the people inside can run, and the property and the house must be burned to char anyway.

Therefore, at the beginning, Qin Shiou could pass the audit by buying fire-fighting rocket launchers and fire-fighting bazookas in the name of firefighting in a small town, bidding farewell to a town like the town and living alone overseas, firefighting is a big problem, and St. John's side can't count on it at all, so he can only rely on himself.

However, if you live by the sea, the air is humid and generally not prone to fires, and even if there is a fire, it can bring water to fight the fire in time.

Qin Shiou nodded in understanding and said, "Come on, Shaq." I'm here to help. ”

Shaq looked around and gave him a nail gun. Let him learn from Zach to fix the wooden square on the concrete floor, and say, "Here are the construction drawings." And I'll draw a line in front, you just follow the line. ”

Once the timbers are fixed, the foundation walls are installed along the timbers, which act as wedges and the planks fit together.

The load-bearing wall on the first floor was built first, followed by the other walls, and after they were all built, they did not rush to open the second floor, but used an electric drill to drill various holes in the wood. Discuss where to make holes, where to crack them, and then put on various wire sleeves, and then take the line in the future.

The bull and the men then began to work on the ceiling, which required the use of acoustic panels, first with a layer of acoustic panels, then a layer of high-strength laminate flooring on the second floor, and then a layer of acoustic panels on top of it.

The Kraken and Shaq take the people to work on the kitchen and bathroom on the first floor, which are the most complex and important.

Qin Shiou followed to see that the construction of the kitchen was relatively easy. The most important thing is the water pipes and lines, the upper water pipes and lower water pipe systems are more complex, they can release cold water, hot water, and also need to be able to discharge sewage smoothly.

Sewage pipes are readily available. When the foundation was laid, it was left behind, as long as it was connected, and Shaq poured a basin of water into it. The exit of the pipe is by the sea and flows directly into the sea. Geng Junjie ran over and looked at it and nodded, "No problem, the water is flowing out." ”

Next is the pick-up line. This fisherman is also good at it, because they usually do the line at home, and this is traceable, and you can master it after doing it a few times.

In the bathroom, the sea monster and five fishermen are busy at work, and here, like the kitchen, it needs water pipes, sewer pipes, hot water pipes, cold water pipes, and various electrical circuits, in addition to building a septic tank.

Qin Shiou said: "What's so complicated about this, can't you just go to the sea?" ”

The sea monster smiled bitterly: "BOSS, have you seen it, here is still two kilometers away from the seaside?" What if the pipe is clogged in the future? The pipes of the health department are easily clogged. ”

Qin Shiou nodded in agreement and said, "That's right, I'm often constipated, and the is relatively hard and easy to block." ”

Hearing this, the fishermen laughed, and then all made disgusted expressions and said, "Don't disgust us, boss, please go and get busy, leave it to us here." ”

Naturally, he was joking, there is a feature of Canadian houses, people handle food in the kitchen, but in the end some things are poured into the health bureau to deal with it, so the health bureau pipes must not only be thick and broad but also easy to repair, and it is indeed easy to block.

The Kraken called Vail, consulted with an expert, and after asking the fishermen to dig a pit, saying that a septic tank would be built there, and then Vail would install a biogas conversion facility that could be used for cooking in the future.

Qin Shiou asked me to work, so what should I do? The bull beckoned and said, "BOSS, you can fill the dehumidifier." ”

The biggest problem of the house by the sea is that it is too wet, which can easily lead to wood rot, so it is necessary to do a good job of dehumidification, generally dehumidifier + dehumidifier, install a dehumidifier in the house, and pour dehumidifier and desiccant in the middle of the wooden board at the beginning of the house.

The construction of the septic tank needs to use a large percussion drill, because the foundation of the small building is very wide, and the surface of more than 1,000 square meters is poured with cement and reinforced concrete, the purpose is to create a good foundation - no way, the seaside geology is not good, do not enlarge the foundation area, in case of collapse or collapse, it will be fun.

The power of the large percussion drill is very strong, specially used to drill granite and the like, reinforced concrete can also drill the east, this thing is a bit like an electric drill magnified dozens of times, about one meter high, forty kilograms in weight, put it on the surface after the electricity, it roars and drills into the ground.

With the cement fragments and concrete fragments flying, a septic tank of more than 80 square meters and more than 10 meters deep was built, so that the plastic septic buckets and septic pipes of different calibers were installed, and the capping was half-finished after installation.

In the future, Vail will have to bring people over to install some biogas pipelines and machines for the septic tank, and it will be the end after all the installations are completed.

After the septic tank was dug and the first day's work was over, Qin Shiou didn't do heavy work, but he wasn't tired, and the fishermen were sweating profusely, and they really fought hard for a salary increase.

The next few days of work were a replica of the first day's work, and with the arrival of large floor-to-ceiling windows and doors and windows, the first floor quickly became presentable.

The four walls of the small building are four large floor-to-ceiling windows, and the glass is naturally specially strengthened, and these four floor-to-ceiling windows alone cost Qin Shiou 180,000 Canadian dollars, which is the same as the total price of the skeleton used in the construction of the small building!

But it's worth the money, with these four floor-to-ceiling windows, the first floor can almost be used as a sightseeing room, and the sun is good to prevent moisture.

The first floor was built, then the second floor, then the third floor, and finally a small attic was added to the top of the third floor, which Shaq said could be used as a utility room, which was very user-friendly.

In this way, the basic skeleton of the small building has been formed, no wonder the fishermen are full of confidence, the main materials used during the period are processed wood and composite panels, doors, windows, tiles, floors are ready-made, assembly line assembly line. (To be continued.) )