Chapter 518: A Day in the Life of the Pioneer Team
Red Giant, outside the City of the Dome No. 3, Construction Area C047.
Time, Ephemeris 0002, March 11, 16:28:20 AM.
The red giant time is different from that of Blue Mercury and the Earth, because there are 136 days in a year and a day of 68 hours, so the new calendar is used in the time calendar.
"Get up, get up and get to work."
In the construction area, in a temporary settlement, Zhang Beichuan's voice sounded.
"Oh, got it."
In the room on the second floor, on the upper and lower floors, more than 260 men rolled up quilts and got up from the bed.
In the kitchen downstairs, more than a dozen women handymen in charge of logistics have prepared hot water and placed large buckets of rice porridge, small plates of pickles, buns in large basins, fried dough sticks and other breakfast on a long table for the men who are ready to work.
The work of planet development is very hard, and the consumption of the body is particularly huge, so eating and drinking well can ensure a smooth day's work.
The work of logistics personnel is actually very tiring, cooking, delivering food, delivering tea, washing spacesuits, washing work clothes...... The more than 260 big men in the pioneer team all relied on these dozen women to serve.
"Aunt Yang, let's go."
Zhang Beichuan changed into a spacesuit full of oxygen and said to Yang Caihua, the person in charge of logistics.
"You have to be safe."
Aunt Yang sorted out Zhang Beichuan's spacesuit, and as if she cared about her son, she dusted off the dust on her shoulders for him, and her eyes were full of kindness.
Zhang Beichuan's heart was warm, his eyes were hot, and he thought of his mother.
"I see, Aunt Yang."
After speaking, Zhang Beichuan walked out of the house, climbed into a brick-making truck, and drove the car out of the garage.
Inside the garage, except for brick-making trucks. There are also neatly arranged pickup-like trucks, air purifiers with large hair dryers, and brick presses that press soil into adobe bricks.
There are also three tracked logistics vehicles similar to large RVs, which integrate toilets, restaurants, lounges and other functional spaces, as well as TVs and radios, which are fully functional and can accommodate up to 50 people at the same time.
"Bang, bang!"
The sound of metal hitting the ground sounded, and more than fifty workers who put on the exoskeleton machine and twisted their necks. Feel the power of this device.
"Box! Frame! Frame! ”
The voice came from the construction team on the opposite side, four engineering mechs six meters high, walking towards the city wall with firm steps.
The place where the Zhang Beichuan brick-making team works is a flat area located in the C047 construction area, mining and manufacturing stone bricks for the construction team.
There are two reasons why local materials are used in the construction area: one is the principle of proximity, where the construction area is built. The stone bricks are taken from where, and the second is that most of the ground in the construction area is uneven and needs to be leveled. In the process of mining stone bricks, the brick-making team also completed the work of leveling the land.
The environment of the red giant is harsh. The atmosphere is not breathable, the maximum temperature during the day exceeds 180 degrees, and if it is to be retrofitted, it is necessary to first build an absolutely closed environment. Air insulation, temperature insulation, and reduced light.
So, this needs to be enclosed first.
The height of this wall is 30 meters, because it is necessary to insulate the temperature. Therefore, the thickness of the wall is close to one meter, and steel bars and concrete are poured into it to ensure that it is strong enough.
Now, after nearly half a year of busyness, the construction of the fence in the construction area has been basically completed. The fence, which is more than 12 kilometers long, is about to be closed.
"I'll be able to close the dragon today."
Zhao Zhi next to him squinted his eyes and looked at the wall not far away, and the gap seemed to be less than fifty meters away.
"yes, when the wall is closed, we're going to start the next step." Zhang Beichuan Road.
For a forest-built area, the perimeter wall is only the first step.
The second step is to build dozens of large load-bearing columns inside the building, and build a glass roof on top of these load-bearing columns. Use anti-radiation glass that can absorb harmful radiation and excess radiation from the stars to "cover" the construction area, and then use an air purification vehicle to purify the air in the construction area...... In this way, the construction area is almost inhabitable.
The third step, which is almost the last step in the construction of the construction area, is the work of the agricultural development team, who have to use earth-making trucks to make soil, lay soil layers, divert water to the construction area, plant trees, apply fertilizer, and manage ...... Subsequently, the construction of the forest construction area was completed.
Zhang Beichuan's brick-making team only needs to complete the first and second steps.
Boom, after all kinds of machinery and equipment were busy for a long time, a person from the opposite construction team ran over.
The visitor wore a set of exoskeleton machine qì human device, waved his hand to the people here, and said: "Don't transport bricks over, the wall will be closed soon, and you won't need bricks anymore, you guys stop!" ”
After chatting with the man for a while, Zhang Beichuan immediately returned to his car and told everyone through the radio station: "Everyone doesn't have to do it anymore, the construction team doesn't need to use bricks, everyone takes a rest." ”
After a while, all the engineering equipment stopped.
Inside a logistics vehicle.
Zhang Beichuan called more than 30 team leaders in the brick-making team together and held a meeting.
"After more than 90 busy days, we are finally going to finish building this wall." A squad leader sighed.
"According to the regulations, in different construction areas, according to the different proportions of workload, the performance of the brick-making team is different. The total performance points of the forest construction area we built are 14 million points, and the score of the construction team is 35%, the score of the agricultural team is 40%, and the share of our brick team is 25%. ”
“…… That is to say," Zhao Zhi, the deputy captain, stretched out three fingers and said: "When the work in the construction area is completed, we can get 3.5 million performance points." ”
"And our brick-making team has 280 people, on average, one head, can only get 10,002 performance points, and this takes us about 120 days of work."
"So," Zhao Zhi paused, "from the perspective of efficiency, we can create about 30,000 performance points a day, which is actually about the same as the performance points we deserve from the bricks we suppress in a day." From this point of view, the development bureau's introduction of the construction zone contracting system has been carefully studied. ”
Zhao Zhi mobilized his clever brain, and continued: "In addition, I have been to other construction areas to understand, and found that the construction speed of other people's construction areas is fast and slow, and the walls of some construction areas have long been closed, and even the internal construction is almost completed. In some construction areas, the construction of the fence is only two-thirds completed, and the progress is very slow. ”
"The first point: the cooperation between the different pioneer teams."
"In many construction areas, the reason why the progress is slow is because the construction team and the brick-making team do not run in well, and this situation often occurs: the brick-making team makes too many bricks, and the construction team cannot use them up, and finally the construction team is dragged back, or the construction team has too many bricks to use, and the brick-making team cannot provide so many bricks, which pulls down the progress of the construction team."
"The second point: the issue of personnel su zhì."
"Some pioneer teams, when recruiting, want those who have a high level of education and understand mechanical operation, so these pioneer teams will use a lot of construction machinery, and they are extremely efficient when working. And some of the pioneering teams, only recruit the strength, the cultural aspect is ignored, and in the end there are few teams that will use construction machinery, and the efficiency is extremely low. ”
"The third point: a rational division of labor."
"In some construction areas, the construction team and the brick-making team do not work separately, but are organized to work together. Look at the progress of the project, there is a need for more manpower, when the personnel are allocated to that side, the same is true for construction machinery, as early as the purchase has been discussed, the rational use of performance points, to ensure that every penny is not spent, we can't, there are three transport vehicles put there is useless. ”
"In the end, I came to a conclusion: if we work under the best conditions in all three conditions, our brick-making team can create more than 60,000 performance points a day, and we still have huge room for growth."
Zhao Zhidao.
There was a lively discussion.
"60,000 performance points a day, that's equal to 6 million!"
"Indeed, our current work is actually quite leisurely, just more than 30 engineering vehicles, more than 260 people, providing bricks for the construction team to need, without a little pressure."
Wang Xiaobo shook his head, "It's too difficult, whether it's the cooperation with other development teams, the personnel, or the reasonable division of labor, it's difficult to do." Because no matter how much you do, if you can't figure it out, no one wants to suffer in the end, and our efficiency is already very good. ”
"You can't say that," Cao Zhiqiang shook his round head and said: "We can change some more equipment from the logistics department, such as engineering mecha, which can do a lot of work that engineering vehicles can't do. ”
Zhang Beichuan, who hadn't spoken for a long time, spoke: "Good equipment can indeed improve our efficiency, and the personnel must also be trained." When recruiting people in the later stage, recruit some people who are higher in the construction area, and when this construction area is completed, we must plan well, and strive to complete the work better and faster in the construction of the next construction area, and earn more performance points! ”
"Yes, earn more performance points!" Everyone responded excitedly.
At this time, there was a jubilant voice from the opposite side, "The dragon is closed, the wall is closed!" ”
Zhang Beichuan and the others leaned close to the window and looked towards the wall...... Sure enough, the gap in the wall is gone, and a four-sided high wall has enclosed the construction area, and from the outside, it looks like an ancient city, shining in the light.
"Let's take a day off today, and we'll do the rest of the work tomorrow."
Zhang Beichuan breathed a sigh of relief, they had been busy for more than 90 days in a row, but they had not rested for a day.
"Oh oh! After work, take a break today! ”
All those with weariness on their faces cheered...... (To be continued......)