Section 95 Dredging of Newport Creek
The morning sun rises in the east, illuminating the earth, and it is another sunny day. This bare rotten land on the banks of Xingang Creek has finally ushered in large-scale development today.
The flow of people rolled in from the direction of Chikan, and these people came to the planned kiln area base with various tools, divided into several groups, and began to be busy.
Tainan's climate is dry and wet, with 80% of the year's rainfall concentrated in summer, so the local rivers have a similar peak and dry season.
It's already November, and standing on the bank of the river, which has been washed out by the summer floods with a drop of 4 meters, you can clearly see the Xingang Creek flowing slowly below. The creek is only more than 10 meters wide at this time, and there are more than 10 meters of riverbed spans from each side of the riverbank, which can be clearly calculated: Xingang Creek can easily exceed 30 meters wide when it is flooding in summer.
A large number of laborers found two gaps in the river bank at this time, most of them went down directly to the river bank, and a small number of people took shovels and pickaxes to build the two gaps out of the earth steps, so that they could easily go up and down.
There were already people on the shore who were installing booms, and one end of the metal boom painted in the reverse color protruded out of the riverbank, and the head of the pole was fitted with a chain hoist.
For the first time, traces of human activity appeared on the primitive and messy riverbed.
All the stones were picked up and basketed, whether it was pebbles that had been washed away over the years or large chunks of mountain rock that had only arrived with the floods in recent years. The basket was carried to the bottom of the river bank, then tied to the iron hook stretched down by the chain hoist, and with a bamboo whistle, several people shouted the trumpet and pulled the bamboo basket full of stones ashore.
The handling of wood is even more difficult. After the flood passed, the riverbed and stream were scattered with many large trees rushing from the upper stream, and some of the large trees became natural bridges between the two banks. Although the location of the bridge changes every year, if you walk up and downstream, you can always find such a natural bridge.
The people first used axes and short saws to remove the miscellaneous branches from the large logs, and then, according to the length of the trees, organized the hands and worked together to carry the logs back to the shore one by one.
Pristine rivers in the 17th century, with dense shallows. At present, the traversers are not yet able to fully dredge Xingang Creek, but the creek near the south bank must be dredged. Wherever the sandbar shoals south of the central channel are temporarily dammed and drained, the sand is dug up and used to build houses and pave roads.
All of this will continue downstream until the Xingang Creek estuary. The lagoon near the mouth of the sea will also be renovated according to the situation.
In short, the ultimate goal of crossing the public is: a small boat loaded with building materials departs from the base of the kiln area, goes to sea with Xingang Creek all the way, and then circles along the string of sandbanks in the open sea, enters from the mouth of the Dayuan channel, and then crosses the inland sea of the Taijiang River and unloads the cargo to the Chihkan wharf.
This is the logistics solution designed by the Ministry of Infrastructure.
You must know that the kiln base base is in the middle reaches of Xingang Creek, and the straight-line distance from Chikan New Area is more than 3.5 kilometers. There are no Cummins or asphalt roads at the moment, and the building materials produced in the kiln area would be ridiculously slow if they were to be taken by land.
A laborer carrying a load or pushing a cart can only be tired and half dead to deliver a maximum of several hundred catties of goods to the ground. And a small boat, two or three boatmen, whistling can send two or three tons of cargo over, it seems to be a long way, but in fact water transport is very cheap.
The only thing that needed to be specially arranged was to arrange some slender men at the mouth of Xingang Creek, and occasionally when the wind direction was not suitable, the slender men would pull the boat back to the kiln area. The boats on the return trip were empty, and they didn't need a few slender men, and probably they wouldn't show that bitter and hateful look; What's more, in the planning of the crossing, all workers are paid, which is nothing more than that foreign workers do not have three insurances and one housing fund.
The vigorous construction of the kiln area began in this way.
Chen Dong was wearing a denim overalls and stood on the riverbank, and at this moment he lifted the net cover above his head and silently watched the busy laborers on the riverbed.
"The progress of the project is still good, why are you wearing such a long face?" Feng Guanjie, who was also wearing a hat and dressed as a Dragon Gate Inn, asked.
"Alas, the progress is good, I'm afraid I won't be able to maintain it!" Chen Dong said with a frown.
"You mean malaria?" Feng Guanjie reacted: "Didn't you already order the priority of filling in the stagnant water?" ”
"Don't you die when you fill the pit?" Chen Dong pursed his lips.
Feng Guanjie smiled: "That's no way, how can there be immortals in engineering, we don't even have enough labor protection clothes now, and we have to build on the river in the 17th century, hehe, it's exciting to think about it." ”
"Alas..."Chen Dong sighed: "This death will definitely affect the progress, and the malaria drug will not be approved?" ”
"Cut..."This time it was Feng Guanjie's turn to pout: "You don't look at what the quarrel is on the forum, right now it's just a little reserve sample, if you use it on a large scale, first of all, Bai Shuchao will not agree, this thing is resistant!" ”
"Besides, for whom and for whom?" Feng Guanjie shook his head: "Honestly climbing the chemical technology tree is the right way, and the rest is a symptom rather than a cure." ”
"Well, that's all there is to it." Chen Dong nodded: "Inform me that the river cleaning work will be responsible for foreign workers in the future, and the upstream should be cleaned up at least 5 kilometers, and the downstream will reach the sea, and in addition, the drying kiln will be covered first." ”
......
The drying kiln is the most urgently needed building at present, and it is also one of the simpler among many material kilns: when the wood is dry, the temperature in the kiln usually does not exceed 80 degrees, compared with other kilns that are often more than 1000 degrees, the drying kiln does not need refractory bricks, and the construction requirements are also low.
The drying kilns of the long dragon type are built with pebbles, river sand, and precious stock cement. In order to save materials, the first drying kiln built by the crossing was only 2.5 meters high, 3 meters wide, and 20 meters long.
For this reason, Cao Chuan also made a special trip to the afterlife, bringing two sets of atmospheric boilers and some pipes. The belly of the boiler is filled with all kinds of accessories, many of which will be used in other projects in the future, including small parts in the pipes.
The 2-meter-high, cylindrical atmospheric boiler is installed in the middle of the kiln body, and the boiler and kiln body are connected by pipes, and a shed is hastily built overhead.
The pipes penetrated include the inlet and return air pipes, and the pipes are installed above the kiln body, parallel to the kiln. The hot air inlet pipe is connected to the boiler air outlet, and the return air pipe is introduced into the fan. The roof of the kiln has a dehumidification window and an axial fan. At present, there is no electricity, so where fans are needed, all labor is used.
It took 5 days to install and debug all the drying kilns. In view of the fact that this project is too small, although it is a bit commemorative, the bigwigs basically did not come on the day of ignition...... After a simple ceremony, the boss of the Ministry of Industry, Comrade Zou Guoqing, who had been holding his tail between his legs for some time, threw a lit firewood stick into the furnace of the boiler with a smile on his face.