216 Neither shall an animal die of exhaustion
A series of suggestions from the three of them sparked another big discussion, and finally Sun Lao concluded that it seemed that this was an interrelated joint action, so let Xiao Cao, Lao Wang, Hou Xianglin, and Cheng Dong come up with a concrete plan to be submitted for discussion at the discussion meeting tomorrow morning.
The meeting also decided that an hour after lunch, all the adults, except for the children and the teachers, would go to the cave to gather and reorganize the supermarket materials in the cave under the command of Xia Xiaoou and Cheng Fangfang.
Next, after the members of the General Affairs Coordination Committee discussed in a whisper, Sun Lao finally announced on behalf of the committee that there would be another day off, of course, this day is mainly for meetings, so the meeting will continue tomorrow morning, and at the same time instructed Cao Zhu, the chairman and deputy leader of the exploration team, and Hou Xianglin, chairman of the Infrastructure Construction Committee, to propose a joint action plan to the General Affairs Coordination Committee, as well as a list of technical equipment required, and a specific action schedule, so that the General Committee can coordinate and arrange everyone's labor force.
At half past ten in the morning, Mr. Sun announced the end of the meeting, and asked everyone to go back to the room and take a break......
At two o'clock in the afternoon, the cave became very lively, and people first visited and admired the transportation results of nearly half a year, and then began to clean up the materials under the command of Xia Xiaoou Cheng Fangfang and others.
Although the supermarket materials in the cave were stacked very messily, after the classification area was demarcated, more than 80 people worked together and continued to work until six o'clock in the evening, and the food materials were almost cleaned up.
Then that night, everyone was given a large pile of various drinks and bagged and loose foods, and the children were evenly divided.
Xia Xiaoou asked everyone to quickly move the things they got back to their dormitories, obviously this is not the generosity of the ladies of the Living Materials Committee, but these things to eat and drink, all of which will be beyond the expiration date within a month or two, if you don't consume them quickly, you can only throw them away, the ladies know that if you don't send it to everyone after the expiration date, then our living materials management committee will really complain.
At the same time, after everyone signed for the drinks and food, Xia Xiaoou and Cheng Fangfang announced that all metal, glass and plastic packaging materials must be returned to the Living Materials Committee for centralized storage, because these things are useful in the new world.
That night, the chief and deputy captains of the exploration team discussed the details of the work in the vice-captain's room until midnight, during which no one went to Brother Zhu's room to disturb the two......
In normal times, the room of Zhu Beiguo, a doctor of history, is always full of friends, and a group of buddies talk about the past and the present together, and imagine their own grand causes, which is a lively and extraordinary occasion......
The next morning, in the conference room on the fifth floor, the plenary session started at nine o'clock on time.
First of all, Cao Limei put forward a list of technical equipment required by the exploration team, including six portable wireless walkie-talkies with a coverage of eight kilometers, six Corte pythons, 400 bullets, as well as optical zoom lenses for surveying and mapping, compasses, benchmarks, military telescopes, rucksacks, travel tents, alcohol stoves, etc., and wrote several papers.
Hou Xianglin then spoke on behalf of the Infrastructure Construction Committee, and based on the requirements of railway construction, he proposed that a waste burning team and a road construction team should be organized. The burning team will follow the exploration team, and once the direction of the front mapping is determined, the grass within 50 to 100 meters of the front and both sides of the planned road will be burned, Hou Xianglin explained, the reason why it is so wide is to ensure that the core area of the construction site is free of dangerous creatures such as snakes, insects, rats, ants, poisonous spiders.
In view of the fact that there has been a more detailed exploration before the crossing, so the surveying and mapping and construction are completely conditional to be carried out simultaneously, in short, I hope to seize the time, and strive to complete at least the construction of all the railway subgrade and the laying of some sleeper tracks before the end of this dry season, obviously, during this period, the engineering vehicles need to be fully invested.
This includes all truck cranes, bulldozers and most earthmoving loaders, excavators and rollers.
A tractor is also needed for logistical transport tasks.
As for the labor arrangement, in addition to the drivers and operators of the construction vehicles, about 20 strong laborers are required to be at the road construction site, and Hou Xianglin further explained that there are two more difficult tasks: earthwork and stone knocking, and the pebbles needed to build the railway are transported by earthmoving loaders and railways from the river beach near the red pier to the construction site, and these stones must be broken.
However, as soon as these words came out of the conference room, the nest suddenly exploded, and everyone shouted that this work is too tiring, not to mention that it is not efficient, can't you get on the machine?
"I've seen it, we have a stone crusher in the cave!"
"Yes, yes, there is! I've seen ...... too."
"No matter, get on the machine!"
"Yes, although men are used as livestock nowadays, who is responsible for exhausting the animals?"
"Yes, even animals can't die of exhaustion!"
"Haha, that's ...... that"
"It's understandable, I can't say this to a certain extent if I haven't been tired."
"Boss Luo, why don't you assemble a stone crusher for us in your mechanical group?"
"Makes sense, just do it!"
In the noise of everyone, at this time, Boss Luo, one of the recognized senior leaders of the mechanical group, immediately stood up and said that if everyone agreed to consume the industrial equipment and process auxiliary materials in the cave, we only need to give our mechanical group a few days to match the jaw crusher used for mineral processing in the cave with a high-horsepower Stirling engine that burns coal and wood.
If you really don't feel sorry for the fuel, you can go directly to the diesel engine, anyway, we are fully capable of immediately making a set of pure mechanical power simple stone crusher out, and then pull it directly to the river beach site, where the pebbles are broken and then transported to the railway construction site, so that everyone's labor intensity can be reduced a lot, and there is no need for many people.
Teacher Zhao immediately nodded in agreement, saying that the work efficiency will definitely be greatly improved.
After listening to Boss Luo and Teacher Zhao's suggestions, everyone's emotions rose and immediately rose, and almost all of them shouted and agreed without any hesitation! Agree! Then some people also said that now that people are tired of dogs, they will definitely not feel sorry for things, otherwise they will put the cart before the horse!
Hou Xianglin was overjoyed when he heard it, and said that he would just wait for everyone's words, if this equipment is completed, not only will our physical work be less than half, but the entire construction period will be advanced! The key is that there are many construction projects that need stone crushers.
So everyone applauded when they heard it and said that Boss Luo Saigao, Boss Luo Niu, we raised our hands in favor of this project!
As for fuel consumption and wear and tear on process equipment, they have been selectively ignored in this case.
On behalf of the General Affairs Coordination Committee, Mr. Sun asked the mechanical group headed by Boss Luo to complete the research and development of the stone crusher before the road construction team entered the construction site.
Subsequently, the topic turned again to ---- about the secondary burning and clearing of the land to be reclaimed.
According to Wang's repeated requests, after discussion, it was decided to invest five tractors and two excavators in the reclamation of wasteland, and the labor force would not be less than 20 people, and the task of the reclamation team was to complete the land plowing and tidying of the savanna east of the Red Mansion before the end of the dry season.