Chapter 587: Fine Division of Labor
In the eyes of others, the construction of this new city did not carry out large-scale leveling of those mounds, but based on the average height of most of the mounds within a radius of 600 meters. Fastest updates
For those places below the average standard, layers of soil and rock excavated from the surrounding mounds are used to fill and compact.
Due to the large amount of fill in those low-lying areas, there is a possibility of large settlement, so the method of layered rolling and compaction is adopted to increase the compactness of the foundation.
The urban unit was built from the center of the circle, where a higher mound was chosen for planning.
The mound was not leveled because Wu Guangliang intended to use it as the central park of the new city.
At the center of the mound and a half-longitude of 100 meters, the construction of the first octagonal loop began.
After clearing and leveling the floating soil on the surface, the foundation is very solid.
In those areas with filling, Minsheng Company arranged for special personnel to direct those heavy-duty cars, and while transporting heavy construction materials to the central area, they constantly rolled the layers of floating soil.
Although this kind of operation is more troublesome for dry car drivers, it is not a problem to see that the transfer freight is not low and can be settled every day.
On the periphery of the urban unit, some simple courtyard houses were also built with container houses, some for living and some for storing materials that were not suitable for outdoor display.
With the consultation and support of the government departments, the temporary water and electricity pipelines were directly delivered to the courtyard houses used for the workers, basically meeting their minimum living needs.
On this kind of construction site, where there is a lot of excavation and filling, it is not suitable for cooking.
Therefore, the meals ordered by the migrant workers living on the construction site through the Internet every day will be delivered to the Minsheng canteen set up in the courtyard on time by a special food delivery truck.
The low cost of living and flexible employment methods have attracted more and more idle labor.
The relevant departments of the government have even found through observation that as long as a diligent person with ideas can easily earn hundreds of yuan on the construction site of Minsheng Company every day.
However, those skilled jobs that used to earn tens of thousands of dollars a month on other construction sites have been broken down into dozens of ordinary jobs that can be done by non-professionals.
For example, in the past, as long as the work of a reinforcing steel worker was related to rebar, he had to be able to do it to some extent.
But on Minsheng's construction site, the processing of each type of steel bar component is standardized.
If a person learns to process only one type of reinforcement member, it is easy to get started and achieve a uniform standard with the support of suitable standardized tools.
For a new city covering an area of one square kilometer, even if it is only one type of steel rebar component, it is not something that a few skilled workers can do.
The subdivision of jobs greatly reduces the threshold for special types of work.
In the case of saturation of workload, the work efficiency of a hundred professional reinforcing steel workers who can do anything is not necessarily higher than that of a hundred dedicated reinforcing steel workers who have just started.
However, the monthly salary expenditure of 100 professional steel workers can reach millions, while the monthly salary expenditure of 100 full-time steel workers is only 2 or 300,000 yuan, which is equivalent to saving more than half of the cost.
These savings will actually be reflected in the rent of the houses in the new city, because, in Wu Guangliang's plan, the rent of the houses in the new city is calculated according to the cost of its construction.
You may not feel it now, but after the new town is repaired, everyone will understand how the new town is different from other places.
Perhaps, from the perspective of the steel workers, Minsheng Company's approach has lowered their income level.
However, from the perspective of ordinary migrant workers who do not have comprehensive steel processing skills and have only undergone simple training, Minsheng's approach has increased their income levels and allowed them to obtain more job opportunities.
As a result, the skills that can only be mastered by the so-called professional and technical workers are being rapidly replaced by ordinary skilled workers with the support of the task platform of Minsheng Company.
This kind of work model, which only requires simple training and does not require much personal work experience, has allowed more and more ordinary people to find the value of their lives.
Because work experience can only be accumulated slowly over a long period of time, but if you only need to do one of the relatively fixed jobs, as long as you have the basic ability to imitate and learn.
When he has done a certain thing well, and then continue to learn relevant skills based on it, his work ability will naturally improve.
Although the construction site of Minsheng Company has solved the employment problems of many local people, their cultural knowledge level also limits the further improvement of their work efficiency.
In order to further improve work efficiency and lay a good foundation for the future development of Minsheng Company, Wu Guangliang decided to discuss with Li Dongsheng about using vocational high schools to train skilled workers.
When Li Dongsheng was found, Li Dongsheng was about to go out, because the higher-level departments were preparing to supervise the county's poverty alleviation work and needed to report relevant poverty alleviation information.
Since trace management is now required from top to bottom, the daily work content of staff at all levels must have traces to follow and materials to see.
As a deputy county magistrate, Li Dongsheng also needs to reach the poverty alleviation line within the specified time limit.
In the case of more and more non-professional tasks, it is also difficult to find a suitable time for everyone to carry out the tasks of visiting and helping.
After many times of communication with the cadres stationed in the village, I found a time when most of the poor households were at home, and made an appointment before preparing to go out.
However, the new city construction work of Minsheng Company is also in contact with him.
In the long run, the construction of the new city is the driving force of local economic development, which should be more important, but ......
Li Dongsheng hesitated for a moment and said, "Mr. Wu, the above wants to check the poverty alleviation work in our county, and I just made an appointment to visit the homes of the people I help."
If you're not in a hurry, I'll get back to you, okay? ”
Wu Guangliang smiled and said, "County Magistrate Li, when will you be in charge of poverty alleviation again?" ”
"Alas, this poverty alleviation work requires a tight schedule, and it is also a key project, and if it is not done well, it will be vetoed by one vote, so it cannot but attract attention."
"However, as a deputy county magistrate in charge of the economy, shouldn't your main responsibility be to improve the economic development level of the county?"
Li Dongsheng looked at Wu Guangliang, smiled bitterly and sighed, didn't say anything, took his things and prepared to go out.
As soon as he stepped out of the office, Wu Guangliang said: "County Magistrate Li, I suddenly want to know more about these poor groups.
So, why don't I go with you and have a look, if you need it, I guess I can help a little bit. ”