Chapter 199: The Square

According to the current speed of development and a more efficient way of material scheduling, Wei Minsheng feels that the establishment of Huaxia can be advanced in advance, and the relevant preparations must be done first. Pen % fun % Pavilion www.biquge.info

Xiaobao of the Ministry of State-owned Assets Supervision and Administration and Yang Yong of the Ministry of Construction were a little confused after receiving this task of preparing for the founding of the country.

First, they were all promoted from the commoners, and they only needed to complete the work according to Wei Minsheng's requirements before, and the task requirements that Wei Minsheng usually gave were very detailed, and they didn't have to think about other things at all.

Second, they really didn't know anything about what needed to be done to establish a country, and a large number of the official members of this Huaxia Villa were from the small border town of Zigui, where had they seen these things.

Even if there are some legends, they are only a few words, and they do not make any constructive suggestions at all.

Although Li Yan of the Ministry of Foreign Trade knew a little more, it seemed that those complicated ceremonies were far from Wei Minsheng's requirements, and the structure and management of the whole country were completely different from those of the other three countries, and there was nothing to learn from at all.

In Wei Minsheng's thinking, the establishment of this country is just to obtain a qualification to deal with the other three countries, and with the resources and capabilities they have, it does not matter whether they agree or admit it at all.

The important thing is to beat the name of Huaxia Kingdom, so that everyone knows that there is such a thing first, and there is a way for them to admit it in the future.

But since you want to establish a country, you must first determine where the capital is.

The place that Huaxia Villa can control at present is only so large, and the range to choose from as the national capital is too small, and at present, only the small plain inside the villa is the most suitable.

These iron houses are indeed very strong, but they lack some of the momentum of being the capital, in Li Yan's words, they just can't feel a little majesty, it's too simple.

The auction hall outside the valley has a good momentum, but there are too few people who can accommodate it, and Wei Minsheng's request is ready for everyone to participate.

Of course, this owner is all those who have a relationship with Huaxia Villa, including official members and peripheral members, as well as those who are studying in Huaxia Villa.

After a period of development, the number has reached 8,000, most of whom have obtained formal membership through the relationship of their immediate families, and there are less than 2,000 people who have passed the assessment and are qualified to vote.

In addition to Li Yan's group of subordinates who came over from Chengcheng, there are only some people who have made outstanding contributions to the villa, with a total of about 3,000 people.

In addition to the envoys who studied in the Huaxia Villa and in case the other three countries might send envoys to observe the ceremony, at least a place that could accommodate about 12,000 people should be prepared.

Seeing that they didn't put forward any satisfactory plan for half a day, Wei Minsheng simply gave a direct task: to repair a square.

This square was to be built between two mountain gates, and because of the establishment of a junior school in the Li Family Farm in Ziguicheng and Yiling, the electric classroom that was originally used for teaching is now mainly used as an assessment place for official members, so there is no need for students to stay.

After vacating all the surplus mobile rooms for accommodation, there are still nearly 30,000 square meters of open space in this place, which is enough to accommodate 10,000 or 20,000 people in the square.

Since it is a square, this sand looks too low-grade, anyway, those stone processing equipment have already been brought over, and there are still some small slopes on the dock that need to be cleaned, and those hard granite are just used to pave the ground.

The area around this small valley needs to be cleaned up a little more, with excavators clearing the irregular areas and reinforcing the concrete protective walls where there may be landslides.

Although it is difficult to buy gas stations in the real world due to the existence of monopoly, Wei Minsheng found another way to obtain large quantities of oil from the large-capacity fuel tanks of cargo ships up to five tons.

It is impossible for this converted cargo ship to refuel in the real world, but you can buy some oil storage tanks and build an oil depot in the other world according to the construction standards of gas stations.

Then buy two cargo ships with diesel fuel and gasoline respectively, and the daily task is to drive the cargo ship around to refuel, pump it to the oil storage tank after filling up the fuel, and finally transfer the oil by Long Hao through the shared space.

Of course, this matter cannot be solved in a day or two, but the tanks of the cargo ship that are being converted have more than four tons of diesel in them, which is enough to support them for a long time.

So now that Wei Minsheng has solved the problem of oil source, excavators and dump trucks no longer have any scruples about using them.

Anyway, now the company's account is still full of liquidity, so it has purchased a few new dump trucks and two second-hand excavators.

The stone bricks produced by the stone processing equipment were originally only partially used in Lijiazhuang, and a large number of finished products were stacked on the wharf.

After receiving the production instructions from the Ministry of Construction, in order to ensure the laying of bricks on the ground of the square, all the equipment produced stone bricks almost all day long.

In order to prevent slipping, these floor tiles do not need to be sanded at all, they only need to be cut out according to the standard size, so they are very convenient to produce.

With the participation of these vehicles and excavators, plus thousands of cheap labor, the 30,000-square-meter square was completely paved in just a few days.