Chapter 129 Outsourcing of Construction Projects

"Contracted to a private team?"

"It's like the muddy stone road built outside the villa, calculate the workload, clarify the construction time, standards, funding and quality requirements, and whoever feels that they have the ability can come to contract."

"Can anyone contract the construction task issued by the Ministry of Construction?"

"Not bad."

Li Yan said: "My lord, if these construction tasks can be done by outsiders, our villa is fully capable of doing better, why do we have to contract these jobs to individuals?" Isn't that, as you said earlier, to the detriment of our country's interests in the future? ”

Wei Minsheng said: "This situation does not harm anyone's interests, because these construction projects must be done, but our Ministry of Construction has a lot to do, and it is impossible to pay attention to the construction process of each construction project."

Moreover, judging from the current situation of the villa, there will be a serious shortage of personnel in some important positions for at least a long time, which will affect the development of Huaxia in the future.

If some simple construction projects are contracted, the Ministry of Construction only needs to issue construction tasks according to the needs.

In this way, the construction booth can be spread very large, and even some construction tasks can be directly released on the territory of other countries, and we can receive them after completion, without having to deal directly with officials from other countries, which can save more manpower and time, so the outsourcing of these construction projects is very worry-free. ”

"If someone from outside comes to contract, there is nothing to pay for the contract. But if the official members of the villa participate in the contracted construction, how should the original salaries of these official members be calculated? ”

"That's the question...... It is also simple, during the contracting of the construction project, those who are unable to complete the work tasks of the villa will be paid a basic salary according to the minimum income standard, that is, 150 Huaxia yuan per person per month, and the income from the construction project will be counted as their own additional income. ”

Li Yan thought for a while and said: "Lord, if these contracted construction projects are done well, this additional income may be much higher than the salary income of the fixed positions in the villa, will this exacerbate the contradiction that no one will come to the fixed positions in the villa?" ”

"According to your method to contract these construction projects may also be in this situation, but we can make some improvements from the system, first of all, the construction tasks issued by the Ministry of Construction, the total amount of construction funds invested has been preliminarily calculated.

Secondly, the task issued is to determine the contractor by way of open competition for everyone, and the one with the lowest price will get the right to contract construction, and the one with the highest credit contribution point will get the right to contract and build under the same conditions.

In this case, the use of construction project funds must be carefully calculated, and if the bid is high, you will not get the right to contract the construction, and if the bid is low, you may lose money, so the contractor of this construction project has to bear some risks, and it is far from being as stable as the salary of a fixed post. ”

"In the case of reducing construction funds, how to ensure the construction quality of these contracted construction projects?"

"The contractors of these construction projects need to carry out real-name authentication and registration, and in the event of man-made quality problems, the relevant responsible persons must repair the quality problems, and the relevant funds and materials in the repair process shall be responsible for the responsible persons."

"What if the quality problems in the construction project are very serious, and the contractor does not have enough funds and materials to fix these quality problems?"

Quality problems have always been a headache in the real world of Wei Minsheng, engineering projects through layers of subcontracting, railway pier engineering may eventually fall into the hands of a chef with a kitchen knife, a variety of construction quality serious problems of the news emerge from time to time, causing great safety hazards and social problems, wasting a lot of social resources.

Therefore, in this other world where it can almost be said that he can have the final say, Wei Minsheng must prevent similar things from happening.

In order to formulate a feasible quality supervision system, Wei Minsheng had already designed the relevant system in accordance with the programming attitude before the meeting.

A drop of clean water falls into a sewage pond, and there is no clear water in the pond; But a drop of sewage falls into a clear water pond, and the pond is still clean water.

A good system can make bad people do good, but an unreasonable system can make good people evil, so we must ensure a positive guidance in the design of the system to ensure that those who do things according to the system can get the greatest convenience, and those who do not do things according to the system can not move an inch.

Wei Minsheng looked directly at the camera at the venue, making the other two people watching the video feel their strict eyes, and said: "This industry is banned for life, and according to the number of losses caused by quality problems, the circumstances are minor in accordance with the law to impose compulsory work for different periods, and the income from voluntary work is used to offset the losses suffered by the state or individuals."

If the circumstances seriously violate the existing laws of the villa, it shall be enforced in accordance with the provisions of the law, and the corresponding credit contribution points shall be deducted.

If anyone's credit contribution points are reduced to zero, according to the rules of the villa, he will automatically lose his qualification as a full member of the villa, and will no longer enjoy all the benefits and guarantees of the villa. ”

This is equivalent to expulsion from the villa, but according to the rules of the villa, the person who has been expelled from the villa still has the hope of returning to the villa, that is, to do as much as possible to do what is beneficial to the villa, accumulate contribution points, and when the contribution points are no longer zero, they can apply to become a full member of the villa again, and they can return to the villa again after a joint vote.

However, those who return to the villa can only enjoy basic treatment and security due to the low credit contribution points, and if they want to be improved, they must use their spare time to do contribution point tasks under the condition of completing their basic work tasks.

As long as your contribution points do not reach more than 60 points, the treatment and security will be lower than those of people in the same position, and if you want to accumulate contribution points from 0 to more than 60 points, unless you can make a great contribution to the villa, enough to offset the harm caused by previous violations of the law, it will take at least 20 years. Therefore, the punishment of expulsion from the lodge and disqualification of full membership is very severe.

"What if there is a problem with a large construction project, and the losses caused by these contractors cannot be repaid for a lifetime?"

"First of all, at present, the scale of these outsourced construction projects will not be very large, and the Ministry of Construction will confirm the status of their personal assets before the contractor undertakes the construction project; Secondly, these particular problems can be solved through insurance funds.

In the past, it was planned to withdraw 5% of the inheritance tax as an insurance fund, but so far there is no tax at all, so a special insurance fund for construction projects can be established by levying 5% of the construction project funds to deal with the losses caused by non-human resistance in the construction process.

However, the use of this special insurance fund must be used through everyone's joint vote, if the insurance fund is insufficient, increase the proportion of future collection, if the insurance fund accumulation of funds reaches a certain amount, you can also reduce the proportion of collection through everyone's joint vote. ”

PS: I'm going out tomorrow.,I can't update.,Send a chapter that was completed at noon first.。