Chapter 362: The locomotive is completed

If there was no Yao Ran at the scene, this matter would really be easy to happen, but with Yao Ran at the scene, are these problems still a thing?

"Xiaolong took someone to get it. Pen ~ fun ~ pavilion www.biquge.info two temporary ropes to fix the gantry crane above, and then move through the position of moving the left one, as well as moving the right one to fix the rope. Then remove the hook pulley that moves the left one and the one that moves the right one. Push the two cranes behind the gantry crane. On the connection you can do it. ”

Seeing that they were busy, Yao Ran was also anxious, but being anxious could not solve any problems. Fortunately, Yao Ran can see the things here clearly, and then he doesn't need the retinal system to solve it by himself, anyway, even if the retina is out, Yao Ran will still solve it. God knows who thought of it.

Xiaolong led people to hurriedly operate according to Yao Ran's instructions. Such continuous stress is a test for every lifting equipment, but Yao Ran is confident. Because I can see it~

The load-bearing capacity of every piece of wood can be seen clearly in Yao Ran's retinal system, so if there is danger, Yao Ran will also stop it as soon as possible.

So after making sufficient preparations, after the ropes on both sides have been fixed, the connection between the two cranes in front of the steam engine and the crane was broken by Yao Ran under Yao Ran's prompting.

In this case, the entire gantry crane and the two mobile cranes behind the two fixed cranes are bearing the weight of the steam engine as a whole close to five tons, although the power is inseparable, but the weight of each equipment is still a lot.

Yao Huo hurriedly pushed the two steam engines in front of him to the rear of the gantry crane, and then went to reconnect the steam engine with the two cranes in front of him, so that the other two important fulcrums appeared again, and the gantry crane would not bear all the weight on the right alone.

Then the position of the steam engine is now enough to start the correspondence of the position. There is now a full-fledged steam engine hanging above the entire steam locomotive, and it looks like it has taken on a little bit of appearance.

Now the rest is to start testing Yao Ran to complete the rest of the corresponding work, now the steam engine is suspended above the chassis of the steam locomotive, and the position to be fixed is actually very much, and even under the chassis, someone has to go down and tighten the screws.

Of course, the most important thing now is to get the whole machine in the right position. And Yao Ran has become a lot simpler in all this. Because the retinal system can clearly report the telescopic size data of each rope.

"The left fixed crane retracts the rope for a circle and a half, receiving, receiving, receiving! ~Stop~! ”

"The second mobile crane on the right put the rope around, put it! Put ~ stop ~ put another quarter circle ~ good! Stop! ~”

"The rope on the left side of the gantry crane is closed, close! ~Close~Stop~ Good! ”

Several protruding positions were stuck right on top of the steam locomotive chassis.

With Yao Ran's commands, after continuous adjustments over and over again, the entire equipment is now almost parked on the chassis of the steam locomotive.

Now it can be seen that the whole steam engine is placed in a completely different way than in the second blast furnace, in the steam locomotive the cylinder is downward, and the push rod is also pushed backward.

The pipes, which were originally made of ceramic pipes for heat conduction, were also wrapped in a layer of cotton cloth and then wrapped around two cast-iron shells, which were then fixed and snapped together with screws.

Subsequently, the traveling part of the steam locomotive includes a wheelset, a guide wheel, and a slave wheel. First, a connecting rod that had been prepared long ago was used to connect the push rod driven by the cylinder of the steam engine. Then the other end of the connecting rod is attached to the guide wheel.

This moving wheel is actually the main transmission of power, followed by the driven wheel. It is not easy to install these wheels, it takes three people to work together to install one wheel, and this steam locomotive has a total of four cylinders, so there are two sets of moving wheels and driven wheels on each side, so that there is a special length of the linkage rod.

The steel spring suspension device is connected to the frame of the steam engine and the chassis of the steam locomotive, mainly to provide support, but also to reduce the occurrence of undulating bumps and bumps that are the failure or damage of the steam engine hitting the chassis.

There is also a small wheel pair installed on the bogie in front of the locomotive, this wheel is small and is the guide wheel, because when the steam locomotive is advancing, the guide wheel is guided in front.

This allows steam locomotives to pass through curved rails. The large wheel in the middle of the steam locomotive that can generate traction is the one that just linked the moving wheel. In addition to bearing a part of the weight, the calling wheel on the rear bogie of the locomotive can also play the role of a guide wheel when the locomotive is reversed.

The bearing box and the plain bearings of the steam locomotive mainly play a lubricating role and prevent the axle from overheating at high speeds. Expansion or shaft breakage. The function of the spring device is mainly to alleviate the vibration during operation, reduce the impact of the wheels on the line, and also distribute the weight of the upper part of the frame evenly to each wheelset.

After the front of the steam locomotive was installed, the steam locomotive had already begun to look like it, with air holes placed at the head of the entire steam locomotive, and a fire box heating the water tank in the middle behind it.

Coal is burned inside the firebox, which conducts heat into the tank.

There are three parts: the fire box, the pot carcass and the smoke box. The firebox is composed of two parts: the inner firebox and the outer firebox, the bottom of the inner firebox is the hearth, and the lower part of the hearth has an ash box for storing the ashes.

After all the parts such as the water tank were installed, it was already sunset, Yao Ran was also tired and sweating, and the coal water truck had not yet been made.

In other words, if this steam engine runs now, it can only run to Yaozhai, and there will be no fuel. Of course, it's okay to burn something else, but you don't know if the firepower is enough.

At this moment, Yao Ran personally followed the installation of the firebox and the installation of springs, and Yao Ran followed the installation of the most difficult components, and those who have no experience in these parts can find the location of the installation belong to smart people, not to mention the correct installation after adjusting the state.

By the time all the parts and equipment were installed, it was already getting dark. And at this moment, Yao Ran and Yao Huo Xiaolong are all black. Not because of the color of the clothes, but because of the back and forth drills inside this freshly finished steam locomotive.

At this moment, Yao Ran's face was also covered with black oil, and he smiled and leaked snow-white teeth, looking funny and funny.

"It's finally done! Let's be an old driver and give it a try? Yao Ran's words were filled with excitement and tiredness at the same time.