Chapter 105: Visiting Senior Sister

Sun Yuhan graduated from Minyue University of Architecture and Engineering, majoring in architectural design.

Because of her diligence and studiousness, solid professional foundation and outstanding business ability, she was promoted to a department manager when she entered the survey and design institute under Longcheng Group in Minyue Province in the fourth year.

Today is the first working day after the May Day holiday, and in the morning, Sun Yuhan answered a phone call, which was from a student from her school.

The younger brother is two years lower than her, majoring in civil engineering.

The reason why the two met was because they both participated in a public welfare student club when they were in school.

It is the kind that organizes to go to the nursing home every weekend to clean up for the elderly, and go to the children's home to tutor the children with their homework.

came and went, and after seeing each other more, the two naturally became acquainted.

It was about three o'clock in the afternoon, and the junior came to the Longcheng Survey and Design Institute.

Sun Yuhan put down his work, led the person to the living room to sit down, and then asked, "Xiaohua, did you come to me today for something?" ”

The junior knows the personality of the senior sister.

The Northeast is full of words, and his speech has always been straight to the point, without any twists and turns.

He also said bluntly: "There is a bidding project that wants to cooperate with your company. ”

"Tender project?" Sun Yuhan was puzzled when he heard this, "Haven't you been doing the scene all the time?" Why are you still in charge of the bidding business? ”

"I have indeed been on the construction site before, and I set up a construction company half a year ago, and now I have opened the door and eaten by myself."

"That's good." Sun Yuhan smiled and asked, "Then you came to me to make a design plan?" ”

After all, they are all in the construction industry, and Sun Yuhan has naturally been exposed to various types of design business, including some customers of construction units.

"It's not just the design scheme, because our company does not have survey and design qualifications, so we want to find your company to do a bidding consortium."

"What tender project!?"

As soon as he heard that this kid was not here to consume, Sun Yuhan immediately became alert.

I saw the junior put a document in his hand in front of her.

She picked up the materials and flipped through the key messages of the project.

【Lucheng City Transportation Bureau Business and Technical Housing EPC Project】

Scope of bidding: The total estimated cost of the bidding is 61 million yuan, including project design and survey, construction and installation engineering, decoration engineering, mechanical and electrical equipment procurement and installation engineering, outdoor overall engineering, etc.; Among them, the construction drawing design includes professional projects such as building intelligent engineering, fire protection facilities engineering and environmental engineering.

Survey and design work includes: geological survey, schematic design, preliminary design (including budget estimate), construction drawing design and design services for the whole process of construction. The survey results shall be reviewed by the tenderer; The preliminary design (including budget estimates) shall be reviewed by the tenderer entrusted by the preliminary design (including budget estimates), and the construction drawings shall be reviewed by the tenderee.

Planned construction period: The total construction period is 360 calendar days (including survey, design, construction, equipment procurement and installation).

Bid evaluation method: comprehensive evaluation method.

Qualifications:

1. The construction administrative department shall issue a valid comprehensive qualification for engineering design, or a Grade B qualification for design in the construction industry, or a Grade B qualification for design in the construction industry (construction engineering);

2. The construction administrative department shall issue a valid general contracting qualification of not less than the third level of construction of housing construction projects.

3. This tender accepts consortium bids.

……

After reading the tender announcement, Sun Yuhan put the information back on the table.

She then asked with a serious face: "Tell me the truth, what is the purpose of your participation in this bidding project?" ”

"Huh?" The junior looked confused, "Purpose...... Of course, I won the bid. ”

Sun Yuhan stared at his junior brother for a long time before he finally spoke: "Xiaohua, I don't know if you are not self-sufficient or have become dishonest. ”

"Senior sister, this is really a great wrong!"

"Look, you kid hasn't spoken so smoothly before."

β€œοΌŸοΌŸοΌŸβ€

Seeing that the junior brother was still confused, Sun Yuhan couldn't help but sigh and asked, "Your company has just been established, what is its name, and what qualifications do you have?" ”

The junior brother hurriedly took out a business card and handed it over.

Minyue Province Yijing Construction Co., Ltd

Level 3 of general contracting of municipal public works construction;

Level 3 of general contracting of construction projects;

Level 3 of professional contracting of steel structure engineering;

Level 2 of professional contracting of building decoration and decoration engineering;

Level 3 of professional contracting of environmental protection engineering;

Level 2 of professional contracting of fire protection facilities engineering;

Level 2 of professional contracting of building curtain wall engineering;

Level 3 Professional Contracting of Urban and Road Lighting Engineering;

Sun Yuhan glanced at it casually and said, "You still say that you didn't float?" ”

The junior smiled: "Yes, our company's qualification level is really not high, so I came to you for help." ”

Sun Yuhan glanced at him: "I see that you haven't figured out the situation at all." ”

"Senior sister, please give me advice."

"Let's talk about the qualification requirements first, your company's qualifications are really not good, although the qualifications of our Longcheng Group Survey and Design Institute are not bad, but after the formation of the bidding consortium, it must still be at a disadvantage in the bidding process."

Sun Yuhan shook his head, thinking, this kid must also know that he is bronze and wants to hug Jin's thighs.

Hearing that his own construction qualification level was too low, the junior muttered softly with a slightly red face: "The company has just been established, doesn't it take time for development......

"Okay, I'll let you ...... in vain" The upright Sun Yuhan has a P... The word iao almost blurted out, but fortunately he cleverly closed his mouth, "In vain...... If we take advantage, then we have no hope for this project at all. ”

THE JUNIOR BROTHER ALSO SEEMED TO GET TO THE FIERCENESS OF THE SENIOR SISTER'S WORDS, BUT HE ONLY HELD HIS FOREHEAD, WITH AN EXPRESSION OF WILLINGNESS TO HEAR IT.

So, Sun Yuhan picked up the information in front of her again, and she said while flipping through it: "Although your company has only been established for a short time, you should also know that EPC projects are generally in deep water." ”

The junior nodded, indicating that he knew more or less about it.

Sun Yuhan's eyes finally locked on the opening time of the bidding project and pointed it out to the juniors.

"You see, on April 30, the Internet was opened, and the bid was opened on May 15, and there was a May Day holiday cleverly interspersed in the middle."

"Time is tight, and when the average person sees this project, it will only take about ten days. Who can complete the design work of construction drawing design and the whole process of construction in such a short time, even if it is conceptual. Even if it is barely completed, it must be shoddy. ”

The junior brother blinked and thoughtfully: "So, someone has already intervened in this project in advance." ”

When it comes to this, people with bright heads basically understand.

I'm afraid that this project has already been operated by someone before it was officially established.

……

During the new book period, please support more, vote, collect, and book lists, and rely on everyone.

May everyone stay away from the epidemic.

Salute to those who are on the front line of epidemic prevention and control.