Chapter 107: Optimizing Production
Hua Kejing watched as rows of robots had come out of the building of the Faculty of Architectural Engineering of the [Engineering Research Institute].
They soon walked into the prefabricated component factory and began the optimization and upgrading work.
As a supplier of prefabricated prefabricated components, Jianneng Company is the best choice for Huake Mirror in terms of geographical factors.
Although the industry level and technical strength of Jianneng prefabricated components are not very high in China, it has also invested tens of millions of dollars before and after to have the current scale.
This is also the reason why Huakejing does not consider building its own prefabricated component production line for the time being.
At this stage, where is he going to pay tens of millions!
In fact, the goal of Huake Mirror is not high, because too much optimization and improvement cannot be achieved in reality.
Come on, that's someone else's delivery room and production line after all.
If you say change it, how old are you?
Therefore, more transformation and optimization are only carried out at the soft level of accurate debugging, data optimization, and efficiency improvement.
During this time, in the virtual world, in addition to completing the optimization and upgrading of the production line of Jianneng prefabricated components, Hua Kejing also had to use the power of the Design Institute of the Faculty of Architectural Engineering to complete the design scheme of the [Lucheng City Transportation Bureau Business and Technical Housing EPC Project].
Thinking about it, Hua Kejing left the factory under renovation, strode into the [Engineering Research Institute], passed through the fountain in the center of the small square, and went straight to the main building.
Although he was used to seeing busy robots shuttling in the main body of the building, he still couldn't help but want to complain to Xiaole: "It's really idle, I have to get so many vain things!" ”
The office area of the design institute is located on the fourth floor.
Because the application level is classified, Hua Kejing directly found a robot leader on the fourth floor of the supervisor and handed her the information related to the bidding project.
After succinctly assigning the task, he turned around and walked around the rest area on the second floor.
Guess what Hua Kejing saw?
"There are so many robots here to eat, drink and have fun!"
Faced with this situation, just like the first time I heard that there was a comfortable rest area in the Faculty of Engineering building, Hua Kejing was shocked.
"Banana ......"
Hua Kejing thought that these were all little bees who worked diligently for him, and his heart suddenly became respectful, and he hurriedly swallowed the second half of the bala music that he didn't blurt out.
Who said robots don't need rest areas!
Who said robots don't know how to enjoy life!
Can you believe it!?
……
Time knows the taste and passes quietly.
Since the day Sun Yuhan sent off his younger brother, the work of forming a consortium to participate in the bidding has rarely been mentioned.
Of course, after the initial determination of the cooperation intention, she also reported the project to the company's leaders as soon as possible, and the business department also made corresponding preparations.
But as the backbone of the design institute, Sun Yuhan is busy every day, and there is a lot of important work to deal with.
Therefore, the energy invested is relatively limited, and there are reservations about this project, which is still uncertain.
As agreed before, the design plan must be reviewed by Sun Yuhan before bidding, and if the quality is too poor, or there is a suspicion of accompanying the bid, she has the right to refuse to cooperate.
In this way, it is a situation that can be advanced and retreated for Longcheng Survey and Design Institute.
If this project is completed, the company will be able to take on the next big project.
If it doesn't work, at least there is no loss, the fees that should be charged are collected, and even the design plan is done by the other party. Here we are just checking or making necessary deepening modifications according to the requirements of our own design institute.
It's just that Sun Yuhan still can't be sure what kind of medicine is sold in his junior brother's gourd.
Although the other party was full of confidence, Sun Yuhan still had doubts.
In such a short period of time, is it really possible to complete such a complex design task on schedule?
Calculate the time, it is not two days before the bid opening, and no matter how the plan is formed, it should be formed.
Thinking of this, she called her younger brother, and happened to connect with other materials for the joint bidding.
……
Two days later, it was a clear day.
A well-dressed man, about 50 years old, sat in a smoothly moving car with a spring breeze on his face.
The driver's level of driving is quite skillful, carrying the middle-aged man slowly through one morning congested street after another.
The man's surname is Cai, his name is Zhihe, and he is the No. 1 figure on the stage in the construction industry in Lucheng City and even Minyue Province.
Although the starting point is not high, Cai Zhihe entered the industry early and can endure hardships.
As early as the early 90s of the last century, without education and technical expertise, Cai Zhihe, who was born as a mason master, finally made up his mind after thinking night after night, and borrowed money to buy several mortar machines, a number of three-wheeled bucket trucks and other small tools and equipment.
With the initial prototype and the formation of his own construction team, Cai Zhihe was full of enthusiasm and passion and took a simple but extremely difficult first step.
At this time, the car had already left the city and ran to a courtyard located on Jinbang Mountain in the suburbs.
Tsai's early experience was not smooth.
In the late 90s, Rao was able to obtain the fourth-level construction qualification through years of hard work for his construction team (now the lowest is the third-level construction qualification).
At that time, the number of employees was only 10 people, and the company only relied on some small projects and small projects to make a living, with an annual output value of less than 500,000 yuan, and few fixed assets and working capital.
This situation did not change completely until the company stepped into the millennium.
Under the new situation, Cai Zhihe grasped the trend of the times, bathed in the spring breeze of reform, innovation and development, and caught the train of the rapid development of the times.
The initial capital accumulation was completed, and the development of the enterprise gradually reached a new level.
Through the integration of the resources of 6 construction enterprises, Hongyuan Construction Group Co., Ltd. in the hands of Cai Zhihe has made a qualitative leap in talents, technology, machinery and equipment.
Today, Hongyuan Construction Group has not only obtained the special qualification for general contracting of construction, but also become a leading construction enterprise in the entire Minyue Province, with an annual output value of more than 10 billion.
As the boss and helmsman of the group company, Cai Zhihe is naturally famous.
Around the mountain road, the frame arrived at the courtyard, and as soon as he stopped, a service staff had already come forward to open the door for him.
"Good morning, Mr. Cai." The young female secretary greeted with a smile.
Cai Zhihe nodded to everyone, and then walked into the courtyard.
This annex is a place built by the real estate development company under Hongyuan Construction Group and used to entertain important guests.
The architectural style is the new style of China, which is not only dignified and dignified, but also does not lose the atmosphere of the times.
On the periphery of the annex is a Soviet-style garden.
In the meantime, rockeries and ponds, pavilions and pavilions, high and low trees pitch and live.
Through the undulating corridors and the reflection of the water waves, Cai Zhihe came to the largest hall in the center of the courtyard.
The door of the house hangs a clean nanmu, and there are three big characters on the book Hongyuantang.
The windows in Hongyuan Hall are bright and clean, and in the middle is naturally a circle of guest seats, and on the left side is a row of wooden lattices with various utensils collections, and on the right side is a simple long rosewood bookcase, with excellent pen, ink, paper and inkstone.
It is said that when Cai Zhihe had just made a fortune, he was indeed deeply drunk and golden, and he couldn't extricate himself from the tender touch of the club.
But in recent years, as the level of his exposure to characters has continued to climb, he has gradually become aware of the problem.
To put it bluntly, in the final analysis, those who boast of elegance and elegance in power are looking down on themselves.
Not to mention that some people are secretly mocking him behind his back that he is a local boss and an upstart.
As a result, this other courtyard that cost hundreds of millions of dollars appeared decently.
Since then, Zen tea calligraphy, calligraphy and painting have replaced large gold chains and small watches.
Cai Zhihe seems to have suddenly become the legendary elegant person, and the things he plays are becoming more and more high-end and obscure.
……
During the new book period, please support more, vote, collect, and book lists, and rely on everyone.