Chapter 37 Construction Site Routine

Let's talk about the Yuanshayu construction site.

In the past period, in order to recover the construction period lost due to the accident, the construction site of the Yuanshayu Cultural Center has been working overtime almost every day and night.

This kind of work intensity not only makes the construction team disgraced and miserable.

Even residents in the vicinity of the project site were overwhelmed and had to endure the outrageous noise generated by the construction at night.

However, this is also a stopgap move that there is really no way to do.

The Yuanshayu Cultural Center is a key livelihood project in Lucheng, and the construction period is too hurried and the task is too heavy.

And in September next year, the BRICS summit will be held in Lucheng, and now the whole city is engaged in construction.

Even Lao Wang, the doorman at the construction site, knew that the city leaders were going to cut the ribbon when the project was completed.

Therefore, the construction team had to work hard under the pressure from various regulatory departments and continuous noise complaints.

Fortunately, the "Night Construction Permit" has been approved again, and in response to various complaints, the local construction administrative director and environmental protection department have only hardened their heads, turned a blind eye and handled them with care.

If there is really a lot of grievances, He Jin will take people to the community to send warmth and condolences to the residents around the construction site.

Bags of rice, baskets of vegetables, baskets of eggs, boxes of milk, bags of peanuts, barrels of cooking oil.

All kinds of New Year's goods are being sent out.

Anyway, all kinds of good talk, all kinds of understanding and understanding.

Not to mention, the final effect was quite good, and the situation was finally successfully controlled.

As for Hua Kejing and Li Chenjing's new company, although the new company has been basically handed over, according to the previous plan, they must adhere to the basic professional ethics and work until the day when the construction site building is capped, and then they will officially resign and leave the project department.

After all, it is the most intense stage of the construction period, and it is not easy to temporarily replace the right construction personnel.

Moreover, He Jin gave a greater discount when he transferred the company, which is a matter of gratitude and mutual help, and they still understand the truth of mutual help.

……

In the blink of an eye, it was another night with the lights on, the blender and the vibrator roaring together.

Because the single-layer pouring area is large, and it is an ultra-long reinforced concrete structure, the construction technology requirements are high, and the amount of concrete poured at one time is large, so the pouring project of the ninth floor slab is dry from day to midnight.

Hua Kejing is on duty at night these days, so he is now also on the roof of the building to check the operation of the pouring surface he is responsible for.

At this time, more than 90% of the concrete pouring has been completed, the steel bars have basically been covered, and the construction team is carrying out the initial leveling work.

After checking the elevation lines on the four corners of several columns, Hua Kejing organized workers to pull the lines between the columns and measure them from the line downward.

If it is low, it is necessary to call the workers to make up the level with concrete, and if it is high, it is necessary to shovel off some to keep the overall level.

After the concrete was poured, he organized the workers to collect the concrete surface again, and finally maintained the general fine hair.

This is followed by the curing of the concrete.

After the concrete is poured, the final setting time is generally 5-7 hours, in order to ensure that the concrete has suitable hardening conditions, gradually solidify and harden, and the strength continues to grow, the concrete must be cured.

Although Yuanshayu is an island, but there is little rain in winter, the air is relatively dry, if not maintained in time, the concrete will form a dehydration phenomenon, so that the cement particles that have formed a gel can not be fully hydrated, can not be converted into stable crystals, lack of sufficient cohesion.

Moreover, when the concrete does not have sufficient strength, the premature evaporation of water will also produce large shrinkage deformation, dry shrinkage cracks, and affect the durability and integrity of concrete.

So, after a group of people had been working for a few more hours, it was dawn.

"Xiaohua." Someone shouted behind him.

"Huh?" Hua Kejing followed the prestige, it was Li Chenjing who came to work with him.

Li Chenjing walked up to him and said, "Go and eat, and rest early after eating." ”

"Okay, you'll take care of the rest."

Hua Kejing patted Li on the shoulder, then turned and walked towards the freight elevator.

The previous work has been almost done, and there is nothing to explain, which can be regarded as cheaper Li Chenjing's grandson.

After continuous high-intensity work, he was indeed tired, not only unkempt, but also covered with mud and water.

However, looking at the hard-working workers and masters around him, after a busy night, the black clothes on his body have already turned gray and white, like a clay figure poured concrete.

Their faces, their heads, are simply unrecognizable.

If you don't look closely, or if you don't know it well, you won't dare to recognize each other at all.

Seeing that everyone was shivering in the cold wind in the early morning, Hua Kejing dared to complain more.

Standing on the edge of the roof, looking at the red sun that was slowly rising and brighter on the sea level in the distance, he couldn't help but sigh in his heart.

Life is not easy, banana plus bala.

How can there be so many years of quietness.

If you live an extraordinarily easy life, someone must have carried your share of the weight for you.

All living beings are suffering.

Especially this group of people who are begging for a living on the construction site.

……

Back in the cafeteria, I drank a bowl of hot porridge, ate a long and thick fritters, and killed a bowl of peanut soup and three braised eggs.

Hua Kejing finally felt his body warm.

Last night, the cold wind blew on the roof of the building all night, and my brain was paralyzed.

With a long breath, he leaned back in his chair, thinking about whether to have another bowl of hot porridge, so he asked his aunt for a fried dough stick that had just come out of the pot.

This is the daily life of a construction site dog.

In the past two years, I have been eating and living on the construction site, and the life of Hua Kejing has always been simple.

But he knew that would soon change.

As a result, Hua Kejing's mood was full of ambition for a while, and a touch of sadness for a while.

Looking at the fritters he had just grabbed in his hand, he suddenly felt so melancholy.

You may never be able to eat such delicious fritters again in the future.

What can I do?

Thinking of this, he took another bite of the fritters and chewed them carefully.

But before I could swallow it, some old things were inexplicably remembered.

……

During the new book period, please support more, vote, collect, and book lists, and rely on everyone.