Chapter 142: March to the Desert

May.

Galaxy Group is working hard to develop superconducting supercomputing chips.

The Mars Group, on the other hand, acquires silver at home and abroad in the name of business needs and investment in precious metals.

Fengdu Group's rural cooperative project is in full swing, and has invested in the construction of more than 7 million acres of greenhouses.

One-fifth of the greenhouses are already in trial operation.

Of course, Fengdu Group's other plans have not been left behind, and the green earth supermarket, fresh logistics warehouse and distribution center in each city have been rolled out all over the country, and have now covered 43% of the cities in the country.

Obviously, these investments are not a few, and the cost of one acre of greenhouse land is about 1,800 Chinese yuan, which means that the investment in greenhouses alone has cost nearly 13 billion Chinese yuan.

However, this money is nothing to Fengdu Group, because most of the 13 billion Chinese yuan is circulated by Galaxy Technology's own enterprises.

That's the equivalent of turning your left hand to your right hand, which seems to cost a lot, but in fact it doesn't cost more than half.

After all, reinforced cement glass, agricultural machinery and equipment, wind turbines, and storage batteries are all produced by themselves, and even the construction workers are responsible for the Planet Group.

Obviously, the money is earned by their own people, which is why Fengdu Group has the confidence to engage in this kind of project, and others are only dead end.

Raytheon Group is blowing the sea breeze in Bohai Bay and eating sand in the Mongolian area, obviously the country's 100 billion Chinese yuan is not so easy to earn.

The Bohai Rim desalination plant and pipeline system are already under construction, and the main force of these two projects is the national team; The wind power station in charge of Raytheon Group, and the greenhouse in charge of Fengdu Group.

The entire project is expected to generate 600 billion kilowatt hours of electricity annually, produce 20 billion cubic meters of fresh water, and build 20 million acres of greenhouses.

It is expected to produce about 4 million tons of soybeans (planting 10 million mu, yielding 200 kg per mu, and two crops a year); about 8 million tons of corn (planted 5 million mu, 800 kg per mu, two crops a year); About 20 million tons of potatoes (planted 5 million mu, 2,000 kg per mu, two crops a year).

Of course, this first phase of the blueprint.

Because the greenhouse area of this project is in the sandy land of Hunshandak.

That's right, this project of Galaxy Technology and the country was built in the middle of the desert.

Hunshandak Sandy Land is one of the top ten desert sandy lands in the Eastern Tang Dynasty, located at the southern end of Xilin Gol grassland in the central part of Mengqu District, 180 kilometers away from Beiping urban area, and is the closest sand source to Beiping.

The Hunshandak Sandy Land is about 450 kilometers long from east to west, covers an area of about 52,000 square kilometers, and has an average altitude of more than 1,100 meters.

Huang Haojie plans to completely transform this sandy land into a greenhouse area.

So how many acres of land is 52,000 square kilometers equivalent to? It is equivalent to 78 million acres of land.

In other words, in the first phase of the plan, more than 26% of the area of Hunshandak Sandy Land will become a greenhouse area.

If the Hunshandak Sandy Land is transformed, there will still be 1.25 million square kilometers of desert or desert in China waiting for Galaxy Technology to pamper it.

Even if half of it is used, it is as high as 620,000 square kilometers, equivalent to 930 million mu of land, more than half of the total cultivated land area of the Eastern Tang Dynasty.

What's more, the greenhouse has a high yield, and one acre of land can be equivalent to two or three acres of land.

These greenhouses will mainly grow grain, feed, oil and wine crops to make up for the domestic food security problems in the Eastern Tang Dynasty.

……

Fang Ping and Zhang Haifeng spent the New Year in the Hunshandak sand in the Mongolian District.

Looking at the first wind power station group that had just been completed, Fang Ping licked his chapped lips and complained:

"When I go back, I must ask the boss to send me a five-fold bonus, and by the way, I will also send a beautiful secretary."

His assistant stood behind and silently did not speak.

"I said Mr. Fang, don't complain, be careful that the boss asks you to go to the Taklamakan Desert to build a wind power station." Zhang Haifeng is also like air-dried old bacon.

"! If you don't say I don't think so, this possibility is really very big! Could it be that I, who am handsome and chic, am destined to build wind power in the northwest for the rest of my life?" Fang Ping seemed to feel deeply malice.

"I heard that the girls in the territory are all white and beautiful, convex and backward!" Zhang Haifeng muttered solemnly.

"Haha...... I like the Great Northwest the most! Fang Ping suddenly came back to life with full blood.

"Huh! You're a girl who likes the Great Northwest! Zhang Haifeng complained.

The two of them were complaining bitterly.

Not far away, Ma Tai, the vice president of the national team, had just finished inspecting the wind power station group and came over with satisfaction:

"Mr. Fang! Chief Engineer Zhang! ”

"Mr. Ma, what's the matter! The quality and performance of our Haifeng wind power are all leveraged. Fang Ping said with a smile.

"Very good!" Mattei nodded.

The first wind power plant group, with an installed capacity of 10 million kilowatts, can achieve an annual power generation of about 80 billion kilowatt hours.

Due to the improvement of wind turbines and generators by Haifeng Wind Power this year, such as the use of carbon fiber as wind turbine materials, the efficiency of wind turbines has successfully reached about 63~66%.

In addition, the Hunshandak Sandy Land is a wind-rich area, which is very conducive to the layout and production of wind power plants.

The power of Haifeng Wind Power's super-large wind turbine has reached 50,000 kilowatts.

This wind farm complex is equipped with a total of 200 super-large wind turbines.

"By the way, Mr. Fang, how are you doing at the wind power station in the Bohai Rim region?" Mattei asked suddenly.

"One wind power station with an installed capacity of 1,000 kilowatts has been built, and another has completed about 40% of the project." Fang Ping explained.

"In this way, at least six tens of millions of kilowatts of wind power stations can be completed in Mongolia and the Bohai Rim this year?" Mattei asked, after thinking about it.

Zhang Haifeng on the side nodded: "It should be seven, and Bohai District can complete four!" ”

"Mr. Ma, how is your water pipeline completed?" Fang Ping is also more concerned about this issue.

The length of the water pipeline from the desalination plant in the Bohai Sea region to the Hunshandak sandy land is 450 kilometers.

Of course, due to the good fluidity of the water and the fact that it is not flammable and explosive oil, the construction cost is not as expensive as the oil pipeline.

"I'll take a look!" Mattei took out his notebook and flipped through it:

"The laying of 134 kilometers of single-line pipelines has been completed, and it will be completed around November this year."

The starting point of this water pipeline is at the junction of Liaodong Province and Hebei Province, that is, the junction of Qinhuangdao City and Huludao City; The end point is Sangendalai in the Mongolian district.

The annual water transport of a single line is 15 billion cubic meters (tons).

Can 15 billion cubic meters of fresh water meet 2 million acres of greenhouse farmland?

In the Great Wall wind beach area of Qin Province, an acre of land needs to consume an average of 140 cubic meters of fresh water a year, while the water consumption of greenhouse drip irrigation is about 40%, that is, about 50~60 cubic meters a year for an acre of land.

In this way, 20 million mu needs at least 10~1.2 billion cubic meters of fresh water a year.

Obviously, the water pipeline is more than enough to carry water.

The reason why it is so large is that the pipeline also needs to supply fresh water to cities along the route.

If the desalination plant of Galaxy Technology is successfully put into operation and the cost can be reduced, the above will consider preparing to build a desalination plant along the coast of the Bohai Sea and the Yellow Sea to supply fresh water to the entire North China Plain and the Northeast Plain, and even lay pipelines in Guanzhong, Mongolia and Xinjiang.

Now the various projects are being accelerated in an orderly manner, waiting for the desalination technology of Galaxy Technology to be launched.

()

Sogou