Chapter 54: Striking
in the test ground.
More than an hour passed.
Sun Wenming and the person in charge of the test site looked at each other, looking at the unreal range in front of them.
326!
It turned out to be 326 kilometers!
It's no wonder they're so surprised, after all, the previous fraudulent electric cars have made them numb.
They generally see that the range of electric vehicles of car companies will be discounted by seven percent, or even more excessive, and even half of them cannot be reached.
In fact, the mileage of an electric vehicle can be divided into: actual mileage, official mileage, and enterprise mileage.
The actual mileage is the owner's own run, which is the most real data; The official mileage is tested by the Ministry of Industry and Information Technology's test site, and this credibility is between the ideal value and the real value.
The enterprise mileage is definitely the most unreliable existence, and they will mark the ideal value in order to make the data look good and attract consumers.
"It's the first time I've seen such an honest car company, and their target mileage is measured!" Sun Wenming said with a smile.
The person in charge of the test site looked at the surging and elegant round body, and said with a smile:
"Haha, I suddenly appreciate this surging momentum."
"Then let's continue testing."
The MIIT test will take two months at the earliest, after all, there are still many details and other aspects to be tested.
……
Lingnan Meicheng City.
Fifty freshly baked Haifeng 1 wind turbines have been sent to the Thor charging station here.
As for the Thor-modified battery, it was already in place half a month ago.
The Leishen charging station in Meicheng's Dongcheng District has a three-story building covering an area of 300 square meters.
Engineers from Haifeng Wind Power are installing wind turbines on the roof of the building.
Since other wires and switches, as well as supporting facilities for fixing the wind turbines, have already been prepared in advance.
With the help of a crane, a wind turbine was installed in the already designed clamping slot.
Several workers tighten the screws in order.
Zhang Haifeng personally went to the site to check the installation, and also inspected the surrounding environment.
Due to the mountainous nature of Meicheng, it belongs to the fourth level of wind energy area, that is, the wind energy poor area.
The wind energy in Dongtang is divided into four levels, namely abundant area, relatively abundant area, available area, and poor area.
The abundant and more abundant areas are mainly hit in the north-west, north-east, and south-east coastal areas.
Therefore, the current wind power stations are concentrated in the northwest, northeast and southeast coastal areas, among which the wind energy rich area in Inner Mongolia is the largest, and almost the entire province is rich and relatively rich area.
How to divide the level of wind energy abundance, the abundant area is the effective wind energy power greater than 200 watts per square meter, the richer area is 150~200 watts per square meter, the available area is 50~150 watts per square meter, and the poor area is less than 50 watts per square meter.
Only a few small wind turbines can be installed in poor areas.
Meicheng is not without wind, but because the mountain wind is more scattered, and it is more difficult to use it from time to time.
"Zhang Gong, the installation is complete, and the power generation can be tested."
Hearing the shouts of the workers, Zhang Haifeng came back to his senses from his thoughts.
"Okay, let's get ready to start trial power generation."
As soon as Zhang Haifeng's words fell, the workers became familiar with the operation.
First, they pull down the brakes of the wind wheels.
Although the wind in Meicheng is not strong, the wind speed is only between 3~4 meters per second.
However, the Haifeng 1 wind turbine, which has a very low wind speed, was started immediately.
Zhang Haifeng was in the machine room next to him and saw the power generation, and fifty 50 kWh wind turbines generated electricity together.
The meter shows 0.42~0.49 kWh of power generation per second, Zhang Haifeng knows that this is not the peak, the peak should be between 0.55~0.6 kWh per second.
However, with the wind energy situation in Meicheng, with this number, he is already very satisfied.
According to the current power generation situation, it is estimated that it can generate 3.5~36,000 kWh of electricity a day.
Based on the surging and elegant charging capacity of one vehicle, the power generation capacity of this day can meet the charging needs of at least 600 surging and elegant vehicles. If it is an electric car, it is estimated that it can be charged to tens of thousands of vehicles.
That is to say, this charging station, at present, does not need to be supplied to the Dongtang power grid, if the storage is really not enough, it will be supplemented from the power grid.
At least now it is definitely enough, after all, the surging electric vehicles have not yet been listed, and the electric vehicles that come to charge are all Thor's electric vehicles, and these electric donkeys have about two or three kilowatt-hours of electricity at a time.
Therefore, the storage of the charging station of the Thor system is temporarily surplus.
Huang Haojie has asked Fang Shengjie to negotiate with Dongtang Power Grid Company about wind power grid connection.
Why Fang Shengjie went, the main reason is that Haifeng Wind Power Company is a subsidiary of Raytheon Group.
Moreover, Raytheon Integrated Service Company not only has its own charging stations, but also the charging stations built by other companies in the Raytheon Department are subject to the unified guidance of Raytheon Integrated Service Company.
All Raytheon charging stations are controlled by the total system of Raytheon Integrated Service Company, that is to say, each charging station, how much electricity is stored, how much electricity is generated every day, and how much electricity is consumed, they can see clearly through the total system.
For the charging stations of Yadea, Raytheon Integrated Services has the dispatching power of their power to store, generate and consume electricity, and there is also 20% of the revenue of the charging station.
……
The CEO of Dongtang Power Grid Company was busy reading the report sent by the assistant.
Well? Raytheon Group's application for wind power grid connection? Aren't they engaged in batteries? How to start wind power?
Flipping through the application form of the Raytheon Group, the more he looked at it, the more shocked he became.
Power storage-charging station plus wind power, plans to achieve an annual power generation of 40~6 billion kilowatt hours, and plans to establish a wind power station group in the coastal areas of eastern Guangdong, plans to achieve an annual power generation of 20 billion kilowatt hours.
You must know that the scale of wind power generation in Dongtang this year is only about 240 billion kilowatt hours.
If you want to achieve 10% of the national wind power production capacity of Leishen Group, you will not be bragging.
However, when he saw the technical parameters of the Raytheon-modified battery and the Haifeng 1 wind turbine, he couldn't help but wipe his eyes.
A battery with an energy density of 240 Wh per kilogram? Vertical wind turbines with power generation of 52~55%? Are you sure it's not a joke?
The CEO of Dongtang Power Grid immediately calculated that if the data is true, it means that wind power and photovoltaic power will enter a controllable state in the future.
Instead of generating 1,000 kWh of electricity now, half a kilowatt-hour is wasted in energy conversion.
In addition, it can also avoid the contradiction between peak and trough periods.
Taking Lingnan as an example, we can see the contradiction, where electricity consumption in summer is greater than in winter, and daytime is greater than night.
In this case, the time and space of electricity consumption are uneven, resulting in power generation must also be accompanied by time and space unevenness.
The problem is that the uneven time and space of electricity consumption is very simple, but the uneven time and space of power generation is a big problem.
Because the efficiency of the power generation station is the lowest when it is running at low power, if the power generation station is running at high power, 1 ton of coal can generate 2500 kWh; Then when running at low power, it may be less than 2,000 kWh of electricity per ton of coal.
In addition, wind power and photovoltaic power sources are unstable, due to the influence of natural factors, power generation is large and small, which brings huge trouble to the grid-connected management of the power grid.
After thinking for a while, the CEO of Dongtang Power Grid decided to take the time to go to Lingnan Shanmei to have a look.
If it is true, it can save at least 10~20% of Dongtang's electricity every year, and at the same time reduce the cost of power generation.
He approved Raytheon's application for grid connection and asked his assistant to arrange the time.