Chapter 347 Power Distribution
The fusion power station of Xinghuo Technology is generating a steady stream of electricity.
The direct current energy delivered by the thermoelectric generator is transported to the substation next to the nuclear fusion power station.
Through the conversion of the substation, it is converted to a standard AC voltage of 10KV.
Through the backbone transmission network set up by the State Grid, the electric energy is transmitted to every household in China.
However, the grid-connected power generation of nuclear fusion power stations is indeed a big test for the transmission backbone network of the State Grid.
At the headquarters of the State Grid in Yanjing, Chairman Cao Jun is keeping an eye on the power allocation.
Huaxia State Grid has the world's largest power distribution capacity.
Either a country with a large amount of electricity generation is a power power, and only electricity can flow in an orderly manner according to the command of human beings, which is the sign of a power power.
If there is no cross-regional power allocation, it will only cause power in one region to exceed the standard and the other region to underpower. This is to have very serious consequences.
In the past 20 years, there have been no vicious power accidents in China that have affected most parts of the country. This is the strength of the State Grid.
Cao Jun is confident that he will complete the deployment of this huge amount of electric energy.
The fusion power station generates electricity and is connected to the grid, at the moment when the power generated by the fusion power station is connected to the transmission backbone network.
It will have a great impact on the entire network, and if this matter is not handled well, it will definitely cause the paralysis of most of the country's transmission backbone networks.
The nuclear fusion power station is connected to the grid, and the entire system of the national grid will usher in major challenges.
Cao Jun asked Hu Xianguo, general manager of the State Grid, who was in charge of power allocation this time: "Old Hu, how are you preparing for power distribution, there is news from Xinghuo Technology that the nuclear fusion power station will be started soon."
Hu Xianguo said confidently: "Lao Cao, we have made sufficient preparations to ensure that after the nuclear fusion power station is connected to the grid, it will not paralyze the transmission backbone network."
He took this opportunity to give Cao Jun a complete explanation of the plan they were going to implement.
The power generation power of Xinghuo Technology's nuclear fusion power station is too large, and this nuclear fusion power station alone will account for more than 80% of the total domestic power generation.
The State Grid has received an order from the National Development and Reform Commission (NDRC) that while fusion power plants are connected to the grid, the state will cut out all thermal and nuclear power plants.
Only a limited amount of hydropower and new energy generation will be retained for the exploration of new technologies.
The power generated by a nuclear fusion power station does not reach its maximum value in an instant, it changes according to a certain curve.
The State Grid has taken advantage of this opportunity to gradually take other types of power plants off the grid based on the power generated by fusion power plants.
Cao Jun knew about this plan before, because this is the only one that can be viable.
If the power of the grid load exceeds the standard, the excess power can only be reduced.
Nuclear fusion power plants cannot be reduced. That would only reduce the impact of thermal power and nuclear fission power plants, which are harmful to the environment.
Hu Xianguo explained in more detail, such as their fast and precise control through quantum computers. Complete power compensation and power substitution work.
Cao Jun lamented: "The most critical part of power distribution is to act according to the plan at every step.
The capacity of a fusion power plant is so large that if one of the plants is not withdrawn as planned, the margin of our entire system peaks, and the system will be paralyzed.
We can't shut down certain power stations in advance, because after these power stations are closed, the power of the nuclear fusion power stations has not been replenished to the grid.
It will cause large-scale power outages and have a chain reaction, causing extremely significant economic losses. ”
Hu Xianguo said with a serious expression: "In this case, we can only fight once.
We have cooperated well with Xinghuo Technology, and in extreme cases, Xinghuo Technology's nuclear fusion power station will be disconnected from the national grid.
They will use their special power-consuming equipment to unleash the vast amount of electricity generated by the fusion power station.
Even in such an extreme situation, it will not cause the paralysis of the national transmission network.
But once Spark Technology starts this process, it means that the fusion power station has failed to connect to the grid for power generation.
In a short period of time, we will not be able to use the electricity generated by nuclear fusion power plants.
We can only wait for technological breakthroughs and spend huge sums of money to upgrade our transmission backbone network. ”
Cao Jun's expression was completely relaxed, and he said with a smile: "Xinghuo Technology still has this kind of preparation, so I will say that Chairman Zhou Yu never fights uncertain battles.
They couldn't risk destroying the national grid and get a fusion power plant connected to the grid, and they were prepared.
It's a lot easier for us, we just have to do our job. ”
Cao Jun was completely relieved, he was surprised how the NDRC could agree to such a risky matter.
It turns out that this matter is not risky at all, at most, the nuclear fusion power station cannot complete the grid-connected power generation.
He went to Southeast Asia some time ago to discuss the issue of Huaxia power transmission with Southeast Asian countries, and he didn't know much about the details of Xinghuo Technology.
"Boom! Boom! Boom! ”
A loud chime sounded in the office.
Hu Xianguo's eyes immediately became sharp, which was a signal that the nuclear fusion power station of Xinghuo Technology was about to be connected to the grid for power generation.
"Everyone cheers up, we must race against time to complete the power allocation work."
The Xinghuo Technology Nuclear Fusion Power Station officially began to be connected to the national grid for grid-connected power generation.
The State Grid engineers began to stare nervously at the data.
They fed various parameters into the quantum computer, and began in Nanyu province to shut down the connection of thermal power stations to the national grid.
"The power generation power of nuclear fusion power stations is growing rapidly, and the load on the national grid has exceeded the standard."
When Hu Xianguo heard the news, he immediately issued an order: "Turn on the peak power distribution system of the power grid, and step up the shutdown of thermal power stations in other provinces."
If fusion power plants continue to grow rapidly, they will begin to shut down other nuclear power plants. ”
The State Grid has launched a peak power distribution system, which is mainly designed to balance the power changes between the daily power consumption peak and the electricity consumption trough.
It is used to consume excess power by charging particle batteries and using high-energy-consuming industrial equipment.
"The load of the national grid is approaching stability."
With a smile on their faces, they were about to finish the project when an accident struck.
"No, the power generation of nuclear fusion power stations has risen sharply, and the peak power distribution system has no remaining power distribution capacity."
Cao Jun stared nervously at the load of the national power grid, and he was now afraid that the entire power grid would be paralyzed.
Hu Xianguo was about to press the red button on the operating platform and ask Xinghuo Technology to activate the emergency plan.
He suddenly found that the load of the national grid had returned to normal, and they had passed the most difficult hurdle.
Hu Xianguo immediately called out the last moment, how to solve the load situation of the national grid.
In the end, he found that it was the geothermal power stations across the country that suffered equipment damage and took the initiative to disconnect from the national grid.
This should be Xinghuo Technology's discovery that the power generation of nuclear fusion power stations is growing rapidly, and actively disconnect the geothermal power station from the national grid.
Only in this way can the load of the national grid exceed the standard in an instant.
Hu Xianguo saw that the fusion power station had been integrated into the national grid, which was now running smoothly.
He said excitedly: "Although there was an unexpected situation, we succeeded."