mine

Recently, in the conference room of the electrical repair workshop of the Dalong Mine Electromechanical Repair Factory, the workers listened to the workshop director Di Feng after conveying the notice in the mine, and all scratched their ears and cheeks.

It turned out that the mine urgently needed 5,000 cable bottom hooks in the early stage of Dongsan 705 mining, and the factory leader ordered: before the four o'clock shift on the second working day, the task of loading into the well must be completed, and none of them should be missing.

"Now, we have prepared about 2,000 in the library, and the remaining 3,000 or so, we need all teams to start from now on, in addition to the time to eliminate the existing workload, fully cooperate, work overtime to catch up with the work, resolutely complete the task, and solve the urgent need of underground production." Di Feng, the director of the workshop, was resolute.

"It's difficult, the existing cable hooks are full of dirt and hard lumps, and it's hard to brush."

"Besides, our work schedule is full today, and we can't open the space?" For a while, everyone started talking about it.

"Otherwise, let's throw the hook into the pool of the workshop cable water resistance test, which is big enough and has a lot of water." Cable group foreman Fu Zhai Shihai suggested.

"This method works, but it is a pity that more than 20 cubic meters of water in the pond will be wasted." Wang Hai, the electrician squad leader, was a little distressed.

When everyone was at a loss, I saw Director Di Feng take out his mobile phone and take a look, frowning and saying, "Okay, don't worry, everyone is in a hurry, each team will start working in place." But before the start of construction, please transport the more than 3,000 cable bottom hooks to the empty yard in the backyard of the factory to dry, and then brush it tomorrow. ”

"It's still tomorrow, and I can't even finish the spin today." Seeing everyone's puzzled looks, Di Feng just smiled and didn't say anything.

Unexpectedly, just after the afternoon, a cool breeze blew through the window of the workshop, and the heavy rain fell from the sky in an instant, and the raindrops slapped the ground and crackled.

The rain came and went until the next morning. As soon as the sky cleared, the director led everyone to the empty field in the backyard and ordered to hurry up the brush.

The cable bottom hook was washed by the rain for a long time, and even the slime and hard soil blocks in the groove were soaked out, and the workers talked and laughed together, and brushed out 3352 cable bottom hooks in only one morning, and loaded into the well in advance.

"In ancient times, there was Zhuge Liang's 'straw boat borrowing arrows', and now there is our director 'borrowing wiper hooks', God counts!" Electrician Su Lidong shook his head and praised.

"God, I just glanced at the weather forecast on my phone." Di Feng replied with a smile.