Chapter 235: Small Goal of 10 Billion
Tesla's ostensibly seeking local investment and construction of factories in China this time is actually to negotiate with Bluestar, hoping to obtain the right to use the smart chip, and apply the chip to driverless cars, so as to establish Tesla's leading position in driverless technology.
Nowadays, the development of technology is very fast, and technology companies must race against time to obtain the maximum economic benefits.
Unfortunately, Tesla's team will not be able to meet Chen Nuo because Chen Nuo has already flown to Shanghai.
As the economic center of China, the most developed city, of course, all resources have to be tilted towards Shanghai, and the same is true for the most advanced waste treatment technology.
Because Shanghai's garbage disposal capacity was saturated a decade ago, and it has reached a very serious level.
According to the information obtained from the Shanghai market, in 2017, the domestic waste generated by the Shanghai market was 9 million tons, of which the treatment methods are as follows:
2 million tons were incinerated, 3.2 million tons were landfilled, 400,000 tons were comprehensively treated, and 100,000 were otherwise treated.
Some people say that after calculating the shortfall of several million tons, where will it go?
The shortfall is that the above-mentioned treatment has reached the saturation of the Shanghai market, and the others have been smuggled to the province by various means, and even millions of tons have been secretly dumped in Taihu Lake.
This made the people of Sioux Province quit! Why should you throw the garbage in Shanghai to Suzhou Province!
For this matter, the media in the two places even had a big war of words, and even got into the upper echelons of the country.
In fact, there is no way to do it.
Shanghai is a small place, with a large population density, and a lot of garbage is generated, and the garbage disposal capacity is definitely insufficient, which is part of the reason, and there is also the cost of treatment.
At present, the garbage disposal in Shanghai is mainly landfilled, and the cost of landfill is quite high in Shanghai, where every inch of land is valuable.
According to data from Shanghai, if a tonne of garbage is transported to the nearest garbage disposal station in Huangpu District, it needs to be collected and transported to the transfer station, which costs 140 yuan per tonne. After being compressed by the transfer station, it is transported to the wharf at a cost of 75 yuan/ton; The cost of water transportation is 230 yuan/ton; Coupled with the environmental compensation cost of 50 yuan/ton, the total is close to more than 500 yuan. This cost does not include the cost of landfill or incineration.
That is to say, the cost of disposing of a meal of garbage in Shanghai is more than 500 yuan, and it only takes more than 200 yuan to transport these garbage to Taihu Lake for disposal, and the difference in price can be imagined.
Falling on Taihu Lake is refreshing, but the disaster to the environment is terrible.
Now, the Blue Star Company is here, there is a new way to deal with garbage, although the construction of garbage disposal ponds to occupy space, but not like landfills, there is no land after burial, and the buried garbage is still there, still polluting the land, just to slow down its impact on human beings.
Through the Ministry of Environmental Protection, Shanghai finally surpassed Yanjing to become the first city in the country to reach an agreement with Bluestar. Bluestar will build three large-scale domestic waste treatment plants in Shanghai to process all domestic waste in Shanghai, located in the Huangpu River in Shanghai, and the treated water without pollution can also be directly discharged into the Huangpu River, which greatly reduces the cost of waste transportation and treatment.
According to the preliminary agreement between Bluestar and Shanghai, Shanghai will pay Bluestar 70 yuan for each meal of garbage disposed of, a price that increases with the increase in the average local wage.
The garbage disposal cost of 70 yuan per meal is a little cheaper than the current one and there is no pollution, and the Shanghai market is not willing to introduce it, that is a fool!
The environmental protection compensation of 50 yuan per ton given by the state has not been counted.
After preliminary calculations, Bluestar will obtain a gross profit of nearly 600 million RMB from garbage disposal every year (not counting environmental protection compensation, the same below), and if the consumption of artificial and environmental protection bacteria and culture medium is excluded, the net profit is about 400 million RMB (not counting the infrastructure cost of the garbage disposal station).
At the beginning, Wang Fangda set a small goal for himself, 100 million.
The statement also set a small goal for environmental protection bacteria - 10 billion.
He hopes that in the next five years, the environmental protection bacteria can complete the environmental protection task of 10 billion yuan, if all according to the garbage disposal standard of Shanghai is to process 140 million tons of garbage, which is equal to the amount of garbage in 17 Shanghai cities, which can fully meet the needs of the whole country.
This is no small business.
100 billion is not a turnover that will only take three or five years or ten or eight years, but every year!
When the environmental protection bacteria of Bluestar Company cover the whole of China, the whole of Europe, and the whole world, this kind of profit is an extremely terrifying number!
The money that Bluestar makes in environmental protection is equal to the money that other companies can't make in one or two hundred years.
Therefore, Chen Nuo attaches great importance to the construction of a garbage treatment plant in Shanghai, so he personally went to Shanghai.
At the Shanghai airport, the mayor of Shanghai and relevant personnel from the environmental protection department personally greeted him.
After a simple greeting, everyone did not stay and went directly to the site for inspection.
Garbage disposal is a major project that benefits people's livelihood, and it should not only consider ecological interests, but also economic interests.
In the past, most of the garbage was landfilled and incinerated as part of the landfill, both of which polluted the environment, so the construction site of the garbage treatment plant must be far away from the city, which virtually increased transportation and labor costs.
The basic freight of 500 yuan per ton for the disposal of garbage in Shanghai is how it came about.
Now the use of environmental protection bacteria treatment, no incineration, no landfill, only need to let the environmental bacteria in the treatment pool slowly enjoy the food, the treated wastewater can be directly discharged into the river, the dead environmental bacteria, Bluestar company should also be separately centralized treatment.
Therefore, as long as protective measures are taken at the treatment station to make the smell of garbage not fly to the sky, the garbage disposal station can be built closer to the living area.
The place to be inspected this time is located in the upper reaches of the Huangpu River, not far from the downtown area of Shanghai.
In the upper reaches is a catering and entertainment center, and there are many residential communities, which will cover just 5 million residents here.
After the mayor of Shanghai introduced the situation upstream, everyone was satisfied.
"But there is a special case." Said the accompanying homeland.
"We had no problem setting up the garbage pond next to the river, which happened to be a green space, but according to the minimum area given by Blue Star for the garbage disposal site, the green space was still a little bit close, and the building next to it needed to be demolished. There are no residential buildings next to it, and there is an old-fashioned commercial building with low floors. A total of 11 floors, built in the nineties of the last century, and now the property rights are owned by the Rock Group. ”
The director of the Land Bureau said: "Chen Dong, or, you will shrink the area of the garbage disposal station?" ”
Chen Nuo smiled, and drowsily touched the pillow, "Shrink?" Can't shrink, isn't it just a commercial building, demolition, must be demolished! The processing pool is not small at all. ”