Chapter 487: It's expensive
Laoshan Mountain.
"Work hard."
"I said one, two, three, let's carry it."
"One, two, three, hey!"
At the gate of Laoshan County, shouting the trumpet, a group of shirtless men suddenly put a steel rail on their shoulders and carried it in the direction of Dafengtai.
The people were puzzled.
"What are they doing here?"
"I don't know."
"I heard that Dafengtai is going to build a station."
"The station? What kind of station? Bus station? It's better to have a bus station, so you don't have to pay a lot of money to get a ride. ”
"But what kind of car is going to run on these railroad tracks? That's the track, right? What car can run well on that? ”
"Trains. I haven't heard of it, I already know that this batch is all train tracks produced by Qingdao County New Steel Factory, and all of them are manganese steel materials. Very powerful. ”
"Trains? A fire-breathing car? What kind of car is that? ”
"Let's go, follow along."
“……”
Dafengtai, a temporary shed, Li Zhen and others have already gathered here.
Watching the workers in full swing, I can't help but be impassioned.
A section from the beginning of Dafengtai to the wilderness of Licang County, there are construction sites rooted everywhere. There are constantly workers who follow the line of white lime scattering, according to the command of professional surveyors. Dig a ravine in all the roads and bury the 'road foundation' in it
Then the rails were lifted, and screws and buckles were used to connect the rails to the underground foundation.
Many workers are in full swing, and the progress of the project is very fast, digging trenches and burying railroad tracks. Then the steel beams are used to connect the rails on the left and right sides.
Very sturdy.
In the past month, the more than 10-kilometer-long section of railway tracks from Laoshan County to Licang County has basically been buried.
As the last section of the rail is lifted, it is connected to the last section of the winder. The entire section of the railroad track is all buried.
'Boom Boom'
Large steam cars began to drive continuously. Each car was filled with truckloads of gravel and sand with excellent water permeability.
Li Zhen turned around and asked, "It's about to be watered." Is the locomotive ready? ”
Fang Hanxian and others stood aside and accosted: "It's done." It was made in the factory in Qingdao County, and it is now being shipped to the future. ”
"The nose of the experimental rails doesn't need to be very precise. But from now on, it is possible to put the design of the locomotive on the agenda. It's already October, and it feels like it's not enough to save time, so I urge all agencies to speed up the process. Of course, while speeding up the process, quality must also be guaranteed. ”
"I know, Master Li."
Liu Jinghong said: "Master Li, Peng's test flight is also today. Will you be at the airport later? ”
"Let's take a trip. Peng-style is crucial, but it can't be sloppy. ”
After Li Zhen finished speaking, he turned around and asked, "Jia Liping." How's the process at the airport? Have you started to build it? ”
"Master Li, what you said before is to build thirty airports across the country. But Du Taiping said that he would send someone to watch the Peng-style test flight today, and if the Peng-style was successful, Du Taiping wanted to add 20 places. ”
Li Zhen frowned: "To build fifty airports?" The airport is now for foreign countries to see, and it is impossible to chew more than you want. Thirty is enough, but fifty is bound to not keep up with the progress of the project. ”
"Keep up. The Kyushu Party has made up its mind to build this transportation facility. They promised that they would definitely complete the construction of airports in 50 counties and counties across the country by March 20. ”
Li Zhen was silent for a while: "I don't care how many airport plans they want to add. But the 30 I am talking about must not be lost, and the 30 airports I am talking about must be built first. Other airports, after April, he likes to repair as much as he likes. ”
"I will send a report to inform Du Tianzi."
Li Zhen turned around and asked Liu Jinghong: "Is the Peng style okay?" ”
Liu Jinghong smiled confidently and patted his chest: "Guarantee to complete the task." Although the Peng type did not test fly for a long time, it conducted a long ground test in the courtyard. All the theoretical data is beyond the standard, and in the actual flight, the mission will definitely be completed. ”
"It has to be steady. Peng is a long-haul flight. ”
"Master Li, don't worry, we have built a total of ten Peng types. The technique is very mature, and the specifications of the Ten Cross Peng style are exactly the same. We tested all 10 crosses, and the power was much the same. This shows that my casting skills in New Kyushu have improved. After today's successful test flight, it will be ready for mass production. ”
Li Zhen nodded: "I believe in the Aviation Academy." After going into mass production, it was necessary to fly every day. You can't be sloppy on a long-haul flight, unlike the Grasshopper. It is necessary to learn lessons and accumulate flying experience during the flight. Peng's test flight is not one time today, but a month after today, and it will fly non-stop for a month. Only in this way can we find the slightest drawback in it and improve it. ”
"Understand Master Li."
“……”
"Woo woo"
A large steam car, towing a board cart, came to the big wind platform.
The locomotive is planted on the board car, but now it is covered with canvas, and many people point to it along the way. To be honest, the reason why people are curious about what is in the canvas is not because of the items in the canvas itself. It's that no one has ever seen such a large steam car.
Such a big car to pull something, it must be extraordinary.
This kind of large steam car was produced by Xingtu Company, and it was specially used for transportation. Such a car can carry up to fifteen tons at a time.
And this locomotive is obviously not light, although it is only a locomotive used to test the tracks, but it is also a locomotive.
When they arrived at Dafengtai, hundreds of workers hurriedly ran over.
The canvas was unraveled.
A big guy with a swarthy body appeared in front of everyone.
"Wow!"
"Such a big car?"
"Why is it an iron wheel? How do iron wheels run on the ground? People have to be shaken to death when they sit on it, right? ”
"It's so different from other cars, I can't even imagine it. However, it has a number of crankshafts attached to its wheels, which look similar to the power transmission rods of old steam engines. Only, why is it exposed? ”
"It's a steam car."
"Oh my God, how much coal does it have to eat a day?"
“……”
Li Zhen and others also walked over to take a look, and I have to say that the test product is the test product. This big guy is fierce, but the craftsmanship is very sloppy. It's just a matter of how it works.
There was no lid, the steam oven was completely exposed, just a platform with wheels underneath. In front of it is a windshield and protection device of steel plates, and some anti-collision devices are also added.
Li Zhen asked quietly, "How much does this cost?" ”
Jia Liping said softly: "The cost price of this naked car is one million gold coupons. ”
Li Zhen was speechless.