Chapter 41. Outcome of the proposal
Finally, the speaker is in the middle of the ........
Place (former President of the United States) sat in the seat of the Congress, listening quietly to everyone's speeches, as the administrator of the North American continent, he had long been numb to most things, but the appearance of Nilga gave Pulis a new idea, with a little selfish thought.
"Lieutenant General Thunder, hello! I am Pulis, but I didn't expect that I would be the last speaker, and the questions that need to be asked have basically been asked by the first councillors, and I have indeed solved the problems in today's meeting with the amendments to the proposal put forward by Councillor Chen Hang.
And the only problem I have with the bill is that Nilga has become a member of the bill you mentioned. Then her reliability test I hope that in addition to the test in the lunar reserve base, so that all the parliamentarians present can be connected to the Nierga's system and have contact with Nierga, I believe that every councillor's home or the office of the world government has its own housekeeping robot, so that Nierga can directly connect with each councilor's housekeeping robot, and the 500 parliamentarians present will become Nierga's investigators, and we can allow Nierga to become a member of humanity in the interim constitution today, The scope of the interim constitution can only be limited to the lunar base and 500 parliamentarians, and this information cannot be disclosed to all mankind for the time being, but the lunar base and 500 parliamentarians need to conduct a three-month inspection period for her, and if the inspection period is unanimously agreed by everyone, Nirga will be included in the formal constitution and laws and notified to all mankind.
That's my suggestion for a deeper proposal. “
"Thank you, Councillor Pulis, for your proposal, which completes my proposal, and I agree with your proposal and will include this proposal in the proposal as a relevant article."
"Then I don't have a problem, thank you, Lieutenant General Thunder."
At this time, Pulis thought of the robot "Ava" in the house, and his wife. In fact, I don't know how other people are doing over the years, although they are making decisions about the trend of the world, but they have been entangled in loneliness, basically only Ava is by her side every day, but Ava can only mechanically obey her own instructions, but she can't share loneliness with herself, if Ava can be like Nirga, she may not feel so lonely. At this moment, Priss began to pray that the Thunder's proposal would be approved by everyone.
Meeting AI001 "There are no new speakers asking for access to the meeting, and Lieutenant General Lei Ting will be given 10 minutes to revise the text of the proposal, and I will assist." ”
Thunder in the center of the field soon consulted with Thunder through computers with the help of the conference AI, and at the same time, Councillor Chen Hang, Councillor Pulis, and Barbeck of the Academy of Sciences negotiated with Thunder through computers, revised the original proposal, and began to resend it to the tablets of the members present.
In the center of all the councillors' tablets is a reminder that version 2.5 of the new Lunar Reserve Base Program has been sent
Moon Reserve Base Program version 2.5
“
Applicant: Thunder
Affiliation: Space Fleet
Rank: Lieutenant General of the Space Forces
Classified: Top Secret
Revisers: Hon Chen Hang, Hon Place Please, Hon Planck, Hon Barbeck
Project Title: Carrier-Based Pilot and Artificial Intelligence Project Lunar Reserve Program (Revision)
Project Description:
1. Temporarily set aside an area of about 100,000 people at the existing base on the moon to temporarily accommodate the outstanding pilots selected and eliminated by the spacecraft port. Isolated from the rest of the lunar base. At the same time, the reserve personnel were excavated from among the existing pilots on the moon who did not participate in the selection.
2. Deploy materials from the earth, prepare a six-month food reserve for about 1 million people, 2 million sets of engineering operation spacesuits, and 100,000 sets of various engineering equipment to be disassembled and transported to the moon. and the engineering design institute to calculate the materials of the mothership base and the mothership manufacturing plant at 100 meters below the moon, and then gradually transported them up by a space elevator during the construction of the project.
3. At the same time, 80,000 engineers will be selected from various regions of the earth and transported to the moon, and then the pilots of the temporary base will work together with the 80,000 engineers and the personnel of the engineering base on the moon itself to build temporary shelters and supporting facilities that can accommodate 1 million people. Completed within 15 days,
4. After the completion of all supporting facilities and temporary shelters, another 920,000 engineers will be transported from the earth to the moon, the assembly of engineering equipment will be completed, and the construction of a full-fledged reserve base below 100 meters of the lunar surface will begin. It can be completed within 90 days.
5. During the construction period, the Academy of Earth Sciences will temporarily send a team of 2,000 people to the temporary base on the moon to carry out the initial transformation of the mothership and fighter aircraft with the help of the existing facilities on the moon.
6. An elite team of 1,000 people will be sent by the spacecraft port to form a team of instructors for the future lunar reserve base, and will directly stay at the lunar reserve base in the later stage.
7. 10 motherships and 5,000 aircraft will be dispatched from the spacecraft port to temporarily dock in near-moon orbit. Five of these carriers and 2,500 were used for training missions at temporary bases, while the rest of the carriers and fighters were handed over to the Academy of Sciences for refit on board Nilga. After the modification was completed, Nilga conducted confrontation training with the pilots of the base.
8. After the completion of the refit of the Niergar mothership, it will be connected to the hand-held computers of all flight personnel and scientific research personnel of the temporary base to conduct human social contact experiments.
9. At the same time, Nierga connects 500 parliamentarians' proprietary housekeeping robots through communication, and the access codes of all robots are directly provided to the Academy of Sciences after the meeting. Nilga will write into its own sub-program via remote communication to begin the March inspection period for councillors.
10. After the completion of the underground lunar reserve base, the number of reserve pilots will be expanded to 30,000. The Academy of Sciences continued to base underground on the moon from Earth, expanding its staff to 20,000 people.
11. In addition, the production plant of the lunar base will be assisted by about 500 personnel from the spacecraft port factory, and most of them will be handed over to robots to complete assembly and production.
12. The total armed forces of the entire underground reserve base on the moon will reach 50 motherships and 25,000 fighters, of which 25 carriers and 12,500 fighters will all be controlled by Nirga.
13. Within the completion of the three-month inspection period of the Nirga, a new proposal will be made to the parliament to formally incorporate the Nirga into the constitution and laws of mankind and to inform all mankind.
14. The head of the Moon Reserve Base appointed Thunder as the main person in charge, subordinate to the Space Force, under the leadership of Commander-in-Chief Chen Hang and under the supervision of the overall council.
December 30, 2027"