Chapter 329: Into the Desert
The huge machine was lifted away from the wagon and smoothly placed in the designated position, and dozens of workers began to connect the pipes according to the drawings, which were all ready-made things, and there was no pressure, so the installation was fast.
After the first machine was installed in place, Lin Feng ordered the valve to be opened, and the sea water flowed in through the underground tunnel, he turned on the purifier, and with a low roar, the water outlet began to pour out clear water.
Someone took a kettle and took some, and after a simple test, it was found that it was almost close to the standard of pure water, and it was okay to drink it directly.
Hundreds of tiny pipes extend from the machine, constantly spewing out powders and crystals, which are minerals separated from the seawater.
"Okay, good!" The old man looked at this scene and couldn't help but feel relieved, "If there are more such projects, how many resources can we save every year, and how much less environmental pollution will we cause?"
With the endorsement of the old man's words, Lin Feng believes that at least in a few years, he will not have any problems with this project.
There were also many representatives of large enterprises who were ready to buy various minerals, and when the old man left, everyone couldn't wait to take samples.
"The purity is almost 100%!"
"M's, I won't have to worry about not being able to buy good raw materials in the future!"
"We signed this contract, don't rob me of anyone!"
Han Minghao was instantly surrounded by dozens of people and fell into a sea of order contracts.
The installation continues, presumably until late at night. Lin Feng was not in the mood to watch all the time, so he drove to the beach.
The pollution in Bohai Bay is relatively serious, because it is surrounded by land on three sides, and the flow of sea water is not very smooth. But don't worry now, as he pumps a lot of fresh water from here, more fresh water will flow in, which should help alleviate the pollution of the bay.
There are many places on the beach that are empty, because of the sea, many of them are saline, and some are covered with sand and gravel, so there is no food to grow.
After the seawater separation and purification plant is completed, he will ask Han Minghao to fight for these places to be contracted and then build a solar power station.
"What's over there?"
Lin Feng asked, pointing to a bridge built on the beach on the beach in the distance.
"It was preparing to build a bridge across the sea. ”
"Where?"
"Dalian. ”
Lin Feng nodded, this was heard of before, but it has not been started.
"But now there is no need, the undersea tunnel has been opened, and it was opened to traffic a few years ago. Not only to Dalian, but also to Weihai, Qinhuangdao, Yantai, Yingkou. Now the sea water is already extending in all directions, and I heard that there is an undersea overpass, do you want to take you to feel it?"
"You don't need to feel it, you just need to build it. ”
It's not just a question of how much money Lin Feng can make through these tunnels.
How difficult the bridge is, it takes too many resources and time, and it is not safe enough. It is also a merit to be able to use the undersea tunnel for the benefit of the people here.
By the next day, all the seawater separators had been installed in place, and the next thing that needed to be done was to complete the outside plant and arrange the management team.
These are all Han Minghao's affairs, and he has already transferred some management personnel from Rongcheng to take charge of them.
The matter here was almost over, and Lin Feng hurried back to Rongcheng again.
Flying is a thing that makes him feel uncomfortable, not because the civil plane is uncomfortable, but because the delay is too serious.
It was already more than three o'clock in the afternoon when he arrived in Rongcheng, and a group of people from Linjia Village were already waiting at the door of his villa.
After arranging everyone's accommodation, Lin Feng hurriedly felt that the military region was stationed. The entrance to the tunnel to the Taklamakan Desert is located in the station, where the two special trains that have been built are quietly parked.
Both trains have only eight carriages, two of which are passenger and the rest are cargo boxes. In a short period of time, there are simply too many supplies to be transported to the desert.
The living consumption of more than 1,000 people alone is a huge amount of material.
The commander-in-chief in charge of the construction project is still a horse worker, he has been very busy recently, and after handing over Lin Feng's project here, there are still dozens of underground high-speed trains waiting for him to command across the country.
Loading onto the train is a shield machine, special processing equipment for supramolecular polymeric materials, large diesel generators, diesel, then tents, quilts, food, clean water, etc., this season in Taklamakan The temperature is still a few degrees below zero, and the wind and sand are constant.
It's a hard job to work on this.
But we can't wait any longer, once spring does come, the wind and sand will be even stronger, and everything can be drowned overnight, while summer is full of heat.
So it's better to be cold than to suffer from the heat.
The opposite station has also been built, located on the edge of the desert, surrounded by the Gobi and grasslands, and the climate is relatively stable.
Seeing that everything was going on in an orderly manner, Lin Feng was relieved.
The next day, he took 30 people from Linjia Village and set off on a high-speed train. In less than an hour, everyone was already more than a thousand kilometers away.
The howling cold wind is like a ghost crying, and although the sky is clear, the sun does not seem to have any warmth, so people can't feel a trace of warmth.
The people of Linjia Village, who were accustomed to the Bashu climate, were all shivering from the cold, and in less than an hour, their faces were already dry and cracked by the cold wind.
The forest wind made people set up tents, and this is only the edge of the desert, with wind and no sand. When you enter the center of the desert tomorrow, the taste is sour.
"Lin Feng, how do we get there?" asked the cousin who was traveling with him, "and we can't drive in the desert, and besides, we don't have a car." There are so many supplies that we don't even have a crane. ”
"Don't worry, you settle down first, and I'll figure out the rest. ”
He had already ordered a super construction machine in the Universe Mall, and it was time to see that it was almost up.
At around 10 o'clock, a huge steel figure in the depths of the desert approached.
It was a huge machine with eight long legs, more than 100 meters in height, and it looked like a behemoth monster from a distance, which Lin Feng called a big spider.
At the center of it is a multi-functional platform that provides the role of lifting, storing and transporting supplies.
This is probably the least technological thing among all the products that Lin Feng bought. So it's not too expensive, and together with a super battery that can last for two years, the price of one is only 1 billion.
But don't underestimate this kind of thing, in the early works, he can play a huge role.
"This machine is so big!"
When the big spider came to the front, everyone was stunned.
300 meters, as high as a 100-story building, eight long legs spread, at least a thousand meters of span, each step is five or six hundred meters!
Lin Feng took the elevator to the control room, put down the hook and put all the things in the train in the warehouse of the big spider, which was only a matter of one or two hours.
"That's all for today, everyone rest early, and we'll set off in the middle of the night. ”