Chapter 300: It's too big
The construction progress of Gaoshanping is quite fast.
A few days later, the skeleton of the 100-acre greenhouse was all built. The rest of the greenhouse skeleton was booked not long ago, and the manufacturer had just delivered the goods and was still on the way.
The cement road in the greenhouse area has been done, and the drainage canal has also been done.
All workers were put into the construction of the warehouse.
The floor of the warehouse, and the side of the wall, have been prepared before. Now start fixing the steel frame and the insulated color steel tile......
There's not enough time to do it now.
It's already August.
The 3,000 tons of organic fertilizer I bought were delivered in the middle of the month.
……
"Brother." Early in the morning, Chen Chen's family came over.
"Hey. Third uncle, third aunt. Ye Mo shouted.
"We only have a warehouse over there that hasn't been completed, so come and see if there's anything we need help with." Chen Chen's father said.
"Can I help carry the materials." Ye Mo looked at Chen Chen: "When the warehouse on our side is ready, we will go over to be your warehouse." ”
"Okay."
The two warehouses started at the same time, which required a lot of manpower.
Ye Mo took Chen Chen to Master Liu's group and asked Master Liu to arrange the work.
Ye Zhi and Tang Sui have not finished their greenhouse yet, and they are now working overtime every day.
Chen Chen can also weld, he just learned, welding is not good, so he is responsible for welding simple and important areas.
Cattle are expensive, cattle are virtuous, they are masters.
Welding on the roof of the greenhouse......
Ye Mo's parents also came over to help.
There are more than a dozen people at each construction site.
The structure of the warehouse is much more complex than that of the greenhouse.
The 2,000-square-meter warehouse took four days......
Another 100 acres of greenhouses were also sent, and the workers continued the construction of the greenhouses. With surplus manpower, the greenhouse began to be covered with film.
Three-piece greenhouse, covering the greenhouse film is relatively troublesome. There are two U-shaped slots in the third piece, and when covering the film, it is a lot of trouble.
The width of the greenhouse is 25 meters, and the length is 80 meters. Thickened greenhouse film is used......
It is not a simple task to cover the greenhouse film on the greenhouse.
"Hey, Boss Ye."
"Ah, Mayor Zhao." Ye Mo replied.
"I took the plumber to Gaoshanping, but I didn't see anyone." Mayor Zhao said.
"We're inside, follow the main road straight ahead." Ye Mo said.
"Okay, let's go."
Ye Mo hung up the phone and drove the car to pick up Mayor Zhao and them halfway: "Mayor Zhao, why did you come here in person." ”
"I heard you're building a greenhouse, so come and have a look." Mayor Zhao said with a smile.
"Director Hong......" Ye Mo took out a cigarette, handed a cigarette to Mayor Zhao and Director Hong of the Rural Revitalization Office, and then handed a cigarette to the plumber in the back.
Subsequently, Ye Mo took the group to the greenhouse area.
Looking at the greenhouses, Mayor Zhao called out to the good guys, went over and touched the greenhouse materials, and finally couldn't help it: "Good guys, this greenhouse is too big." There is also a cement road in the greenhouse......"
"It's to facilitate management and save labor costs." Ye Mo said.
Mayor Zhao gave Ye Mo a thumbs up and said, "How big is this big greenhouse?" ”
"It covers an area of 2,000 square meters, 3 acres." Ye Mo said.
"How much does a greenhouse cost, one?"
"The cost of a greenhouse is about 120,000 yuan."
Mayor Zhao touched his chin, nodded, and introduced the plumber to Ye Mo: "This is Master Wang, who is in charge of the village's water and electricity." That's all you need to tell Master Wang......"
"Hello Master Wang."
"Mr. Ye is good."
"Go ahead. Director Hong and I walked around and had a visit. Mayor Zhao said with a smile.
"Then you can do it, we're busy."
"Hmmm......"
There are five plumbers.
Ye Mo took Master Wang and them around, the villa needs electricity, and the greenhouse area is a big user.
"Mayor Zhao personally helped you apply for a grid package. The main wires and piles do not need to pay extra, and the wires that are pulled out from the main wire need to be paid by yourself. We're only doing the main wires on our side...... No problem, right? Master Wang said.
"No problem. Thank you so much. ”
"We'll send the piles tomorrow."
"Okay......" Ye Mo handed Master Wang another cigarette, then took out a Huazi fork and stuffed two packs for Master Wang: "The rest of the time will be hard for you." ”
Master Wang waved his hand again and again, refusing.
"On such a hot day, I have to trouble you later......" Ye Mo then stuffed two packs of cigarettes each.
"This ......"
Ye Mo took out the phone, lit it for them, and said, "In the future, I will have to trouble you with the wire." ”
"Thank you." Master Wang smiled and whispered.
Ye Mo smiled: "I will trouble you more in the future." ”
"We have better and cheaper industrial wires over there. The electricity in your greenhouse should be relatively strong, and we will give you some better wires when the time comes. ”
"Okay, thank you."
Mayor Zhao and Director Hong walked along the road in the greenhouse area and came to the newly built warehouse.
"It's a big project here. 1 greenhouse costs 120,000 yuan, how many greenhouses are there? ”
"Dozens of them."
Mayor Zhao sighed from time to time and said, "Can we promote this kind of greenhouse in our town?" ”
"It's hard." Director Hong shook his head: "The cost is too high. There are also greenhouses built on the gravel slope, which are shorter and narrower than the greenhouses here, and the greenhouses over there are much cheaper. ”
"Let's take a look at their results. If the effect is satisfactory, you can consider promoting the greenhouse in the future. The climate advantage here is also obvious, and there are greenhouses in winter, so you can grow watermelons and melons. Mayor Zhao said.
"There is little rain in winter and the ditches are dry...... If you don't have water, you're afraid it won't work. The previously planned Hongshan Reservoir irrigation project is still on hold and has not been completed...... "Director Hong said.
Mayor Zhao let out a long sigh.
The Hongshan Reservoir Irrigation Project and the Niujiaoling Reservoir Irrigation Project were launched at the same time.
Because of the remoteness of the Niujiaoling Reservoir, poverty alleviation has given priority to the irrigation canal of the Niujiaoling Reservoir.
Only one pumping station and ditches have been built in the Hongshan Reservoir irrigation area. Water is diverted by ditches, and only valley areas can be irrigated.
"If the greenhouse planting here can make achievements, it should be able to get the support of the county." Mayor Zhao didn't have much confidence.
"Look at the ...... over there" Director Hong saw the super big watermelon over there: "It's a watermelon, right?" ”
"It should be." It was a little far away, and Mayor Zhao was not sure, and said, "Go over and take a look." ”
The two walked briskly.
"Hey, it's really watermelon...... Mayor Zhao looked at these watermelons and said in shock: "It's too big." ”
"These watermelons are estimated to weigh more than 150 kilograms."
"Probably more than that."
Before, Xiaomian Daxiao sold watermelons over there, and the news of super big watermelons spread. Mayor Zhao: They have also heard that there are super large watermelons grown here......
Seeing these big watermelons with your own eyes is not only shocking, but also shocking.