Chapter 485: It's June

Hongshan Organic Fertilizer Factory was completed, which is undoubtedly the largest and most advanced organic fertilizer factory in the whole Huacheng.

Half hardcore, half sweet, this is both a city of steel and a city of fruits.

But as far as farming is concerned, the scale is not large.

With the scale of breeding registered in Huacheng now, when the Hongshan organic fertilizer factory is completed, if the manure is separated from wet and dry and handed over to the Hongshan organic fertilizer factory, it can be easily disposed of.

Zheng Jinyuan contacted several of the largest aquaculture enterprises in Huacheng and submitted applications to the county and municipal governments, hoping to build a planning area in the mountainous area at the junction of Hongshan and Hongge for the development of aquaculture, and hoped to obtain policy and financial payments.

Policy support is well understood, and financial support is road planning.

Regardless of whether they raise pigs or cattle, they all move to the mountains, and build roads in the mountains, and the government can really support them.

Li Xuebin also visited the surrounding cities and counties and contacted organic fertilizer raw materials in advance.

Organic fertilizer raw materials, farms are the main. Then there are the wineries......

Li Xuebin visited the farms and wineries in the surrounding counties and cities, and brought Yunxiu and Wang Rong with him. If they can negotiate a cooperation, they will be responsible for purchasing raw materials or transporting them in the future.

Harvest fertilizer nearby.

Far away, half-cooked manure is harvested.

With the scale of Hongshan Organic Fertilizer Factory, the No. 1 organic fertilizer production line can produce 40,000 tons of organic fertilizer at full load in one month.

Farms and wineries alone are not enough.

The main raw material of the organic fertilizer workshop built later is bamboo chips. Bamboo chips need to be made into organic fertilizer, which takes longer.

……

It's eight o'clock.

The company's management came to the conference room on time.

Li Xuebin explained some of the problems that came in and the problems that he has faced in recent times......

Then let's talk about the organic fertilizer factory.

The progress of construction should be accelerated, stabilized, and the quality of project construction should be guaranteed.

At today's meeting, Gao Jin also came. After all, the main thing is about the construction of organic fertilizer factories......

The project of 200 million yuan is still the largest single project that Gao Jin has come into contact with in recent years. If it is built, it will also help their company to open up the market for factory construction.

Wang Hao also talked about the topography of the pond ditch...... The organic fertilizer factory needs to level a large area of land and dig up millions of square meters of soil. If the soil is used to fill the ravine, it is not cost-effective. And the terrain outside the pond ditch, if this soil is used to plug the gap, and some money is invested, a medium-sized reservoir can be built.

There is no reservoir on this side of the five ditches, only reservoirs of much larger and smallest.

The reservoir is ok in a normal year, but in a dry year, it's over.

After the morning meeting, everyone went to their own business.

Ye Mo stopped Wang Hao and Zhou An, and then pulled Li Xuebin and Zheng Jinyuan to Tanshuigou.

Outside the pond ditch, there is a very large gentle slope, as long as the gentle slope is blocked, it is a reservoir.

After seeing the terrain here, Ye Mo's eyes lit up. Li Xuebin and Zheng Jinyuan also looked at each other and nodded......

"Yes." Zheng Jinyuan said: "But I'm afraid that the earthwork is not enough. ”

"In the future, if the construction of a breeding area is approved, a large amount ......of earthwork will have to be dug up to build roads and farms," Li Xuebin said.

"I'll go to the Geological Bureau to evaluate it and see if I can build it." Zheng Jinyuan said.

"Hmm."

If this reservoir is built alone, it will cost a lot of money.

However, the factory is about to be built, and the earthwork that will be cleared in the future can be pulled here and poured here. It is one more process, while accumulating, while tamping.

The intention was determined, and the soil sent by the earthmoving truck behind it was poured under the pond ditch.

Even if you don't get the approval for the construction of the reservoir, you can build a big pool here.

The approval for the construction of the reservoir was only approved after more than ten days. However, hundreds of truckloads of earthwork are transported every day, and then there is a large excavator and a bulldozer, and the rollers are working at the same time, and a small dam has been built under the pond ditch. After that, the land is sent over, and it is constantly piled up and tamped...... Reinforcement again, and that's it.

May.

The temperature is getting hotter day by day.

In late May, daytime highs easily reach 30 degrees Celsius......

But compared to last year, it's much better.

In May, it rained a few times in succession, and although it was not particularly heavy, the water on the side of the pond ditch had already begun to accumulate.

It's June.

Zheng Jinyuan also spun off his company, keeping a wholesale fruit market and selling the rest. And his investment in Hongshan shares has also been fully received.

Then there is a couple of good news.

The Huacheng government and Yancheng County approved the Hongshan Town Aquaculture Park, allocating 90 million yuan for the construction of road facilities and the leveling of the park's land. And seven farming companies have already signed investment agreements.

The largest investment, 470 million.

Hongshan Co., Ltd. also signed a manure treatment agreement with the company and assisted the company in building a supporting manure treatment system. After the treated manure, after the dry and wet separation, Hongshan shares purchased at a price of 85 yuan per ton (less than 60% water content, raw manure).

The remaining companies have relatively small investments, none of which exceed 100 million. There are 4 cattle farms and 4 pig farms...... They have also signed a manure treatment agreement with Hongshan shares.

The contract has been signed, but it is not known when it will be implemented. Large-scale farms, the fastest estimate to get next year. For small farms, it depends on when the government can build roads and sites.

……

The warehouse and office building in Gaoshanping have been completed.

Three-storey office, one conference room on the top floor, three offices...... The layout is similar to that of the office building in Wutiaogou.

More than a dozen flower beds have been built around the office building, and a mango orchard has been kept separating it from the warehouse area.

Three warehouses, each with a large cement floor on the outside, is very spacious.

As soon as the warehouse was built, the No. 1 warehouse was almost full of things, mainly dump trucks, three-wheelers, and tractors for the orchard...... and the tripod inside the greenhouse.

30 greenhouses, 90 acres...... The tripods have all been dismantled and sent to the warehouse for neat stacking.

The warehouse of the greenhouse is now full of manure and there is no free area.

The warehouse at Takayama Ping Pass is full of bundled bags of fertilizer.

There is also a warehouse with an area of almost 2 acres, in which a shredder is installed. Now it is the site for making organic fertilizer in Takayama-ping......

Gaoshanping regularly recycles fallen coconut leaves, as well as melon vines from greenhouses. Especially in the greenhouse, the greenhouse uses the most spiritual springs, and those melon vines should be the best organic fertilizer raw materials. These are speculations and have not yet been confirmed.