Chapter 100: Construction

The matter was resolved smoothly, after all, Li Zhao's position was here, and he paid the expenses in full. And after listening to Li Zhao's thoughts, the logistics director added another item to Li Zhao, that is, floor tiles, Li Zhao's house is now paved with green bricks, and it has been a long time, a little potholes, and the logistics director also suggested that it be replaced.

Otherwise, after the house is renovated, only the floor tiles have not been replaced, and it will look nondescript. Now there is just a batch of marble left over from the renovation of the office building in the warehouse of the logistics department, and the amount is not much, it is only fifty or sixty square meters, and all of it can be replaced for Li Zhao's family. Many people have made up their minds about this batch of marbles, that is, the quantity is a problem, if there are more, there will be no matter for Li Zhao.

Li Zhao picked up a bargain, and after learning that Li Zhao's interior wall was not willing to paint and plaster, but was ready to give wall stickers, this job was also packaged. Not only that, but I also took out some of the remaining tiles in the warehouse and made a baseboard to prevent the kraft paper from getting dirty when it approached the ground.

In the end, plus the labor cost, it only cost a total of about 150 yuan, which is a very low price. However, there is one point, the workers' lunch needs Li Zhao to find a way to solve it, this is not a big problem, Li Zhao has recently received a large number of material tickets, it is really not bad for this bit of food, but it is a problem to find someone to help make it.

After the negotiation, it was agreed that the construction would start on the weekend, and Li Zhao paid the money directly, and also asked for a room in the guest house, ready to move to the guest house for a period of time. Fortunately, the cost is not expensive, and the meal is the same as the usual canteen, and of course the guest house canteen is also a canteen. Because Li Zhao's level is relatively high, the accommodation fee is also symbolically charged, Li Zhao needs to live for about half a month, including the meal ticket, a total of five yuan.

The reason why it was agreed that the construction would be carried out on weekends was mainly because he had been busy recently and did not have much time, and only when the construction of the plant began, Li Zhao could have time to take care of it, so Li Zhao's appointment time was to start construction on weekends. In the past few days, Li Zhao needs to slowly find a place to put some things at home, such as grain, quilts, etc.

It's okay to say that the food is going to be used to cook for the workers, and the little food you save is not enough, so you can directly find someone who can cook when you come back, and hand it over to others to manage, and there is not much money. The furniture can be placed directly in the yard, depending on the recent weather, it should not rain much, and the quilt and the like can be placed directly in the guest house.

Books can be put in the office, valuables Li Zhao has been locked in the office safe, he just put dozens of urgent money and tickets on his body, these things are enough for Li Zhao to be busy for a few days, of course, the first thing is to solve the person who helps to cook, otherwise the work will start, the person who cooks has not been arranged, and it will delay things.

After dinner in the evening, Li Zhao went to find an uncle and told him about the situation, and there would be about five or six workers who would come by then. This matter really needs to be greeted by an uncle, he is the housekeeper in the courtyard, if you don't make it clear to him, that's not okay, not only that, but also apologize to the neighbors, after all, repairing the house will affect other people's homes.

In the end, at the suggestion of an uncle, Li Zhao invited Qin Huairu and the three mothers to help cook, which can be regarded as taking care of the two difficult households. They help cook, wash or something, take care of their meal every day, and after that, each person can be given ten catties of stick noodles. The reason why two people are invited is also impossible, they still have to take care of the old and young at home, and they can't be busy alone, because it is during the holiday, otherwise it will be more troublesome.

Under the leadership of an uncle, he visited the neighbors, gave some snacks to the children of each family, and gave a pack of cigarettes to the house, which cost Li Zhao a total of three yuan. It's not the same to have these three dollars and not have them, it's hard to say anything if you don't give anything to others, but whether you will have something less, it's hard to say.

After doing this, Li Zhao also slowly took the things away. In the next few days, it was really busy, the electroslag furnace was simple, the design had been completed and the manufacturing began, but the hydraulic press and plant design were very troublesome. At the beginning, there was a disagreement on the scale of the plant, according to Li Zhao's original meaning, it was enough to build a plant that could run ten units.

After all, other steel mills can be built in the future, and various machine factories can also be built if needed. The construction of ten rolling mills can also produce hundreds of thousands of tons per year, which should be completely sufficient. Even if it is sold to Da Mao, it is definitely enough, Li Zhao never thought that Da Mao would order more than 100,000 tons per year.

But what Li Zhao didn't know was that the formula he handed in yesterday stimulated the superior leaders, and finally under the unanimous decision of the leaders at all levels, he was ready to leave enough space for 50 units of the electroslag furnace plant. This time, not only did all the locations be reserved, but also considered the need to build a larger-scale electroslag furnace in the future, and the reserved pit was also expanded, including several under construction by Li Zhao, which Li Zhao did not expect.

This is not yet built, and he is ready to change to larger equipment, which is really a slap in the face, making Li Zhao feel a little lose face, how disgusted this is ten-ton equipment. Of course, Li Zhao is against it, after all, small tonnage has the role of small tonnage. Now there is not so much steel production in China to consume, and now the Red Star Rolling Mill only produces more than one million tons of steel every year.

What's more, if it reaches the scale of fifty units, even if it is ten tons, the production capacity will be terrifying, and there is no problem with several million tons per year, where is so much alloy steel used in the short term. Of course, this may also be due to the fact that after the calculation of the superiors, they feel that the profit is very large, and they are ready to gather wool, but this matter can only be taken step by step, and Li Zhao is also a little powerless.

Of course, what Li Zhao didn't know was that this was also related to the fact that he handed in too many types of formulas, and after research, his superiors felt that they needed to install more production equipment for the rolling mill so that they could produce more kinds of materials at the same time. It was also decided that in the short term, all the materials in the recipe would be produced by the rolling mill for better management.

After all, the more people who know the secret, the easier it is to leak it, and at present, only the rolling mill is allowed to produce, as long as the review and management are done well, the secret can be easily controlled in a relatively small range. In particular, the project has a railway in the plant, which is directly connected to the railway for transporting coal and iron ore.

Due to the large construction of the plant, when the goods are transferred, the train can be directly stopped in the plant and hoisted by cranes. Not only that, maybe it was providence, Li Zhao originally wanted to choose a location as close to the power plant as possible, but what he didn't expect was that this location was still the most remote location of the rolling mill. It is the closest to the power plant, but it is also the farthest from the road and far from the rest of the plant. As long as you are on guard outside the factory, there will be no much communication with the outside world, and it will naturally have the characteristics of confidentiality.

After deciding on the plan, I came up with the design drawings on Friday, which is really desperate. Considering it very comprehensively, Li Zhao was very satisfied with this plan, and the chief engineers were also very satisfied, and it was also recognized by the superior leaders. In this way, the plan was decided, and construction could begin the next day.

At this time in the project, Li Zhao can relax a little, and the main thing behind is to go to the construction site from time to time to keep an eye on the progress, and then review the drawings handed in every day with several chief engineers, and then adjust the task amount in time according to the progress of the task.

In order to better complete the task, Li Zhaoke basically designed all the equipment needed, especially the booster pump, which is the basis for whether it can come up with enough pressure, and it is not sloppy. Of course, now the personnel are very sufficient, the progress is still good, almost five or six hundred drawings can be completed every day, according to this progress, it will definitely be completed in more than a month.

The next day, the construction personnel began to enter the site, first leveling the ground, this era due to the lack of machinery, so it is basically a crowd tactic. When Li Zhao came to the construction site, he saw that it was already full of people, and it was estimated that there were at least a thousand people. There are relatively few machinery, except for some mixers and rollers, the rest are basically manual, including digging foundations.

Li Zhao remembers the iron man Wang Jinxi, who is a figure of this era, Li Zhao can't remember exactly what happened, but he only remembers that because the cement could not be stirred, he jumped directly into the waist-high cement, manually stirred, and finally successfully completed the construction of oil wells, Wang Jinxi is a true portrayal of many characters in this era.

Now Li Zhao is mainly following up on the construction here, and he doesn't know much about the construction, so he just looks at the excitement, so he doesn't ask about anything other than looking at the progress every day, but the progress is really slow.

Because the plant needs to be hoisted with large quality steel when it is used, it is necessary to install a large crane, and the requirements of the foundation are also very high. Then you need to tie steel bars and pour concrete, and the foundation is not half a month to a month, don't want to complete it.

"Brother Shen!"

"Hmm!"

Shen Changqing walked on the road, and when he met someone he knew well, he would say hello to each other or nod his head.

But it doesn't matter who it is.

There was no superfluous expression on everyone's face, as if they were very indifferent to everything.

on this.

Shen Changqing is used to it.

Because this is the Demon Suppression Division, it is an institution that maintains the stability of Great Qin, and its main responsibility is to kill demons and monsters, and of course there are some other side jobs.

Arguably.

In the Demon Suppression Division, everyone has a lot of blood on their hands.

When a person is accustomed to seeing life and death, then he will become indifferent to many things.

When he first came to this world, Shen Changqing was a little uncomfortable, but over time he got used to it.

The Demon Suppression Division is huge.

The people who can stay in the Demon Suppression Division are all powerful masters, or people who have the potential to become masters.

Shen Changqing belongs to the latter.

Among them, the Demon Suppression Division is divided into two professions, one is the town guard and the other is the demon exterminator.

Anyone who enters the Demon Suppression Division starts with the lowest level of demon slayer.

Then step by step, he is expected to become a town guard.

Shen Changqing's predecessor was a trainee demon slayer in the Demon Suppression Division, and he was also the lowest level of the demon slayer envoys.

Have memories of the predecessor.

He is also very familiar with the environment of the Demon Suppression Division.

It didn't take long for Shen Changqing to stop in front of an attic.

Unlike other places full of slaughter, the attic here seems to stand out from the crowd, and in the bloody Demon Suppression Division, it presents a different tranquility.

At this time, the attic door is open, and there are occasional people entering and exiting.

Shen Changqing only hesitated for a moment, and then stepped in.

Access to the attic.

The environment has changed in vain.

A burst of ink fragrance mixed with the faint smell of blood came to his face, making his brow furrow instinctively, but quickly stretched.

The smell of blood on everyone's body in the Demon Suppression Division is almost impossible to clean.