Chapter 234: Phase 3 Project
First of all, the corresponding preferential policies related to the construction of factories in Jiangsu, Zhejiang and Shanghai will reduce all industrial electricity bills, which means that Zhou Zhen can save a lot of expenses if he builds factories in Jiangsu, Zhejiang and Shanghai in the future
After all, the current factory electricity consumption is much more than that of ordinary residents, especially the industry that Zhou Zhen is engaged in is a heavy area of electricity consumption.
If the corresponding electricity bill is reduced, it means that tens of millions or even nearly 100 million yuan of electricity expenses can be saved in electricity bills in a year.
You must know that the amount of electricity consumed in the production of chips is not a small amount, and even the amount of electricity consumed can account for nearly two to three percent of the cost of foundry production.
At the same time, the corresponding screen and smartphone unmanned factory, which require a large amount of electrical energy to support the operation of the factory.
This is good news for the current Zhou Zhen.
After all, it is now the construction of a tidal energy corresponding power station, and Zhou Zhen does not need to pay a penny, and even the corresponding construction team is arranged above, which means that Zhou Zhen only needs to produce the corresponding technology.
At the same time, projects such as power stations, in terms of the current electricity cost of the whole country, are basically in a state of relative break-even, and even the expenditure is greater than the income.
From the investment in the construction of the power station, to the pulling of cables and wires, as well as the maintenance of the corresponding generators and cables and wires, and the corresponding annual safety inspections, these are all required investments.
Although it can produce 30 billion kilowatt-hours of electricity every year, it is converted into 30 billion kilowatt-hours of electricity, according to the current average domestic residential electricity unit price of 6.7 gross kilowatt-hours of electricity.
The income that can be obtained in a year is only close to 20 billion.
However, the corresponding income will definitely not reach 20 billion, after all, when the corresponding output of electricity is sold to specialized industrial factories, the overall pricing will basically give the factory a certain discount.
In addition, many public facilities in the city also need to spend a lot of electricity, plus the corresponding maintenance costs, as well as the corresponding salary expenses of power grid workers and grassroots personnel, its overall income is close to seven or eight billion yuan a year at most.
Of course, when you take into account the other expenses, it is very good to be able to maintain the income and expenditure costs of a power station, and to have a certain amount of small income every year.
According to Zhou Zhen's current estimates, the corresponding construction of this power station will cost nearly 20 billion yuan and then add the corresponding equipment procurement and cables, and at least 30 billion yuan will be required to build the corresponding tidal energy power station.
In addition, the tidal power plant was built on the sea surface, and the construction difficulty was much higher than expected, and the life of the tidal power generation equipment was relatively short.
After all, these power generation equipment and the sea surface come into contact with a lot of salt and other minerals on the sea surface, which will cause unnecessary erosion damage when they come into contact with the corresponding generators and other auxiliary equipment.
According to Zhou Zhen's estimates, the generators and corresponding equipment should be checked every year, and the corresponding equipment should be replaced once every five years, and the replacement cost basically accounts for half of the cost of the entire power station construction.
This also means that if the current Zhou Zhen wants to make money from the power station, there is no other way than to raise the price of electricity.
But Zhou Zhen understood that there was no difference between doing this and dying by himself.
After a series of considerations, as well as the current development strategy required by the company, it is a very good choice to hand over the operation and management of this power station to the current Huaguo Power Grid.
On the other hand, relying on the corresponding preferential policies, the annual Zhouzhen supply chain system can also save most of the funds to be invested in R&D and production, bringing more profits to the company.
And with the help of this matter and the above to establish a good relationship, the company can also get the corresponding policy support in the future development, so as to develop more smoothly in China.
In Zhou Zhen's view, the current system is rooted in China, and although it is said that it will face the whole world in the future, the roots are still in China.
And most of the revenue of the entire company now comes from China, which makes the current Zhou Zhen need to work hard to run the company well.
After the corresponding Huaguo Power Grid and the construction team come to Rouyu New Energy Company, they can start to build the corresponding tidal energy hydropower station in an all-round way.
Soon, the staff of Huaguo Power Grid contacted Zhou Zhen's Rouyu New Energy Company and provided Zhou Zhen with the development process of the tidal energy supply station.
This time, the construction period of the tidal energy hydropower station is divided into three stages.
The first phase of construction is to build a 3 by 2 double-deck tidal energy hydropower station by August this year.
In addition, if there is no significant difference between the level of the input test and the level of the predicted power generation, the second phase of the project can be continued.
The second phase of the project is to expand the hydropower station into a 7 x 2 micro U-shaped tidal energy hydropower station on the basis of the original foundation.
This is expected to be officially completed in March next year, and basically has the prototype of the corresponding tidal energy hydropower station general project.
After the corresponding results are obtained, the corresponding power generation will be tested, and if the power generation reaches the standard, the whole tidal energy hydropower station of 15 times 2 will be completed in the third phase of the project.
The construction time frame is one and a half years, and within this year and a half a new power station will be built in the East China Sea.
If this project is completed, then the entire eastern coastal region will be able to truly achieve power freedom.
There is no need to spend a lot of energy to realize the transmission of power from the west to the east.
If the level of tidal energy generation and the corresponding cost consumption can meet the current domestic energy situation, perhaps the future tidal power station can become an important part of the domestic power generation system.
As a partner this time, Zhou Zhen naturally welcomed the arrival of the other party and expressed his full support for the construction of the project.
And provide very adequate technical support to the other party.
According to Zhou Zhen, the sooner the entire tidal power station is built, the more beneficial it will be to the current development of the company.
After having a conflicting power supply, Yuzhen Semiconductor's chip foundry can really start producing high-power chips.
After the corresponding negotiations, the project will finally start in early April, and Zhou Zhen has also sent technicians to fully support the construction of the tidal energy hydropower station.
Time has also slowly arrived in April, in the first half of this year, the domestic mobile phone market has released its own flagship, but this year's flagship released by domestic mobile phone manufacturers has not caused too much repercussions in the market.
Rising and falling! Swing rotten!
These labels have been firmly attached to the bodies of various mobile phone manufacturers, after all, the flagship mobile phones released by the current mobile phone manufacturers have not improved much compared with the flagships of the previous two years in terms of overall hardware configuration parameters.
In addition, the fire dragon is constantly rotten, and the corresponding foundry is mixed, resulting in consumers needing to draw when buying mobile phones, which makes the current domestic mobile phone market very sluggish.
In particular, this year's flagship mobile phones have seen a corresponding plunge in sales compared to last year.
On the contrary, last year's Fire Dragon 888+ model has gradually been valued by users after half a year of development.
In particular, in order to be able to clear inventory, various manufacturers also carried out a wave of price reductions for the Fire Dragon 888+ released in the second half of last year.
It has made countless users lock their eyes on these flagship mobile phones released in the second half of last year.
Rice mobile phone 11Slra, jumped from 6499 yuan directly to 4699 yuan in early April.
This directly made most users call this product really fragrant.
This price is basically exactly the same as the price of the Rice Phone 12Pro.
Both use the same screen, but the Mi 12Pro uses the Fire Dragon 8Ge1, which is a mixture of TSMC and Sansang, and the Mi 11SUlra uses the more stable Fire Dragon 888+ of the TSMC version.
At the same time, in terms of corresponding image photography, the image photography of the flagship of the previous generation of rice mobile phone directly surpasses the current rice mobile phone 12Pro, and with a more high-end ceramic back cover, the rice 11Slra is more fragrant.
In addition to the price reduction of rice's mobile phones, the two flagships of the blue factory have also made corresponding price cuts, but the price reduction is only 1,000 yuan.
Although the price is only reduced by 1,000, the overall performance and cost performance of its products are obviously better than this year's products.
At a time when manufacturers and users are miserable, the appearance of MediaTek's processor chip is indeed a little relieved for users.
MediaTek's processor This year's Dimensity 9000 performance is really good, and even at the end of March and early April, various mobile phone manufacturers began to launch some products equipped with Dimensity 9000 processor chips, which have been supported and recognized by most users.
It's just that Dimensity seems to be due to the production of processor chips, and the production capacity is too low, resulting in many current models equipped with MediaTek processor chips, which are out of stock one after another.
Of course, after discussions in the industry, everyone finally discovered that most of MediaTek's processor chips are basically supplied to Glory.
Among them, nearly half of MediaTek's Dimensity 9000 and Dimensity 8000 chips are supplied to Honor, and the Dimensity 9000+ processor chip is even exclusive to Honor.
Among the chips under itself, Redmi's K50 series has snatched up a large part, which also makes some manufacturers not have many MediaTek Dimensity processors.
However, MediaTek said it would increase production capacity and strive to supply manufacturers with more processor chips this year.
After all, MediaTek understands that it is now to defeat the fire dragon, so MediaTek's Dimensity chip is the industry hegemon.
As for Tianxuan, I'm afraid that he will be powerless for the entire market for the time being.
To provide you with the fastest update of the technology manufacturer of Dashen mutton stewed radish, in order for you to see the fastest update of this book next time, please be sure to save the bookmark!
Chapter 234 The Third Phase of the Project Free Reading.