Chapter 261: Becoming a Learning Object Again

"It's raining!"

"Fortunately, our boss had the foresight to build so many, such a good big warehouse and sewer in less than a week after the start of construction, otherwise it would be troublesome."

"However, these big warehouses built by our boss are also a little too tall!"

"Isn't it comfortable to be tall? I feel very comfortable sitting at the door of this storeroom now watching the heavy rain. ”

"With so many large warehouses, I don't know how many supplies can be put down?" ……

Today is September 8th, and it is the day when all schools in Tea City officially register for school this year.

Because of the heavy rain yesterday afternoon, Wang Qiang announced that except for the security team, everyone else would have a holiday and wait for the rain to stop before starting work.

But it hasn't rained for a long time in the tea city, and this rain has lasted all night, and it hasn't stopped.

Fortunately, the large warehouse and sewer works of this large construction site have been completed, otherwise there would be big trouble.

Because the boss is not allowed to play cards and drink during working hours, the security guards on duty, when they have nothing to do, sit at the gate of a large warehouse, chatting and farting.

This large construction site, the two projects that have just been completed, the sewer and the large warehouse, are both very large.

Among them, the large warehouse connected by these rows was built by Wang Qiang and his company's temporary construction team.

The large storehouse is a ten-meter-high sloping roof building, with the same width, about 30 meters.

The large warehouses are distributed in a semi-circular arc, and the total length adds up to about 300 meters.

In front of the door of the large warehouse, there is a large corridor with a sloping roof supported by concrete independent columns.

The large corridor is wide, about six meters wide and also six meters high.

At the center of the large semi-circular arc storeroom is a small square paved with concrete.

The small square is bare, and there are no other buildings, just flat concrete floors.

The top of the large warehouse is also designed with a sloping roof and a hanging bucket, and the glazed tiles are laid.

The semi-circular arc-shaped warehouse here just forms a 180-degree semicircle, and the gap is facing the road outside.

This is to make it easier for future security teams to have a clear view of the situation in the direction of the main road when they carry out security work.

From a distance, this large warehouse looks very tall and beautiful.

As a master architect, Wang Qiang's shot will naturally not be an ordinary building.

Any building he designs has its own character and can be photographed as a landscape.

Even the sewers that have been completed are different.

The sewer works are the culmination of a week's work by three construction teams in the county.

The sewers have been built, with a width of three meters and a depth of five meters, and the bottom and the walls on both sides are made of concrete.

The top of the sewer, covered with prefabricated cement slabs, has a drain every thirty meters.

At the top of the drain is a heavy iron lid welded with suitable steel bars, one meter square.

Wang Qiang deliberately used the magical paint of these round iron lids, the purpose of which was to prevent them from rusting and rotting.

When engaged in this kind of large-scale construction, Wang Qiang found that the magic paint on the wind and rain upstairs was really useful.

The most amazing thing is that when configuring this magic paint, more than a dozen raw materials, not only can not have a trace of error, but also the time and sequence of configuration can not be a little wrong.

Otherwise, you won't be able to configure this amazing paint.

This allows Wang Qiang to use this paint boldly without worrying about the leakage of the formula.

He has decided that in the future, this shop car manufacturer will use a lot of this magic paint to replace paint, and make the vehicles produced in the future into the world's top brand.

The scale of the sewer project that has been completed is unprecedented in Tea City.

When the project was completed yesterday morning, Director Huang of the Construction Bureau of Lian County specially brought the relevant personnel of his department to visit and study for a morning.

Wang Qiang knew that this should have been informed by Secretary Zhao.

Because Chacheng is now planning to overhaul cement roads and urban renovations, sewer projects have become particularly important after experiencing the 520 major floods this year.

Wang Qiang is a demonic genius, and now he is recognized by the tea city.

Now that Wang Qiang attaches so much importance to the sewer project, of course they don't dare to be careless, and after receiving the notice from Secretary Zhao, they immediately rushed to visit and study.

There is a demonstration example of Wang Qiang here, and they will copy it in the future.

……

"Ah Qiang, this excavator is so powerful, let me learn it."

On the side of the main street at the head of the Chajiang Bridge, opposite the bus station, Luo Zun looked at the tank-type excavator that was clearing debris and leveling the land in the rain, and said very excitedly.

Working in such a place with an excavator will not be affected by heavy rain at all.

Because this is one of the highest places in the tea city, it will not be flooded.

On the edge of the vicinity, there is the Chajiang River, which is very easy and convenient to drain, only the ditch is not completely blocked, and there will be no waterlogging.

With a super excavator, Wang Qiang certainly won't take a holiday like other construction workers.

On this rainy day, it is no problem to level the land and clear the debris at the site of the company's headquarters building, which has not yet started.

The more than 20 acres of land here used to be the warehouse of the mining company, but it has been abandoned.

After selling it to Wang Qiang in the county, some useful things in the warehouse have been moved.

Now all that remains are some miscellaneous items and dilapidated low storehouses, all tiled and earthen houses.

It's easy to remove them with an excavator.

It's a big place, and it takes about three days to clear all the land.

Most of the debris should be burned on the spot, and the rest of the garbage can be picked up by car.

Now driving an excavator to work on the construction site, it is Chen Lin's girl.

This is the second time that she and Wanjun have taken their turn to drive the excavator out and help Wang Qiang work.

The two of them and Wang Qiang's twin sisters are rotated every three days, taking turns driving the excavator to help Wang Qiang work.

Luo Zun looked at this huge excavator so awesome, a dilapidated house, which was demolished in a while.

The garbage is then taken to a fixed spot by a large bucket to the side and piled up to be disposed of.

Not only did he see it hot, but even the brothers and sisters Luo Jing and Luo Ju on the side were also looking at it.

I don't know how cool it is to work with such a behemoth?

After they waited for half an hour, Luo Zun couldn't hold back any longer and proposed to Wang Qiang.

They really wanted to try what it was like to drive this kind of vehicle.

Especially in terms of vehicle machinery, Luo Zun, who is very fascinated and talented, saw such an awesome vehicle, he wanted to go up and drive a lap by himself.

"Of course you can."

Wang Qiang nodded and said, "However, it is still raining, and it is not suitable for beginners to drive an excavator to learn how to operate." When the rain stops, or it's the noon break, you three sisters and brothers can take turns to learn and try. ”

"The excavator I built with my own hands is a little more powerful than other excavators, very strong and durable, as long as you pay attention to it, it will not break down."

For Luo Zun, a sworn classmate, Wang Qiang intends to train him to be a talent who is in charge of his own affairs, and of course he will not refuse his reasonable request.

However, now is not the time, we have to wait until the rain stops.