Chapter 311: The effect is beyond imagination
"Brother, we have already moved six truckloads of timber with a large trailer, and there are still four truckloads of wood in the big warehouse that you have processed!"
Wanyu rode a tricycle, Wang Qiang and the other three girls pushed the cart behind, slowly heading towards the artificial lake, she asked curiously, "With so many pieces of wood of various sizes, is it possible to build a wind and rain building?" ”
It's no wonder she feels strange, it is really Wang Qiang's already processed, these wood of various sizes, a little too much.
This is no ordinary tricycle, but a super tricycle with a large trailer.
Pulling a cart full of timber forward, you actually need someone to push the cart!
This is the first time that the company has used this tricycle for the first time.
"Hehe......"
Wang Qiang chuckled lightly, and said while pushing the cart, "Xiaoyu, my brother has carefully calculated and processed these woods in strict accordance with the drawings, one is not more, and one is not less. ”
"You don't want to think about how big our man-made lake is. From the small island in the lake to the two banks, such a long distance, the wind and rain building is an enlarged and lengthened model, and it is normal to need so much wood. ”
He added, "However, don't look at the amount of wood now, and think that it will take a long time to build a large wind and rain building. ”
"The wind and rain building is all riveted buildings, and not even a single iron nail is used, only the processed wood is riveted and combined."
"The difficulty lies in the processing and preparation of all kinds of wood, and when it really starts to be combined and riveted, the speed is faster than you think."
He has had the experience of building a wind and rain building, and after a while, the speed at which he builds the bridge will definitely stunned a few girls.
The small wind and rain building outside his newly built gate building is just a work he used to practice.
In order to keep improving, by the way, to familiarize himself with the process of construction, it took him so long to complete.
Now that I have enough construction experience and a set of familiar processes, the speed at which I can build a wind and rain building will be fast enough to fly.
Moreover, because the man-made lake at home is too long, he has modified the construction process.
Compared with the original wind and rain building in Hongyan Village, the wind and rain building in the artificial lake has 36 large wooden stakes as support points and is erected in the lake along the way.
And the thirty-six load-bearing pillars have been carefully measured by Wang Qiang and firmly planted in the lake.
While talking, Wanyu rode a tricycle, and with the help of everyone, she had come to the shore of the lake.
This is where Wang Qiang has already measured.
More than a dozen piles of timber of various sizes are neatly stacked nearby, sorted and placed on the ground.
The reason why it is placed like this is, of course, to wait for a while and get materials to build the bridge.
Moreover, the various sizes of materials here have all been numbered by Wang Qiang, not only after processing the size, but also polishing it.
This is because they will help their sisters later, and after the numbering is completed, they will know how to distinguish the wood of various sizes and specifications delivered to Wang Qiang, so as not to be confused.
Moreover, numbering processing, Wang Qiang will be much more convenient when he builds the wind and rain building later.
As Wanyu finished parking the tricycle, everyone began to sort and unload the timbers from the back compartment of the tricycle and the large trailer, and put them neatly on the piles of timber with corresponding size numbers.
After unloading this truck, there are still four truckloads of timber to transport.
The reason why we don't use that new super black technology automatic loading and unloading truck to carry out this kind of work.
The main thing is the work here, not suitable for that big car.
Because the piles of wood should be placed close to the lake, the place where they are sorted is also very particular.
It is also necessary to leave enough space for Wang Qiang's construction, and to classify the number to facilitate the nearby materials.
When doing meticulous technical work, even if it is a fully automatic machine, it is not as easy to use as manually.
Technology is sometimes not a panacea.
After unloading the timber of this cart, Wang Qiang and the four girls went back and forth four times between the lake and the big warehouse at the foot of the mountain.
It took us more than half an hour to finally transport all the timber of various sizes needed for the construction of the wind and rain building to this construction site.
Because the thirty-six huge support columns in the lake have been positioned and fixed by Wang Qiang in advance.
All the timber transported has been processed into a suitable size through the universal super machine tool in the workshop, and Wang Qiang has nothing else to prepare.
As a result, a construction work that tested the carpenter's skill was officially started under the watchful eyes of the four girls.
The first thing to do was to build a large wooden bridge that connected to the island in the middle of the lake.
These woods have been carefully brushed by Wang Qiang with magical paint a few days ago, and they are not afraid of water.
With the cooperation of several girls, Wang Qiang first carried a large pile of wood with the longest size and began to build the framework of the big wooden bridge.
Because all the places that need to be riveted have been machined interfaces, just rivet them directly.
With the help of two canoes placed on the edge of the artificial lake, Wang Qiang erected and riveted the long logs, and then beat them with a mallet......
More than an hour later, the frame of a long wooden bridge was built.
Then it is to quickly lay the planks at the bottom of the big wooden bridge and formally shape the big wooden bridge.
The bridge deck is paved with large planks of a uniform model, which also need to be riveted into the interfaces on both sides of the large wooden bridge.
The younger sister is responsible for passing the wooden planks one by one, and Wang Qiang is responsible for riveting and laying.
Everyone worked together to lay and rivet the bridge deck, which was carried out more and more quickly.
By the time the entire deck of the large wooden bridge was built, it took less than half an hour.
The work that continues is to build this large gatehouse-style wooden bridge, with gatehouse columns on both sides of the bridge deck, and two long rows of beautiful balustrades.
This round of work is a little more complicated.
But with everyone's cooperation, Wang Qiang, who has already had experience in building a wind and rain building, is still moving fast.
More than an hour passed, and the large columns and railings on both sides of the big wooden bridge had been erected.
The last thing that needs to be riveted is the top of this gatehouse-style wooden bridge with a sloping roof and a cornice bucket.
At this time, it was already evening.
However, Wang Qiang's brothers and sisters did not mean to call it a day, and were still happily carrying out the next round of construction work.
When the sky was just getting dark, the extra-long version of the gate tower frame on the big wooden bridge had been riveted and built.
The lights of the two large lighthouses also began to light up.
Under the extremely bright light, Wang Qiang and a few girls still had no intention of calling it a day, and began the riveting construction of the top of the final gate tower.
It wasn't until half past nine o'clock in the evening that this extra-long gatehouse-style wooden bridge with a length of dozens of meters was finally completed.
In the night, under the bright lights of the two big lighthouses, the entire golden enlarged and extra-long version of the wind and rain building looks shining!
Under the light, it reflects a charming golden yellow, reflecting the golden light of the artificial lake, which is so beautiful that people feel like they are in a dream!
A few little girls, looking at the spectacle they had just participated in and completed, for a while, they stared at a pair of big eyes one by one, stunned on the spot.
It looks like they're all a little crazy.
Be fascinated by the stunning scenery in front of you.
No one thought that the combination of two large lighthouses, a large artificial lake, and a super-long version of the wind and rain building would form such an unbelievably beautiful night scene!
Not to mention that the four little girls were completely stunned, even Wang Qiang was stunned on the spot.
He never imagined that the perfect combination he had inadvertently made would be such a dreamlike night scene.