Chapter 510: Start work after it's done
"Boss, got off work so early today?"
He Liping had just inspected the situation in various workshops of the automobile factory, and when she came out, she saw Wang Qiang and hurriedly greeted her.
She knew that Wang Qiang had been busy recently, but she didn't continue to work overtime every day as before.
However, it was a little strange today, and before four o'clock in the afternoon, he came out of the core factory.
"Well, after nearly a week of busy work, we finally finished processing all the spare parts of the 12 rollers and 16 large concrete grout trucks, and transferred them to the two large assembly workshops outside using the transfer equipment."
"For the rest of this afternoon, we will gather the technicians who participated in the assembly of the excavator last time to assemble the two special vehicles."
"It is estimated that it will take about three days to complete."
"In the future, the construction of various projects on the site can be mechanized, and the efficiency will be increased by at least 30%."
Wang Qiang emphasized to He Liping and asked, "Today, the Yanyan Bridge and the Xihe Bridge have officially started, have the technicians who are responsible for building the bridge been present?" ”
In order to build bridges and roads in the future, Wang Qiang deliberately used appraisal techniques again yesterday and personally selected and appointed dozens of technicians and persons in charge of the company's two large professional construction teams.
"Boss, don't worry."
He Liping hurriedly said, "Today's groundbreaking ceremony is presided over by me personally, and among the company's two professional construction teams, the 800-person construction team responsible for building bridges and roads is divided into two groups, each responsible for the construction of a bridge. ”
"Everyone arrived at the site on time, and in strict accordance with the drawings you made, we started work using the excavator."
"Boss, the construction planning drawings you drew are easy to understand, I, who is not a professional, can see it clearly, not to mention those professional leaders?"
"Mo Xiaoyong, the section chief of the quality inspection department, and Meng Jian, the deputy section chief, both graduated from the University of Civil Engineering, and I have strictly ordered them to pay close attention to the progress and quality of the project."
"That's good." Wang Qiang nodded, "You have to explain, the construction of roads and bridges can't be sloppy at all!" ”
"Once there is a quality problem, I will directly investigate the responsibility of the relevant person in charge, and will not tolerate it!"
He explained some more things to He Liping, and then walked towards the assembly workshop outside.
Now that the company is on the right track, he won't go out in person anymore.
Just like today, the groundbreaking ceremony of the two bridges, he also asked He Liping to take people to preside.
Knowing how to make good use of people, he understands this.
In the past, there was no way, and many jobs could not be replaced by others, so you had to come by yourself.
In addition, in the past year, the company has been in a state of preparation, and has not yet stepped into the right track, so I have to worry a little more.
Anyway, he had already done all the most important planning and design drawings and handed them over to the person in charge of the quality inspection department and the engineering team in duplicate.
If they make another problem, it will not be as simple as taking a pay cut and removing them.
If it is serious, not only will they be expelled, but they will also have to notify the patrol room to take the person away and pursue legal responsibility.
These are the words that he said to all the managers of the company.
Perfect rules and regulations and never arrears of wages, bonuses and benefits are the main reasons why the company has been running well so far.
The First Clan
After a while, he came to an assembly workshop equivalent to the company's experimental workshop, where there were already a large number of spare parts, neatly classified and numbered, and placed in the large workshop.
There are also dozens of technicians who participated in the assembly of dozens of excavators last time, all of whom have arrived and waited for a while.
Without saying a word, he directly led everyone and started the assembly of two special construction vehicles.
Now, the planned construction of roads and bridges has begun.
A large number of land acquisition and demolition work in the county is also in full swing.
A few days later, with all the villagers of Heping Village moving out, a round of construction will officially begin.
Therefore, as an important part of mechanized construction: the assembly of two special construction vehicles is already imminent.
They must be done as soon as possible so as not to affect the progress of the various construction projects.
Dozens of technical employees here are already familiar with each other, and everyone's cooperation is relatively tacit.
Under Wang Qiang's personal hands and command, the assembly of special vehicles is very efficient.
It wasn't until half past five o'clock that the time for work came, and everyone dispersed.
……
"Boss, this is the original factory building of Loncin Company, we can look at it, plus there are two stone mountains full of big bluestone nearby, it is very convenient to mine stones, so the concrete finished material processing plant is built here, which can be regarded as waste utilization."
Mr. Rao, the interim head of the plant under construction, said to Mr. Wang, who had just come to inspect the finished concrete processing plant.
After the plant was rebuilt according to the construction drawings, Wang Qiang sent a large stone crusher and a large belt conveyor equipment on the same day, and hundreds of people spent three days to finally complete the construction of a medium and large concrete finished material processing plant.
Wait a minute, it's time for the final line test.
There is a large warehouse for storing cement and a large sand and gravel yard on the side.
Various raw materials are dosed to a high rotating outlet using conveyor equipment.
Then, the driver drove the large concrete filling truck to a fixed place, and aimed the oblong large tank on the car at the discharge port of the large funnel above.
The concrete raw materials that have been thoroughly mixed and evenly mixed will enter the oblong large tank of the concrete filling truck through the large funnel above the discharge port, and then inject a certain amount of clean water into the large tank.
Then the driver of the concrete filling truck presses the corresponding power switch, and the big tank will rotate slowly on the car, which will not let the concrete solidify in the big tank, but also let the various materials that make up the concrete be mixed more evenly.
Wait for the driver to drive the concrete filling truck to the construction site that needs concrete, turn on the air pump on the car, and spray the finished concrete in the large tank to the corresponding place through the pipeline.
Because the oblong tank of the large concrete filling truck is very large, the pouring speed of concrete is extremely fast, which greatly increases the speed of engineering construction.
An hour later, the test of the production line had been completed, and Wang Qiang, who had not found any problems, explained a few words to Rao Min, the temporary person in charge here, and drove away from the newly built medium and large factory and drove towards home.
After being busy for about half a month, he got these trivial things done, and he can really be idle.
Secretary Zhao of the county, Director Meng of the Land Bureau, and Director Huang of the Construction Bureau went to the Land Bureau to complete the handover of the land transfer procedures three days ago.
Yesterday, while paying off the land transfer fee, the company got various documents and approvals such as land transfer certificate and construction permit.
That large piece of land of 430,000 acres already belongs to the company.
After the discussion between the county and Wang Qiang, after seeing the auspicious days of the zodiac, everyone decided to hold a grand groundbreaking ceremony at nine o'clock tomorrow morning on the side of the avenue leading to Yinquan Mountain in Ping'an Village.
A new round of huge construction will officially kick off.