Chapter 369 all want to take advantage

Nearly two hundred families, each of them would take a few minutes.

Four million, from nine o'clock in the morning until three o'clock in the afternoon, the money was distributed.

Of course, it's not all the time, but I still have a break at noon, after all, people have to eat, don't they?

The food at noon should be pretty good.

The things were brought over by Zhong Tao after the old house of the Chengxin family was ready.

By the time the money was received in the afternoon, there were not many people left in the village.

After many people received the money, they formed a team of more than three or five people for the first time. Walking or some other way, go to the bank in the town and save the money.

After all, there's a lot of money, isn't it?

There are more than 20,000 more, and there are 189,000 less, which is not safe to keep at home.

Originally, Chengxin was still thinking. Let the staff of CCB go to the village to handle the deposit business for Chengxin.

However, considering that many villagers deposit their money, the banks are different.

Some are industrial and commercial, some are agricultural, and so on.

Moreover, I am afraid that the villagers will not feel at ease because they did not make deposits at bank branches.

So, just abandon the idea.

After dividing the money, Chengxin was fine.

But he's fine, Su Xue is so busy.

Chengxin signed a land lease contract with them for 20 years.

They began to go from house to house.

Inquire about and register the building of a house.

Originally, Chengxin thought that this matter would be very troublesome.

As a result, I didn't expect that there was a subsidy for building a house, and there were quite a few of them.

The conditions were only rebuilt according to the original appearance, and only some internal structures needed to be changed.

Many people who can call the shots were registered that year.

The elderly who can't be the master, after notifying the descendants of the family, there are descendants who plan to build a new house, and immediately ask for leave to come back.

After asking about the subsidy and what conditions are required, they all register on the spot to build a house.

There are more than 190 people in the village, except for Chengxin, all of them have been registered at one time.

!! I thought it would take a year or two and divide it into several batches.

I didn't expect it to be so fast.

Hehe, this is quite a reflection of the farmers' hearts to take advantage.

Think about it, the price of a square meter of a two-story small brick and concrete building built in the countryside is less than 1,000, and at most more than 900.

The government subsidizes 501 square meters, and the development company subsidizes 1 square meter and 208 square meters.

Take Chengxin's old house as an example.

Seven hundred square meters, there are five real estate certificates.

However, because the hukou has been relocated, only one can receive the subsidy.

Therefore, these 700 square meters can only get 62,000 government subsidies.

The development company is fully subsidized, so it can get a subsidy of 196,000 yuan.

This adds up to more than 258,000 subsidies.

If the house is built with a brick and concrete structure, it will cost more than 600,000 yuan as a whole.

A house of more than 600,000 yuan can be built in the early 400,000s now, who can not be active?

And Chengxin and them are all together, but there are five families, and the old man did not follow that family.

Therefore, if the five brothers agree, the family will be in their early 80,000s, and the old mansion will be completed.

That might be a bit of a ramp to put it that way.

Let's count the families in the village who build houses independently.

Some build houses independently, and the family is a family of five.

The house is more than two hundred and three hundred square meters.

For these 300 square meters, the government also subsidizes 62,005.

The development company subsidizes 84,000 yuan.

That adds up to 146,500 pieces.

As for this house, the overall reconstruction will take about 2450,000.

With these subsidies, it only takes less than 100,000 yuan to build a house of 300 square meters, and the fool is not active.

Source change app】

The subsidy is not directly given first.

According to the regular procedure, after the consent of the village is required, it is reported to the town, and the town sends people to inspect and agree to start reconstruction.

After the construction is completed, someone will be sent to review it, and after the review, the compliance will be paid to the card left by the villagers.

But the village is different.

The government's subsidy is for the village to apply collectively and start building houses after approval.

When the house is built, the town will come to review it.

After the review is completed, the money will be sent to the village.

In the end, the villagers just went to the village to receive the subsidy.

If you want to get money before you build it, it's impossible.

There is one more thing that is the most troublesome at the moment.

With so many families building houses at the same time, it is a big trouble to find a contractor.

In a village, it would be good to have three or four families build new houses in the same year.

Where are more than 190 buildings built at the same time like this?

In the end, only the village committee came forward and invited many contractors in the town, and then let the villagers decide for themselves who would contract the construction of his house.

If you don't trust outsiders, then wait for an acquaintance contractor to build someone else's house after he finishes it, and then come to build it for him.

Among these contractors, there was the only one in the village.

That's Pi Tianqing.

This time, the village collectively rebuilt the house, and he was the one who received the most work among the contractors.

After all, he was from his own village, and many villagers were looking for him.

However, it is not possible to follow all of them in many.

Although he has been working on the outsourcing site all the year round, there are only more than a dozen bricklayers who can be found.

Therefore, he can only build a maximum of six houses at a time.

If you want to find him, you can only wait for a batch of houses to be built.

In this way, he also received a total of eighteen jobs.

If it weren't for the fact that these eighteen companies were divided into three batches, and it would have been more than five months since they were finished, maybe it would have been possible to receive six or seven families.

Of the dozen or so contractors who were called, the least of them received four or five, and the number of more ones was twelve or thirteen.

After receiving the job, these contract foremen were called to the village office for a meeting as soon as they received the job.

The main thing is to let them work honestly and don't engage in crooked ways, otherwise, there will be a way to make them sing behind bars for a few years.

The statement that you eat for free is not true, and when you go in, you either ask your family to pay for living expenses, or you can work in it to earn money.

Don't think you can eat free meals inside, that's impossible.

Chengxin did not participate in the selection of the contractor by the villagers, and he is busy now.

After so much time, the quotation from the second side of the game has come out.

The construction cost of all projects in Houshan, excluding elevators, was 39 million yuan in construction costs.

Hearing this price, Chengxin actually felt cheap in his heart.

You know, when he was on Earth, the Ordovician in their city, spent 100 million on these projects, and he was only less than 40 million, which was quite satisfying.

Hehe, he doesn't want to think about it, people spend 100 million, the project is more than him, and there are many supporting facilities.

In particular, there may be some moisture in this project, so it costs 100 million.

His project is not as much as others, and there are no supporting roads or other facilities, so it is cheaper than half.

In the end, after negotiation, 39 million directly became 40 million.

It's not that Chengxin generously gave an extra million.

The main thing is to build the steel structure of those projects, which needs to be pulled to the foot of the mountain by car.

The road in the village can't reach the front foot, and a road has to be built to get in, so it costs an extra million.

Moreover, the small bridge to the stone paved road under the hill of the village needs to be removed.

Otherwise, the trucks transporting the materials will be crushed and all of them will be crushed.

After signing the contract, Chengxin is the same as last time, and the money is relatively fast.

20 million was directly given in the early stage.

There are 20 million left, and when the project is finished, 15 million will be given immediately.

The remaining five million were used as a deposit, and no accidents were settled after a year.

As for the resort and the ancient street, the drawings have not yet come down, so these two projects have to wait for a week.