Chapter Eighty-Four: The Ghost Construction Team
Early the next morning, Jiang Zheng called Chief Engineer Lin of Lan Yuan.
When the forester heard, what?
Are you going to dig up the mountains and build ancient tombs in the mountains?
I'm going to go.
Are you so awesome now?
Jiang Zheng didn't say that he would do it himself, so he asked him to make a plan first, do it according to the requirements of the ancient tomb, draw a free design first, and then calculate it later.
This part is not in the plan, &bsp&bsp but the plan was originally done in the second phase, and the third phase depends on the situation, so it was only done roughly.
So Lin Gong didn't have anything to say, so he started to do it according to Jiang Zhengti's request.
Jiang Zheng doesn't want him to be fine, just make a rough layout and planning diagram first, and don't need any specific construction plans, &bsp&bsp and then estimate the cost according to this.
Lin Gong listened to the simple requirements, &bsp&bsp directly asked his subordinates to quickly design.
Isn't it just some kind of ancient tomb mechanism to make some Buddha statues or something? Since the requirements do not need to be accurate, then measure the terrain, see how it can be actually dug, calculate the amount of earthwork of the project, and then draw a few rooms, and finally roughly get some planning for Buddha statues, and it will be done quickly.
The terrain had been measured a long time ago, so now that I recalculated it, I found that it couldn't be that big...... This broken mountain is too small to dig such a big hole. So in the end, Mao estimated, according to this requirement, 100 million can almost be done.
He instinctively reported to the high.
As soon as Jiang Zheng heard the music, it would be easy to do.
Take this directly and talk to Zheng Xinglin.
That's when you tell what you really think.
Zheng Xinglin was directly stunned when he heard it? Are you going to do your own engineering? Or dig a cave to build a big Buddha? The forestry industry is estimated to be 100 million, and you only need 100 million?
me!
Are you so fierce now?
He called the forest worker directly, and the forest worker was also stunned when he heard it.
Oh, co-authoring your old ginger is going to do it yourself?
After a phone call on both sides, I woke up.
It's been calculated!
Zheng Xinglin repeatedly confirmed that 100 million is indeed the quotation of forestry workers without knowing it, &bsp&bspAlthough forestry workers reported high, under normal circumstances, 100 million is indeed not so easy to do.
Because Jiang Zheng proposed that this is the third phase of demand, &bsp&bspZheng Xinglin is not easy to refute, so he can only delay it on the grounds that the second phase has not yet begun.
But Jiang Zhengke didn't tell him this, and directly told him that 1500000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000
Get.
The 1500 million yuan that was originally used to bundle Yisheng Media has now become the bundle of Lanyuan Group's own.
If people want to pay for it themselves, you can't help it.
Thinking that 100 million really can't be taken, Zheng Xinglin had to make a report to the top first, and after consultation, he said that he could admit that the 100 million was made by yourself, but there must be a complete plan.
You can't just dig a hole and fool me, saying that you invested 100 million.
Jiang Zheng waved his hand to design you, I am responsible for the realization, you can design according to the standard of 100 million, but to enlarge the civil construction as much as possible, reduce the cost of materials, but can increase the cost of art.
All in all, one sentence is big and inappropriate, and it is flashy.
This makes sense in terms of attraction needs.
Gu Jin<spa>So Zheng Xinglin didn't have anything to say, and he directly asked the engineering department to do the design, and he was also very ghostly.
Since you like to strengthen the soft decoration, then I will play with you bigger.
The soft decoration requires a straight line to be raised, and it is important to arrange it beautifully.
The cost of soft decoration is not low, and the cost of complexity may be higher than the construction cost.
For this reason, there are a bunch of blueprints alone.
Jiang Zhengle accepted it, anyway, it was a wonderful thing for Ke Youyou, and it saved everyone's design fee.
A good design is worth millions.
After getting the design drawing, Jiang Zheng took a detailed look at it, and pointed out some small modifications according to his own needs, and finally confirmed that according to the construction of this drawing, the internal infrastructure and earthwork handling costs can be done for a few million, and the material cost plus part of the labor is about 20 million.
Very good.
25 million for 100 million.
If they let go of this bit of work, it is estimated that they will be able to do it in half a month. But it can't be really that scary, so let's take everyone around every night and build on the normal schedule.
Wait until the middle of next year, directly unveiled, and everyone will be responsible for the flow of confusion and shock on the spot.
So then Jiang Zheng took the drawings to the Ze County Government to report.
Zexian was also shocked when he heard that you were going to dig the mountain.
But Jiang Zheng swore that Ozawa Mountain was not a famous mountain and river, and he was not distressed when he dug it up to make scenic spots, so he quickly approved it.
It's still going through the process here, Jiang Zheng has nothing to do and took the devil into the mountain to dig a hole.
An invisible construction team.
Ghost Construction Team!
Fortunately, the New Year will be over soon, Lan Yuan's engineering team has gone home for the New Year, the employees in the ghost town are all Jiang Zheng's subordinates, Jiang Zheng said a word, no one dared not listen, so the ghost construction team quietly entered the village, don't shoot, it's okay There are still a few ghosts outside to stay on guard, whoever dares to come over will scare you to death!
In just a few days, a long mountain road has been dug through.
There is the ability of melon farmers to turn over the soil, and here it is soft soil, so the excavated earthwork is simply automatic flowing, and it is piled up into a slope when it is walked to the side.
Li Xianyun suddenly felt that if these soil slopes were piled up, they could continue to form mountains, wouldn't they be able to expand the area of the cave?
To put it bluntly, you hollow out the mountain and rebuild it with the dirt you took out.
They can't afford to build a building, but they can integrate materials, cement is not needed, and it is easy to build a mountain.
It's still Jiang Zheng who persuaded him to dispel this idea and cover the mountain is a bit too much, and he has to come back to investigate, so it's hard to explain. Besides, it is a fee calculated according to 100 million, no matter how big you are, he doesn't recognize Lan Yuan.
Li Xianyun had no choice but to give up.
But Li Xianyun's heart to pick out the project money is not dead, and sooner or later there will be such a day, so he will bury this foreshadowing first. Let's not rush to move the soil first, and when the next three phases are over, I will officially expand this side.
If this really makes him become, Xiao Ze Mountain, which was originally a spire, will have to swell into a square-faced flat-topped mountain in an instant-a square mountain!
As Jiang Zheng said, in heaven and on earth, where is there no chance to play?
When the ghost town is fully loaded in the future, it will not work in the sky, and there will be underground.
When the earth was dug out of the ground, the mountains were built.
4,500 acres of land, I can make more than 10,000 acres of sightseeing area!
With this idea, Li Xianyun is also full of confidence and ambition.