Chapter 0178 Construction Quality Problems
The budgeter has accurately calculated the construction company's project, and the cost of infrastructure construction will cost 200,000 yuan.
Renovation requires seventy or eighty thousand.
300,000 yuan for all completions, plus 300,000 yuan for the land, a total of 600,000 yuan.
More than 100,000 yuan of various equipment depreciated by the company of Yan Yuanchao.
The next step is to procure various raw materials.
The excavator entered the site to dig the foundation, the reinforced concrete entered the site, and began to spend funds.
I went to the relevant departments with Lee Myung-bak to apply for the establishment of the company and gave several conditions.
The third-level qualification of the construction company, enterprise assets of more than 8 million, more than 5 engineering constructors, the main person in charge of more than 5 years of work experience, more than 6 intermediate technical constructors, structure, water supply and drainage, electrical and other majors are complete. Professional management of more than 15 people, quality inspectors, safety officers, mechanics, cost personnel.
There are no less than 30 skilled workers.
These are all stipulated in the document, but many things can be resolved privately.
Having a few meals with the relevant leaders, drinking a few times, and sending some money in private, the problem can be easily solved.
declared the name of the company, opened a company account, and transferred 8 million funds.
Huang Guanyuan injected 5 million funds, accounting for 6% of the shares, and assumed the position of chairman, responsible for contacting project orders and collecting project payments.
Yin Yuan injected 3 million funds, accounting for 4% of the shares, and was responsible for the management of the company and the project management.
The power company installed electricity and pulled it to the construction site, and the water plant arranged for workers to connect the water.
Arrange electrician Yang Junqi to come to the construction site to pick up the water and electricity work.
Yin Yuan asked him, "How is the relationship with Luo Jinlin, have you cooked the raw rice?" Look at Mo Yaguang, who is already living with his girlfriend."
Yang Junqi said helplessly: "Alas, there is still one biggest problem that has not been solved, she must find her sister, and let her sister call the shots for her, otherwise she will not let go."
Yin Yuan only remembered meeting Luo Jinfeng in Dachong Town at this time.
"I almost forgot, I told you a happy event, Luo Jinfeng opened a hardware store opposite the town government of Dachong Town, last time I went to my uncle's house in Dachong Town, because the town government has several office buildings to be built, I went to see the construction site, I saw her there, and chatted with her a few words, she said let the two of you have time to go over to find her."
Of course, there is no need to talk about meeting her in Guancheng Entertainment City.
"That's great, I'll tell Jin Lin to go later, tomorrow the two of me will take a day off and go to Dachong Town to see her sister."
"Her sister actually went to open a hardware store, is the business good?"
"Business is good, I stood in her store for more than ten minutes, and a few customers came in to buy things."
"She hasn't opened a store before, so how did she come up with the idea of opening one?"
Every time she talked to Luo Jinlin about her sister, she worried that she would return to her old business.
Now she would be very happy if she was told that her sister had opened a hardware store.
Yin Yuan instructed him: "Connect the water and electricity here well, it will not affect the construction of the workers, you can ask the Red Soldiers for leave."
On this side of the construction site, someone set up a temporary shed, and arranged personnel to take care of the construction site.
The outer fence is under construction in advance.
The excavator began to enter the site to excavate the soil, and the earth-pulling truck pulled the loess to the foot of the mountain and dumped it.
Half a month later, the foundation began to be reinforced.
Yin Yuan went to the armed police compound to see the progress of the renovation of the office building.
As soon as he arrived at the armed police compound, he walked around the building and saw several obvious cracks in the outer walls.
Nguyen Van Long told him: "These cracks have been dealt with several times, and it should be that when the house was built, the load-bearing columns did not meet the specifications, narrowed and became smaller, and the foundation has not yet stabilized, which caused this phenomenon."
Yin Yuan climbed to the roof and found that the waterproof layer made of the roof, including the top floor slab, was cracked.
Several interior wall decorators told him, "There are more than a dozen cracks in the whole building, and water leaks when it rains. The construction technician also said that it was caused by our failure to do the waterproofing properly."
Yin Yuan walked through them all
, see a clear crack in the place where the water will leak.
He went directly to the office of the money manager of the engineering department.
"Mr. Qian, there are more than a dozen leaks on the roof of the building, are you free, come with me to have a look?"
The fat man said, "Don't look at it, you just deal with it."
Yin Yuan said: "It's definitely no problem for me to let the workers handle it, but the key is that the construction workers can't put all the blame on us. Do a good job of waterproofing, what is the problem of water leakage when the floor cracks, the construction staff should know better than us, right?"
The fat man said, "That kid is talking nonsense, but he is afraid of responsibility. Mr. Yin, you see if this will work, let your workers fix it in time, and don't let Party A find this problem. Otherwise, it will be difficult for us to get the balance. The key is that their unit still has two buildings to build, and if this one is not up to standard, the other two will definitely not be for us."
Yin Yuan promised, "It's no problem for everyone to cooperate."
He told the workers to use the perforated grout method to deal with the leaks.
Crack the crack outside, fill it with joint glue, paste the mesh belt outside, scrape the putty on the exterior wall, and finally spray real stone paint.
He went to Section Chief Zhang to ask for the progress payment of the project, and according to the contract, 30% of the progress payment should be paid.
After calculating the payment with Section Chief Zhang, he wrote a payment receipt and asked Yin Zaidao to sign it.
Yin Yuan saw Lin Sen in Yin Zaidao's office.
"Hello two leaders, it's been a long time."
Yin said to him again: "You guy, you don't see the shadow on weekdays, and I can only see you after collecting the money."
Lin Sen also asked him, "What have you been busy with lately?" I heard that your building materials factory has a lot of orders, and the business is very prosperous."
Yin Yuan said: "The building materials factory has a lot of orders now, and the workers are working overtime to produce. By the end of the year, there is indeed a great demand for decoration materials."
He wanted to tell them about resigning from the position of captain, but he thought that Cheng Bin asked him not to resign in a hurry and not talk until the end of the New Year.
Yin praised again and said, "This guy, last time, he caught a suspect who had been dead for more than 20 years, and he made another contribution."
He signed his name on Yin Yuan's payment receipt and asked him to take it for the financial transfer.
"There are more than two months to go before the Chinese New Year, can the renovation work be completed before the end of the year?"
Yin Yuan said, "It is estimated that it will be completed in another month."
Back at the company, he told Ren Chunlin about the cracking of walls and roofs.
"This phenomenon is normal, the main reason is that the foundation is sinking, of course, it is related to the construction process is not strictly in accordance with the drawings, or which corner bearing column does not meet the design specifications of the drawings, is too small or too narrow. Small cracks are inevitable in all buildings. However, if the crack is too large, it will be a very serious problem, and the acceptance will definitely not pass, and it will even give the Construction Authority a warning."
Ren Chunlin's explanation convinced him.
When he went back to the renovation company, he told the Red Army about the cracking of the walls and roof of the office building of the armed police compound.
The Red Army said: "Those cracks have appeared in the past few days, and they have not been seen at first. The construction technician also said it was caused by our problem."
Yin Yuan told him: "This phenomenon is caused by the fact that the load-bearing columns do not meet the specifications when they are built, and the next time he talks about this problem, you will tell him that it is the responsibility of the quality inspectors of the Construction Bureau to inspect it?"
Sometimes you really can't carry the black pot for others, otherwise the other party will think that you are a bully.
He took the Red Army to the compound of the Xinhui District Party Committee to see the decoration of the office building.
The two of them first looked around the inside and outside walls of the building.
There are definitely small cracks, especially in the facades.
The Red Army asked him, "Brother, what do you say is the matter with this phenomenon, is it also caused by the load-bearing columns not meeting the standards?"
Yin Yuan told him: "If it is caused by the sinking of the foundation and causes cracks in the outer wall, then he is cracked to the end. The appearance of small cracks like this criss-cross is related to their scraping of cement mortar. The ratio of cement and sand is not well matched, and it cracks as soon as the sun shines. Fortunately, we are spraying real stone paint with them, even if it is a lot of these small cracks, spraying
After the real stone paint is on, the surface is not visible. If it's painted, it'll be obvious."
The two of them went to watch the side of the real stone paint, and they really didn't find this problem.
On the whole, the construction quality of this building is higher than that of the office building in the armed police compound.
Chen Guangming's management of this construction company is also relatively in place.
He found Chen Guangming and asked him about the advance payment of the project.
Chen Guangming knew Yin Yuan's relationship and didn't want to offend him, so he issued a receipt for the advance payment of the project and asked him to go to Wu District to sign it.
Then go to finance to withdraw money.
At this time, Yan Yuanchao called him.
"Master Yin, are you free? There's something I'd like to discuss with you, and we'll meet and discuss."
"Okay, where can I find you?"
This Yan Yuanchao always asked him to go to Macau to gamble money, but he definitely wouldn't agree, wouldn't he talk about it again?
"Here in the villa area, I'll wait for you here."
Could it be a matter of renovating the villa.
At the beginning, several homeowners who brushed the paint saw that other homeowners sprayed real stone paint better, so they made a fuss and said that they would also spray real stone paint, but they refused to add money.
If you want to change it now, if you don't add another money, Yin Yuan will definitely ignore them.
Could it be this?
They forced Yan Yuanchao to talk to him about it?
Yin Yuan was still thinking about how to reply to them about this matter.
On the way, he told the Reds that it might be the case.
He calculated with the Red Army how much it would cost to paint the walls and then spray the real stone paint.
Don't make their money, but the cost price still has to be recovered.
When I came to the villa community, I saw Yan Yuanchao talking to a construction bureau cadre wearing glasses, standing at the door of the community.
Seeing Yin Yuan and the others coming, Yan Yuanchao said to him, "This is Li Weimin, section chief of the Construction Bureau, who is in charge of urban water supply and drainage projects."
He said to Section Chief Li: "This is Yin Yuan, the people in my construction company have taken it all over for him, and he applied to register a construction company himself."
Yin Yuan shook hands with Section Chief Li: "Section Chief Li, hello, you can find me to do engineering in the future."
Li Weimin said: "Now there is a drainage project looking for someone to construct, that is, the drainage of this villa community, which was unreasonable in design and needs to be rectified."
He pointed to a new community that was being planned and built opposite, saying, "To drain the water from the villa complex to the canal opposite, you must bury a cement pipe with a diameter of 60 centimeters, and go from this direction to the canal opposite. Now there is no underground drainage pipe buried here in the community, so every time it rains heavily, many places in the community are seriously waterlogged, and the water cannot be discharged in time. The drainage pipes in the community must be re-planned to ensure that the only high-end community in the city can live comfortably."
He took a drawing and showed it to Yin Yuan, stipulating that a cement management device with a diameter of 60 centimeters should be used uniformly.
The contract price is 60 yuan per meter.
The total project is 4,500 meters and the cost is 270,000.
"Mr. Yin, do you think this project can be accepted at the contract price? If you can, you can come to the BCA and find me."
Yin Yuan asked, "Is this project paid by the Construction Bureau, or is it paid by the homeowners of this community?"
Own a villa here.
If the public pays, it is enough to have a good relationship with the leader, but if the owner raises money, unless the money has been raised, it will be troublesome to fight each other at that time.
Li Weimin said: "The Urban Renewal Bureau will allocate 100,000 yuan to support, and the remaining 180,000 yuan will be borne by the residents of the community, and the 100 owners here will invite 1,800 yuan per household. Of course, we will collect the money from the residents first."
Yin Yuan knew that this kind of project that apportioned some expenses to the owner would not be very high in terms of quotation, but the quality should be guaranteed.
The profit will not be very high, but there will be money to be made.
This kind of small project has a short cycle and quick results, and it can be achieved when practiced.
while
But he couldn't just say yes.
"I'll go back and budget with a couple of managers, and then I'll get back to you."
Li Weimin nodded and said, "You reply to me as soon as possible, I also know that the contract price of this project is not high, but there is a certain profit margin. If this project is done well, I often have this kind of drainage project in my hand, so don't be like this Mr. Yan, who is still picky and selective in doing projects."
Yan Yuanchao said to Yin Yuan, "Master Yin, you have a good relationship with Section Chief Li, and in the future, you will receive some orders for water supply and drainage, road and bridge projects from him......
Yin Yuan invited the two of them to a restaurant for dinner.
Yan Yuanchao said to Yin Yuan in private: "I was not very interested in drainage projects before. The owners of this villa complex were reluctant to pay too much money at first, laying large cement culverts, only to discover the problem after several heavy rains. I can't be blamed for this, but if I had asked someone to do the work, they would have been unhappy when they paid for it. It's different if you do it......
Yin Yuan took the construction plan back to the company and discussed it with Ren Chunlin.
After budgeting, I think there will still be a profit of 50,000 or 60,000 yuan.
"Now the cost of cement pipe materials with a diameter of 60 cm is 25 yuan per meter, and the manual cost is about 15 yuan per meter, so there is a profit of 20 yuan per meter, and the gross profit of 4,500 meters is about 90,000 yuan."
Ren Chunlin said: "Using a trencher to dig, five or six people can be completed in more than a month."
He called Huang Guanyuan to talk about it.
He was also very happy and said, "Yes, as long as there is a project and there is a profit to be made, you can take it."
Yin Yuan went to the Construction Bureau to sign a construction contract with Li Weimin, and he promised to collect money from the owners of the community.
The 100,000 yuan of the urban renewal bureau project can be transferred to the account of his company first.