Chapter 343 It's easy to work, but it's not something that anyone can do
As soon as the big guy spoke, the other experts who touched the fish immediately patted him.
"Yes, yes, I was still thinking about what the last section of dirt was, but I didn't expect it to be sediment!"
"I also wondered if the construction unit did not dig enough pile length, and the drilling team drilled the soil according to the design pile length."
"Is there no hole cleaning link before the construction unit is filled?"
"This design institute also paddles, so you have to do the process of drying holes and making mud to protect the wall?"
"You see he doesn't have enough land this time, where can he get a mud pool......
The industry bigwigs made a final decision, and other experts instantly found the direction and expressed their opinions.
The more Mr. Wang listened, the more headache he felt.
Lao Tzu's official drawings for this project have not yet been designed, and if you follow your intentions, this drawing will not even pass the review.
If the pile foundation construction technology is replaced, not only the construction cost will be increased, but the overall project schedule will have to be delayed.
It's not a big deal for these experts to really watch the excitement.
"Professor Shen, you said, how can we deal with this situation?"
"According to the specification, it needs to be reworked." Brother Shen pointed to the foundation pit and said: "Just 54 pile foundations, pull them out one by one, re-clean the holes, and weld the steel bars into the holes......"
"Is there a faster way?" Mr. Wang interrupted very rudely.
"Yes, but the cost of rework is minimal." Brother Shen said with a smile.
Mr. Wang had a painful expression on his face.
Maybe the cost of rework is the lowest, but the Chinese group can't wait!
Not to mention anything else, 54 cast-in-place piles, just pulled out one by one with a crane, at least half a month to start.
This is still a relatively smooth situation.
If it is not smooth, it has to cooperate with the excavator to excavate, but in this way, it is no different from the foundation excavation, and it also causes some damage to the undisturbed soil layer.
In order to ensure that the bearing capacity of the foundation meets the design requirements, the design institute will definitely expand the pile diameter, steel bar and concrete number......
This set of processes was tossed and thrown into it in three months.
Rework...... It seems to be "saving money", but the time cost is invisibly magnified.
The developer can't wait to build and sell the house in a month, how can he waste time on rework.
"Don't want to rework?" Brother Shen asked.
Mr. Wang nodded vigorously, hating to shake his head off.
"Well, from a quality point of view, rework and rectification are ideal."
After sighing, Brother Shen continued: "Since you don't want to rework, you can only use foundation reinforcement measures. ”
Mr. Wang asked eagerly: "How much time does it take to reinforce?" ”
Brother Shen said: "This requires us to demonstrate and try to adopt the most economical and time-saving reinforcement plan." ”
"Good! Then let's hurry back and argue. ”
Mr. Wang put his impatience all over his face and took the lead in leading everyone back.
First come up with a plan and then reinforce, it is best to solve the trouble within a month.
Even if the economic cost is slightly more than rework, it is acceptable.
Mr. Wang pondered in his heart.
Time, it's really not enough.
It's mid-November, and it is planned to make the pile foundations of the two 1# and 5# buildings facing the street and the smallest area by the end of the year.
Back in the conference room, Mr. Wang couldn't let this group of fishing experts mess with the rhythm.
After taking the microphone, he took the initiative to ask Brother Shen for the details of the reinforcement.
At this time, Brother Shen's authority was fully reflected.
All kinds of technical terms came out of his mouth, and the people present, even the people from the design institute and the survey unit, could barely understand it.
There are many words that even Zhang Yi can't understand, there is no way, the interlacing is like a mountain, some things have not been touched, and there is no concept in his mind at all.
Anyway, the big guy is awesome, shouting 6 is over.
Brother Shen took care of everyone's emotions very much, and quickly proposed the key link of foundation reinforcement.
This time, several experts are not jumping on the ground either.
Their little professional reserve is not even worthy of lifting shoes for Brother Shen, and they don't even have a polite link, so they directly recommend him to announce the reinforcement plan.
Brother Shen was also polite, and provided two reinforcement plans in public.
One is to require the design institute to carry out a comprehensive calculation of the foundation bearing capacity on the site, by increasing the width and height of the cushion cap and raft foundation.
The advantage of this reinforcement solution is that the cost increase is not much, and the disadvantage is that the time may be a little long.
Not to mention whether the design institute is willing to cooperate, it is also necessary to understand the bearing capacity of each pile, and divide the area according to the strength of the bearing capacity, which is time-consuming and labor-intensive.
Mr. Wang has not said anything, and the design institute first put forward his own views.
"Professor Shen, our hospital thinks that this scheme is a bit troublesome, or the single pile grouting reinforcement is more flexible, economical, and the key is to save time."
Brother Shen smiled.
This is the reinforcement plan proposed by your design institute!
When Mr. Wang heard this, he immediately looked at the design institute.
"Since Mr. Liu has proposed grouting reinforcement, there must be some ideas, you might as well speak it out and listen to it."
Mr. Liu hurriedly shook his head and said, "I just heard about it, let's talk about it by Professor Shen." ”
Ma Dan, you want us to design a reinforcement plan, but there is no door!
In case it is not up to standard after reinforcement, you will definitely throw the black pot on the head of our design institute.
If there was no risk, our design institute would have come up with a plan a long time ago, and it would be your turn to be an expert to grab food.
"What about the other experts?" Mr. Wang asked.
All the experts shook their heads and looked at Brother Shen in unison.
Brother Shen coughed lightly twice and said: "Then discuss the second high-pressure grouting scheme for pile foundation pile bottom sediment, which is a relatively mature reinforcement scheme suitable for complex terrain such as karst in the south......"
When it comes to the core key, Brother Shen tried his best to make it easy to understand.
A few minutes later, Mr. Wang and other people from Party A understood that the work was easy to do, but not everyone could do it.
Professional qualifications for solid foundation reinforcement are required!
"In the case of grouting reinforcement, the time is ......"
Brother Shen said: "If there is no accident, it will only be 20 days." ”
After 20 days, Mr. Wang said it was acceptable.
Today's expert argument is relatively successful, and the two things that Mr. Wang expected have been completed.
The responsible party for the quality accident was determined, and the pile foundation construction team designated by Mr. Wang assumed full responsibility.
After demonstration, the pile foundation reinforcement scheme was determined, as well as the reinforcement unit.
There is no choice for the reinforcement unit, so you can only choose Brother Shen, who made him an expert and also has this qualification.
Authorities in the industry are not bluffing.
A group of experts signed their names on the demonstration sign-in sheet and happily withdrew with the appearance fee.
As soon as the door of the conference room closed, Mr. Wang hurriedly came to the side of Brother Shen.
"Professor Shen, don't say anything, hurry up and arrange reinforcement!"
Brother Shen nodded and said, "Okay, I'll get a formal plan after I go back, and we can make preparations before we demonstrate it again." ”
"That'...... There was a reluctant request. Mr. Wang glanced at Shen Ye.
"Mr. Shen, can you help, let our construction site resume work first."
Shen Ye was stunned for a moment, I just came to get out of the way, it's about my birds.
Zhang Yi kicked him and whispered: "It's okay to resume work, take down the pile foundation construction of the entire area." ”
Shen Ye's spirits were greatly lifted, he was in a groove, he had to be Lao Zhang, taking advantage of the fire to rob a group of six! (End of chapter)