Chapter 551: Lack of People
At the same time as the production of special vehicles, the development of tank trucks and pump trucks began.
Strive to come up with a sample car in two years, test it in the third year, improve it, and finally pass the acceptance. It entered the production catalog and was officially put into production in the fourth year.
The composition of the organizational structure is chaired by Li Hucheng. Liu Bing is the vice chairman and general manager of the company, responsible for the daily operation and management of the company.
Although Liu Bing is now the director of the logistics department, she is also from a technical background. I have worked in the body and assembly factories before, and I am no stranger to automobile production.
In addition, he has a good relationship with Li Hucheng, and his younger brother Liu Ning is the vice president of Hucheng Group, which is acceptable to both parties and is more reassuring.
"Tiger City, when are you going to start construction?"
Xu Zhiqiang asked.
"After completing the formalities, the construction will begin. It is necessary to raise the land and then level it in all directions. ”
"Can it be put into production in three months?"
Now Xu Zhiqiang is very anxious, he is a new official, eager to open up the situation, alleviate the crisis of the auto repair plant, and boost the morale of the workers.
"No, after the land is raised and leveled, it still needs to be deposited during the rainy season. Besides, the current construction task of my third construction is also very tight, and there are no redundant construction personnel. ”
"You don't have enough people, you can find a construction team from outside. ”
"Even if you look for outsiders, it will not work for three months, and the infrastructure such as factories, warehouses, boilers, dormitories, and canteens must be the same, and you have to survey and design ....... ”
"How long are you talking?"
"It's the middle of June, and there are still five months of construction time, November 15th, before the freeze, the open field construction is over, and the indoor sweep is carried out, December 1st. ”
"However, I try to get ahead of schedule, and try to start work on November 15, five months. ”
"It's been a little longer. ”
"Director Xu, you should be content. That is, I have all kinds of large construction machinery, as well as all kinds of power tools, plus sufficient funds, so that I can have this speed. If you change to any construction company, it can be completed in eight months, which is considered fast. Start work at this time, you can't do it in winter, and you won't be able to deliver it at this time next year. ”
"Okay, that's the only way, then please Li Dong. Let's go back first, and tomorrow Liu Bing will bring someone to sign the contract. ”
"Let's eat at noon and then leave. ”
"Alas, the house is a mess, and there are a lot of things. When it is put into production, let's drink it again and rest when we get drunk. ”
Xu Zhiqiang and his party left, and Li Hucheng told Yu Danning the results of the negotiation.
The two had communicated in advance, and the result was basically what was originally expected.
"Well, there's a lot of work over there that hasn't been finished yet, and then there's a garbage treatment plant, and this time there's a special purpose vehicle company. ”
"Tiger City, there are too many stalls and too big, and it is easy to get out of control. No new projects can be put on this year. ”
"Good, good, this is the last one of the year. ”
"What about people? Every construction site is at full capacity, and there are no people. ”
"The garbage treatment plant will be stopped this year, and the three constructions will be free up next year. ”
"It's the only way, but there is no one to build the automobile factory. ”
"Tell Meng Guangzhi to go back to Hedong to recruit some. ”
"You, you think it's that simple. At this time, it is the season of the wheat harvest, and after the wheat harvest, the land must be planted. ”
"Besides, those who should go out to work at this time have already found a place. It's okay to have a small number of people, but the car factory needs at least one or two hundred people, where can I find so many suitable ones for a while? It's a big deal to ask Mr. Lin to draw two people to supervise it well. ”
"That's the only way, you call Dean Zhou, Feng Lun, and Wang Qian, and ask them to come to survey and design tomorrow. ”
The discussion was decided, and Li Hucheng asked Ye Hui to go to Sun Yufa and go to the township to go through the land transfer procedures together.
Then he called Lin Weiguo and asked him to meet with him in the four directions to discuss the matter of transporting earthwork and filling the site.
When Li Hucheng arrived in the Quartet, Lin Weiguo had already arrived.
"Negotiated with the garage?"
"It's negotiated. ”
Li Hucheng gave a general explanation.
"When will it be delivered?"
"On December 1st, I said try to finish it by November 15th. Time is indeed running out a bit. ”
"It's tight enough, but it's not hopeless. Now that the land has been settled, we will start working tomorrow. ”
"Tomorrow?"
"There are two things to do, one is to pull the earth, and now we can free up six cars. If you can't do it, hire a few more cars. The bulldozer is fine, at least one can be freed up. The hook machine on the side of the bull race will be over in two days and you can come back. ”
"The construction ...... started before the formalities were completed. ”
"Hahaha....... Never mind. Let's do good deeds and pad the depression. It's about to be the rainy season, so let's reinforce the embankment for free. Don't give money, don't ask them for praise, as long as they don't interfere, isn't it?"
This is a good idea, and it is worthy of the fact that ginger is still old and spicy.
"Dong Li, do the tankers and pump trucks you said really have such high efficiency?"
"Yes, you'll know when the time comes. ”
"When will it be shipped home?"
"In another twenty or so days, it will be about the same. Mr. Lin, you mean ....... ”
Li Hucheng seemed to have captured Lin Weiguo's train of thought.
"Since these two treasures are so magical, and now there is a mixing plant, why not use it?"
"The buildings are single-storey, and the ground and roof are made of reinforced concrete, which is much faster if it is poured with a pump truck. ”
Li Hucheng patted his head and suddenly realized.
I'm so busy, how can I forget about this stubble. Ready-made tankers and pump trucks are not used, and when will they wait?
"When Dean Zhou's drawings come out, I will arrange the construction period well, and strive to advance it a little earlier, so that we can use the automobile factory project to create a miracle. ”
The two walked to the embankment and looked at the square in front of them.
"Dong Li, the automobile factory can only use one hundred and fifty acres, and what are you going to do with the rest of the land?"
"Keep it for He Xiao and Gao Erlin, and wait for them to come back and show their skills. ”
"What are you going to tell them to do?"
"He Xiao is a high-end processing industry with international leading level of precision component processing. ”
"Where's Erlin?"
"If he wants to do a big guy, he can sell 50 or 60 million, 70 or 80 million yuan for a piece of equipment, and he can make tens of millions of profits. ”
"What equipment can make so much money?"
"Shields, have you heard of them?"
"Haven't heard of a shield machine. What exactly is this TBM for?"
"Tunnels are excavated, such as subway and train culverts. Do you know that ship maggots are such bugs?"
"You know, when I was a child, I saw bugs on boats by the Green River, and bugs that made holes in the board. ”
"Yes, it's the worm that secretes a slime when it burrows in the plank, which it uses to reinforce the walls of the cave. A French engineer was inspired to invent the shield construction method. ”
"In 1918, the world's first shield machine appeared in England. ”
"It came in 1918?
"yes, it's more than seventy years behind, so it's time to catch up. ”