Chapter 314: Inspecting the Construction Site (Asking for a Monthly Pass!)

Xiaoqing River originates from Yufu River, Xialiu and many springs in Quanshui City, flows northeast through mountainous areas, Zhangqiu, Boxing and other counties, and enters Laizhou Bay at 20 kilometers east of Yangjiaogou in Shouguang County.

It has a total length of more than 240 kilometers and a basin area of 110,000 square kilometers.

It is the only flood control and sewage drainage river in the main urban area of the provincial capital.

With the development of the city, the flood control and drainage pressure of the urban section of Xiaoqing River spring water gradually increases.

Due to a large amount of industrial sewage, domestic wastewater is discharged into the Xiaoqing River, resulting in more and more serious water pollution, and the fish and shrimp in the river are almost extinct.

This has led to the deterioration of the surrounding environment, which has seriously restricted the economic and social development of Quanshui City, especially in the northern urban area.

In the spirit of the meeting instructions of the leaders of the provincial party committee, Quanshui City carried out comprehensive treatment of the spring section of the Xiaoqing River.

The construction site is mainly in the Lishan district, with a total length of 1 km.

The first phase of the project has a total investment of 4 billion.

Four billion yuan is naturally not all used to desilt and strengthen river embankments.

The whole project includes flood control, urban drainage, sewage interception and control, road and bridge, pipeline rehabilitation, river water replenishment, landscape construction and cross-strait development.

In fact, the comprehensive management of the Xiaoqing River began in 97.

The bid section undertaken by Huaihai Engineering Corporation is only a bid section of the river part of the first phase of the Xiaoqing River Comprehensive Treatment Project, which is both flood control and landscape construction.

To put it bluntly, it is actually dredging, reinforcing the river embankment, and then greening the banks of the river.

It is similar to the project content of Niutouyu East Ditch.

When Yu Qingyang arrived, Chen Yongfa was already waiting at the intersection with the company's leaders and people from the project department.

"Lao Chen, it's coming very fast!" Yu Qingyang got out of the car and shook hands with Chen Yongfa.

From the company to the Xiaoqinghe construction site, it is much farther than from Niutouyu Donggou to the Xiaoqinghe construction site.

"It just so happened that I came to the Xiaoqinghe construction site today to see the situation, and when Lao Guan called me, I was already halfway there!" Chen Yongfa explained with a smile.

"Oh! That's a coincidence! I also thought I'd come over and see what was going on!

This is the first project over 100 million yuan undertaken by our Huaihai Company!" Yu Qingyang said with a smile.

As for whether Chen Yongfa is going to come to inspect, it just so happens that no one is going to worry about this.

Yu Qingyang shook hands with Vice President Meng Zhiyuan, Zhang Jianguo, Chief Engineer Meng Volunteer, and members of the project department one by one.

The project manager of the Xiaoqing River comprehensive treatment project is Zhang Jianguo, vice president.

The Xiaoqinghe Project Department transferred personnel from two engineering offices and half of the personnel from the technical department.

"Let's go, let's go to your project department first!"

"Mr. Yu, you follow my car, and I will lead the way in front!"

"Okay!" Yu Qingyang nodded, turned around and got into the car.

Follow Chen Yongfa to the Xiaoqinghe Project Department.

The Xiaoqinghe project department is much better than Niutouyu.

It's also a rented house, but it's big and spacious.

The courtyard alone covers an area of more than one acre, and the three-story building, plus the two two-story annex buildings in the east and west, has a total of more than 60 rooms.

The exterior wall is covered with dark gold wall tiles and bright red wooden doors, giving it a resplendent feel.

There is never a shortage of local tyrants in the spring.

"Mr. Yu, this is a nursing home donated by a wealthy man in Panzhuang to the village.

As a result, the house was built, and the rich man suddenly ran away.

It is said that it was illegal fundraising, and the donation was absconding.

This nursing home was shelved because of debt disputes!" Seeing Yu Qingyang looking at the yard in a daze, Chen Yongfa whispered to him to explain the origin of the yard.

Yu Qingyang nodded with emotion.

Around 2000, I don't know how many families were harmed by illegal fundraising.

In a word, it's still greedy.

In the last life, Yu Qingyang was also cheated by more than 50,000 yuan, which directly led to the breakdown of his first marriage.

Walking into the conference room, it was originally designed as an activity room for the elderly.

It has now been converted into a conference room.

"The construction scope of our company is K25+100-K29+000, with a total length of kilometers.

The main project content is the construction of river water conservancy projects and water conveyance culverts for the South-to-North Water Diversion, and the rehabilitation of municipal roads, bridges and pipelines......" Chief Engineer Meng Volunteer introduced the project summary to Yu Qingyang.

"I know all of this!

Tell me about the specific construction arrangements and the current construction progress!" Yu Qingyang interrupted Meng Volunteer.

"Okay, Mr. Yu, we take advantage of the favorable conditions that are now the dry season, and the left and right banks of the river project are constructed at the same time.

On the right bank, we divided into two sections at the same time, starting with the construction of the access road, the excavation of the earthworks above +200 elevation and the demolition of the existing masonry bank wall.

At the same time, the island cofferdam was built, and a deep water well was drilled for precipitation.

After the precipitation effect meets the requirements, the earthwork excavation of the new bank wall and the construction of the bank wall are carried out.

We carried out the excavation of the river channel on the left bank in three sections at the same time, all of which were constructed by zoning and layered excavation method.

First of all, a 4-meter-deep mud storage pit was excavated along the B area of the existing bank wall as a mud storage pit, and the silt on the left side of the river was dug out and stored, and the water seeped out and transported out.

After the silt is transported, the masonry bank wall on the left bank is dismantled, and at the same time, it is divided from right to left according to the standard of 8 meters wide, and the excavation is carried out in layers......

The existing bank wall of the second beach of the river channel is retained as the cofferdam retaining wall, and the new river channel formed by the expansion and excavation of the left bank is used as the construction diversion nullah, and the second dredging is carried out.

The water lifting well and the inlet will be arranged in a timely manner according to the progress of construction......"

Yu Qingyang understands that the so-called division into two sections and three sections by Meng Volunteer actually refers to two construction teams on the right bank and three construction teams on the left bank.

The Xiaoqing River Comprehensive Treatment Project is the largest project in Dongshan Province since the founding of the People's Republic of China, and there are supporting projects involving the South-to-North Water Diversion.

Nature attracts a lot of attention.

Although Huaihai Engineering Corporation won the bid, there were no less than 100 greetings from top to bottom.

Leaders within the system, leaders outside the system, local leaders, village leaders.

They all want to get a piece of the pie in this project.

"What about the current construction progress?"

"The distribution of the precipitation wells has been completed, and the precipitation wells are being drilled and the construction of the roadway is being built. Zhang Jianguo replied.

"Is there any difficulty?"

"The main thing is that there is a shortage of construction machinery, although there are many leaders to say hello, but there are more manual work, and there are few machinery.

Mr. Tang transferred five excavators, plus the local ones, there were only ten excavators and fifty dump trucks, of which thirty were Dongfeng dump trucks.

The amount of earthwork excavation in our bid section is 2.2 million square meters, of which 1.8 million square meters need to be transported!

The current capacity is simply not enough to ensure that the earthworks can be completed before the flood season. ”

"This is a practical problem!" Yu Qingyang nodded.

This year, the total investment scale of water conservancy projects in Dongshan Province alone has reached more than 10 billion yuan.

All localities are engaged in urban construction, road construction, building buildings, and it is inevitable that construction machinery will be tight.

This situation will not ease until next year.

Yu Qingyang rented an excavator to the general water saving department, and after the Hongwei River was dry, he didn't release the car at all, and was directly transferred to Xiaoqinghe.

For this reason, Mr. Lu called all the people abroad, and Yu Qingyang couldn't refute his face.

"I'll go back and ask if Mr. Tang can still pull out the excavator!

If you can't do it, go buy new machinery!"

This is the first project of hundreds of millions of yuan undertaken by Huaihai Engineering Corporation, and Yu Qingyang also attaches great importance to it.

It is necessary to let the leaders of the department see the work ability of Huaihai Engineering Corporation.

"Are there any other difficulties?"

"Something else, it's local relations, we're coordinating!" Zhang Jianguo thought for a moment and said.

"Well, Mr. Chen, let's go to the scene together?" Yu Qingyang looked at Chen Yongfa.

As for the local relationship that Zhang Jianguo said, Yu Qingyang didn't ask much.

The handling of local relations is something that every project manager must go through, and it is also a checkpoint that tests the ability of the project manager.

Zhang Jianguo, as the vice president of the company, if he can't even handle this, then Yu Qingyang should consider whether Zhang Jianguo has the ability to serve as the vice president of Huaihai Engineering Corporation.

Chen Yongfa and other leaders of Huaihai Company accompanied Yu Qingyang to the construction site.

If you don't consider the black water with a pungent smell in the river, the scenery of Xiaoqing River is still very good, and the green trees on both sides are shady, which is a good place for leisure.

Unfortunately, there are no schools of fish and shrimp, flocks of ducks frolicking in the river, and the river water is crystal clear.

All that remained was the jet-black river and the big trees on the banks.

Ten excavators are building a walkway and digging a deep pit where the silt is stored.

Because the water content of the sludge is relatively large, it is not convenient for direct transportation, so it should be dewatered first.

Deep pits are dug in the riverbank to store the silt and allow the water from the silt to naturally penetrate into the soil.

This is a relatively stupid and primitive construction process.

Even the most primitive and stupid construction technology is much better than the rough way of directly transporting it away in Niutouyu Donggou.

Of course, Niutouyu Donggou has its special reasons.

There are no conditions to dig deep pits and control the water of the silt.

Therefore, Yu Qingyang did not criticize the simple and crude construction methods of Huayu First Construction Group.

Fortunately, in 2000, environmental protection inspections were not strict.

If it is put in the future, the construction method of Huayu First Construction Group can directly pull down the blacklist.

"Mr. Chen, there are too few safety warning signs on the site and too few publicity signs about the company's image. Yu Qingyang briefly asked a small question.

"When we go back, we will set up warning signs and corporate image publicity signs!" Chen Yongfa breathed a sigh of relief.

For Yu Qingyang's sudden visit to the construction site to inspect, Huaihai Engineering Corporation was concerned.

This is the first project received by Huaihai Engineering Corporation and invested in Huayu.

It is also the first project he undertook after Chen Yongfa arrived at the company.

In addition, he is not familiar with Yu Qingyang, and he doesn't know Yu Qingyang's character, for fear that he will not be able to do anything in place, which will make Yu Qingyang dissatisfied.

Seeing that Yu Qingyang only raised a small question, everyone naturally breathed a sigh of strength.

"Hehe! Lao Chen, now rest assured?

Are you worried that I'll come over and find fault with you?" Yu Qingyang glanced at Chen Yongfa and asked with a smile.

"This ...... Mr. Yu made a request to us for good for us!

We wish we could have pointed out some of the shortcomings to us. Chen Yongfa was stunned, he didn't expect Yu Qingyang to speak so directly, and then laughed.

"There are a lot of problems, but I won't mention this here!

Tomorrow the group company will have a meeting, let's discuss it together!"

Yu Qingyang's words made the hearts of Chen Yongfa and others rise again.

Group meeting to discuss?

Chen Yongfa, Zhang Jianguo and others are all using their brains, thinking about what big problems are on the construction site, which need to be discussed at the group meeting.

"Don't think about it! tomorrow we will not discuss the individual phenomena that exist on that site.

It is some common problems that exist in the entire industry!" Seeing Chen Yongfa, Zhang Jianguo and others frowning and thinking about it, Yu Qingyang said with a smile.

Yu Qingyang's words made Chen Yongfa and others smile bitterly and slandered.

Halfway through talking, it's really scary to death.

At noon, Yu Qingyang had a working meal with everyone in the Xiaoqinghe project department.

Originally, Chen Yongfa planned to invite Yu Qingyang to the hotel.

was rejected by Yu Qingyang.

"Your food is not bad, the chef is also good, and the fish stew is delicious. ”

"Our food standard is seven yuan per person per day, and there are many people on the construction site here, so all the food is relatively good.

You can eat fish once a week, pork ribs, or braised pork.

The chef was found locally, and when the production team used to make big pot rice. Zhang Jianguo explained carefully.

"It's still a big pot of rice that tastes delicious! This tile fish has to be stewed in a pot before the taste can be incorporated into the meat!" Yu Qingyang smiled and didn't say much.

He knew that Zhang Jianguo was a little careful.

I don't explain much, sometimes the more you explain, the more people will think about it.

After eating, Yu Qingyang was ready to go home.

Two vans drove into the project department.

Down seven or eight young people who don't look like good people.

He has dyed yellow hair and wears a gold chain around his neck.

As soon as I got out of the car, I shouted, "Who's the boss?"

"I'm the manager of the construction site, do you have something to do?" Yu Qingyang didn't speak, glanced at Zhang Jianguo, and Zhang Jianguo greeted him and asked.

"Who did you say hello to when you were working here?" asked one of the yellow haired people in the lead.

"Hello, the comprehensive management of the Xiaoqing River is a key project in the province, and we are a subordinate enterprise of the Department of Water Resources.

I don't know, who else do we need to greet when we work?"

"I don't care if you're from the Department of Water Resources or the Department of Highways.

This piece is all under the control of our Brother Long.

You guys are working, and you have to say hello to our Brother Long. Huang Mao squinted at Zhang Jianguodao.

"We really don't know Brother Long, I don't know what Brother Long is doing in your mouth?"

"Who in Lin Yuan Town doesn't know our Brother Long?

Give you two days, hurry up and report to our Brother Long!

Otherwise, if there is a problem on the construction site, don't blame us for not reminding you!

Let's go!" Huang Mao finished speaking, turned around and got into the car and left.

It's really neat.

However, after listening to Huang Mao's words, Yu Qingyang also knew that that Brother Long was not a big role.

It is estimated that it is the head snake of the land, the street gangsters.

The pendulum is not small.

Send a few thugs to threaten them, and then ask the project department to report to them.

However, such a role is also the most difficult.

Like the previous boss Zhang, he belongs to the gangsters, and he is more disciplined.

Moreover, it is in the stage of whitewashing, so it is easier to deal with.

A little gangster like Brother Long, he is not afraid of the sky or the earth, he has one purpose, to ask for money.

If you don't give money, you'll make trouble.

The most difficult thing to deal with, if it is not enough to commit a crime, even if it is caught by the police, it is at most public security detention.

Turning back, it will still make trouble for you, and you will not be able to construct normally.