Chapter 315: Yu Qingyang gets angry and scolds (asking for a monthly pass!)
"You're busy, I'll go first!" Yu Qingyang finished and got in the car and left.
Left behind a group of somewhat dumbfounded leaders of Huaihai Engineering Corporation.
Yu Qingyang walked too chic.
The company's project department has just been endangered by local social elements, and as the boss of the group, he turned a blind eye and left.
"Mr. Chen, what does Mr. Yu mean?" Zhang Jianguo blinked and asked puzzled.
"Maybe it's a test for us!" Chen Yongfa said uncertainly.
"It should be! I've heard that Mr. Yu has always been very strong towards these social people!" Shan Heyu interjected beside him.
"Forget it, whether it's a test or not, this kind of thing really should be solved by ourselves.
If a trivial matter is troublesome to the group company, what do you want us people to do?
Let's go, go back to the office and study it!"
Back to the office.
"Lao Zhang, what are you going to do?"
"I invited Director Pan to dinner in the evening and talked to him.
Let's see what attitude they have at the police station!"
"It's okay, if the police station can suppress them, this is the best!" Chen Yongfa nodded.
It would be best if the police station could suppress these members of society.
Even if it costs a little, it's worth it.
At the very least, the police station will not be like those people in society.
People in society are wolves that can't be fed.
If you give him a little benefit today, he will ask you to do engineering tomorrow.
The day after tomorrow, I will feel that it is too troublesome to do the project and make less money, and I want to send sand and gravel.
The day after tomorrow, I feel that it is not good to send sand and gravel, and I have to advance money.
Simply, you contact the sand and gravel yourself, and how much money will be given to me in a car, and it will be refreshing.
Looking back, I found that I didn't make much money just lifting sand and gravel, so your construction team also had to give me money.
The appetite will get bigger and bigger.
"You say, Mr. Yu came today, what is the reason for this?
I listened to a few words of the report, and then went around the construction site, and mentioned a warning sign and an image publicity sign.
What is the problem of the common problem he mentioned at the end?" Chen Yongfa once again came to the construction site in advance of Yu Qingyang's inspection.
"Who knows! I don't understand the common problems," Zhang Jianguo said with some uncertainty.
"What do you want to do so much?
Since it is universal, then it is definitely not a mistake in our work, and we will know what the specific problem is when we have a meeting tomorrow!" Shan Heyu said with a smile.
"Also, it's useless to think about this.
I just thought about it, about the lack of construction machinery.
I have an idea, let's see if you can do it!" Chen Yongfa smiled, no longer dwelling on this issue, and turned to another matter.
Zhang Jianguo, Shan Heyu, and Meng Volunteer all looked at Chen Yongfa and waited for his next step.
"We can mobilize people from all over the company to contact construction machinery.
In order to increase everyone's motivation, we can create an incentive system.
As long as you can contact a dump truck and work for a month, you will be given a bonus of 200 yuan.
Contact an excavator, also work for a month, and give a bonus of 1,000 yuan. ”
"I think it's okay, if there are rewards, everyone will naturally be highly motivated. ”
"I agree with Mr. Chen. ”
"I agree!"
Zhang Jianguo, Shan Heyu, and Meng Volunteer all agreed.
"Okay, since you all agree, then this matter is settled, old man, you go back and ask the office to send a notice. ”
"Mr. Chen, I think we should expand the reward system to the entire group company?
Whether it is our Huaihai, or Huayu Machinery, or Huayu Furniture, as long as it can be linked to construction machinery, we will give rewards?" Shan Heyu suggested.
"I think it's okay, just do as you say.
This is the first project of hundreds of millions of yuan in our Huaihai, and it must be done well and completed on time with quality and quantity!" Chen Yongfa slapped the table vigorously.
In fact, seriously speaking, the Xiaoqing River comprehensive treatment project is not the first project of Huaihai Engineering Corporation with hundreds of millions of yuan.
Huayu Century City is.
It's just that everyone is engaged in water conservancy projects, and Huayu Century City is their own project.
Therefore, when everyone talks about it, they always unconsciously ignore the Huayu Century City project.
Huayu Century City, the scale of the project allocated to Huaihai Engineering Corporation is twice that of the Xiaoqing River Comprehensive Treatment Project.
However, the Huayu Century City project only sent a director of the engineering department as the project manager.
The Xiaoqing River comprehensive treatment project is personally undertaken by Zhang Jianguo, the deputy general manager in charge of the project.
From this aspect, it can also be seen that the attitude of Huaihai Engineering Corporation.
"There is another matter, Lao Zhang, have you chosen the spoil area?" Chen Yongfa, as the CEO of the company, is also very concerned about this issue.
"Studied and there are three of the nearest spoil areas.
One is located near Snail Mountain, about 6 kilometers away, which is relatively empty, surrounded by deep pits left by marble mining.
Although the distance is close, the depth of the stone pit is about seven or eight meters, and the surrounding is steep, but the entrance road is narrow and steep, and a large number of transport vehicles pass, and there is no wrong place to drive.
If you widen the road, it will cost a lot.
In addition, the entrance road needs to pass through a nearby village, and there is no detour road.
At night, the noise generated by earth-moving vehicles is relatively large, and it is estimated that it is difficult to coordinate.
The second spoil area is located near Dawang Village, Daqiao Town, with a distance of about 15 kilometers, from Hehua Road to the west to Jiangjun Road.
Jiangjun Road crosses the Yellow River Bridge 300m to the north, the site is flat, and the traffic is also convenient, which can ensure that the vehicle can be unloaded at any time.
It's just that the place is a bit small, and it is estimated that it can only store more than 600,000 square meters of spoil.
The third spoil area is located near Beizhao Village, Cuizhai Town, Jiyang County, with a distance of about 18 kilometers, from Hehua Road to the east across the Yellow River pontoon bridge, there is a large open field, with an average of 1.2 meters of soil, which can store about one million square meters of spoil.
The site is still relatively flat in this location.
It can ensure that the vehicle can be unloaded at any time, and the normal construction progress can be guaranteed. ”
"How much does it cost to widen the mountain road?
And how much does it cost to coordinate the village and guarantee access?"
"There is no one who can't get down this widening mountain road.
The most important thing is the village.
Walking through the village, it is too easy to get into traffic accidents.
It is estimated that the coordination will be very large. Zhang Jianguo was not very satisfied with the first spoil area.
However, Chen Yongfa was more interested in the first spoil area.
The other two spoil areas are more than twice as far away.
More than 1.8 million square meters of spoiled land, one side increased the freight by two yuan, that is, more than 3 million.
With these more than 3 million yuan, Chen Yongfa believes that it is completely possible to do the work in the village and the cost of widening the road.
"Communicate with the village first and see what conditions are available in the village!
As for traffic safety, we can have traffic safety officers at various intersections in the village.
Also, the problem of noise, you can tell the driver that when passing through the village, it is not allowed to honk the horn and reduce the speed. ”
"Okay, I'll contact the village tomorrow and see what they have to say. Chen Yongfa said, Zhang Jianguo didn't say more, nodded and agreed.
If it doesn't work, let's contact it first.
Not to mention that Chen Yongfa and others held a meeting to study the production problem on the construction site.
Yu Qingyang drove back to the company.
Huayu Century City is next to the company.
Yu Qingyang parked the car in the company compound and did not go upstairs, and directly called Xing Xiang to the construction site.
A huge deep pit with tower cranes lined up to form a piece of Tallinn.
The underground parking lot of Huayu Century City is connected.
Of course, in the later stage, Huayu Shopping Center, Huayu Mushitianhua Hotel and the community will be separated from the community by fire doors.
Area A and Area B, there are more than 6,000 houses in total.
Area A is a community for leading cadres at and above the department level, with more than 1,000 duplex buildings.
Zone B is housing for civil servants below the department level and workers of state-owned enterprises.
There is no way, it must be treated differently, otherwise, what should an ordinary worker do if he runs to the director's house at night and goes to the district chief's house to visit the door?
It's not that the leader is unwilling to mingle with his subordinates, it's okay for a worker to go to the door once in a while, and thousands of workers take turns to go to the door.
Do leaders want to rest?
"The soil quality is not bad!"
"It was originally cultivated land, and the soil quality is naturally good, and it is all loess. ”
"Where did the soil go?" Yu Qingyang asked casually.
"It's all transported to the ravine in the south!" Xing Xiang didn't care, and replied casually.
"You said they were all transported to the ravine?
"yes!"
"You loser! Such good soil, you will take it to fill the ditch for me?" Yu Qingyang glared and scolded.
"Otherwise, there is no place to put it! The nearest muck yard is more than ten kilometers away.
In order to save money, we specially bought such a ditch plot to pile up abandoned soil. Xing Xiang explained aggrievedly.
"You're not going to save it for a while and wait for it to be backfilled later, are you?"
"There is still such a large piece of land behind it that has not been developed, and we are not short of backfill ......"
"We don't lack it!
Let me ask you, have you read the plan of Dongcheng District?"
"Look!"
"Is it all under development?"
"Yes!"
"And what about up there, on the hillside, in the ravine?"
"They are all within the scope of development, and they are all planned residential communities. ”
"There's dirt on the south hillside?"
"Yes, very little, mostly stone!"
"Do they need to backfill the planting soil?"
"Definitely need!"
"You said you were a loser, don't you know, save the soil and sell it to them later?" Yu Qingyang scolded angrily.
No one knows better than Yu Qingyang that the south is full of barren mountains.
The kind of barren mountain where rabbits don't poop.
Most of them are bluestone bare, earthy slopes, and floating soil is only one or two meters.
In the future, there will be a lot of community development over there.
They are all provincial-level dormitory buildings.
What Provincial Highway Bureau, Provincial Transportation Bureau, Provincial Inspectorate, Provincial Court, etc.
This kind of unit, not bad money at all.
In order to achieve the effect, no expense is spared.
Because of these communities, the price of planting soil was once higher than the price of yellow sand.
Some people may question how it can be higher than the price of yellow sand.
Because of the high cost of shipping for planting soil.
Those who do engineering know that a Steyr King dump truck, full, can pull 17 square yellow sand.
However, it can only pull about 12 square meters of planting soil.
The planting soil is too large.
It's really hard for you to dig out a piece of soil and then try to fill it in, that's the reason.
Not to mention anything else, just the deep pit of more than 700 acres of land in front of me, and the five-meter soil layer, is more than 2 million square meters of soil.
Not counting the shipping fee, one side of soil can be sold for thirty yuan.
That's more than 60 million.
was just given by Xing Xiang to fill in the ditch, and the ditch is owner, it is impossible for people to let you fill it casually, and it must be beneficial to the village.
There are also more than 2 million square meters of freight.
One side doesn't need to be considered high, according to ten dollars.
That's more than 20 million again.
Inside and out, it is equivalent to a loss of 80 million.
How could Yu Qingyang not scold.
"This ......" Xing Xiang was a little dumbfounded, he heard for the first time that soil could still be sold for money.
"What are you?
Do you know that these soils can be sold for dozens of dollars in the future?
Tomorrow you will go and buy me that piece of land in your valley!"
I can't buy it, I'll go back and chop you and sell it!"
"I know Mr. Yu! Tomorrow, I'll go to the Land Bureau now to talk about buying land!" When he heard that it could be sold for dozens of yuan, Xing Xiang really had some claws.
Don't look at him as the CEO of the company, but selling him to him is not worth tens of millions.
Of course, Xing Xiang didn't believe what Yu Qingyang said about selling for dozens of yuan, but then selling for ten yuan is more than 20 million.
How much is it to buy the hundreds of acres of land in the entire Yugou!
"Go ahead! I won't look at the construction site anymore! I'm so angry that you're angry!" Yu Qingyang waved his hand and said angrily.
"Mr. Yu, take me!" Xing Xiang said hello and hurriedly ran.
Scolding people is just an expression of dissatisfaction, if you really can't buy that ditch, Yu Qingyang won't do anything to Xing Xiang.
At most, scold him again and let him remember.
It's no wonder that Xing Xiang, who has a front and back eye, knows that in a few years, the soil in this place can be sold at the price of yellow sand.
In this piece, it is definitely not only Huayu Real Estate that has transported the soil away.
The worst thing is the dormitory of the Provincial Transportation Bureau, because it was developed by a real estate company under them, and the newly formed company, which has no experience, spends money to transport the soil away, and then spends money to buy the soil back.
A few other good points, I also know how to save the soil.
However, it is far from enough for backfilling.
Yu Qingyang left the construction site, returned to the company, drove into the car, and came to the water conservancy machinery company.
As soon as he entered the door, Wu Yu was already waiting at the door with the company's middle-level and above leaders.
"Mr. Yu, welcome Mr. Yu to inspect and guide the work!"
"Lao Wu, let's not talk about polite words!
All of you are busy going to your own places, just let Lao Wu Lao Du accompany me!" Yu Qingyang shook hands with everyone one by one and said directly.
Driving people away, Yu Qingyang said to Wu Yu and Du Tenglong: "Let's go, let's go to the workshop!"
I listened to your report yesterday, but I didn't see the scene, it's not specific!
Let's talk while watching today!"
"Okay, Mr. Yu!" Wu Yu took the lead and led Yu Qingyang into the workshop.
"Mr. Yu, this is the machining workshop.
The frame of the electric bicycle is processed here. ”
An electric bicycle has dozens of parts, handlebars, brake handlebars, brake wires, light forks, 7-piece bowls, front forks, front brakes, front wheel assembly, mud plates, mud board sticks, frames, bottom brackets, bottom brackets, five-piece bowl wheels, cranks, chains. Saddles, saddle tubes, rear hangers, rear wheel assemblies, flywheels, ladders, rear brakes, etc.
There are also motors, controllers, batteries, chargers, and more.
Iron pipe processing parts such as handlebars, front forks, frame mud boards, support sticks, saddle tubes, rear hangers, and ladders are all produced by the water conservancy machinery company itself.
"We sold more than 1,000 vehicles in January and sold more than 5 million vehicles. Wu Yu proudly introduced.
"Listen to what you mean, it seems to be very satisfied?" Yu Qingyang stood still and looked at Wu Yu.
Originally, he didn't want to talk about Wu Yu in the workshop.
Just looking at his smug look, Yu Qingyang really couldn't help but want to scare him.
。 m.