Chapter 25 Mining Area Planning
Jiang Lang took them a group to visit, after shocking a few of them, and took them to see the end of the coal conveyor belt, the output pipeline interface of crude oil and natural gas, and then took them to see the orchard, now the orchard has graphics, the actual land circled is about 1630 acres, and the design ideas of Shunda mining machinery are described to it.
After turning around, it was noon, Jiang Lang wanted to invite everyone to eat in the county, anyway, it was convenient to have a car, and it would take ten minutes to arrive, but Mr. Zhang refused: "Director Jiang, just eat it in the mine, Lao Meng Ke said that the big pot chicken I ate last time was good, let's eat that at noon." ”
"Alas, this is simple, it is the first time Mr. Zhang came, please feel a little uncomfortable, the big pot chicken is ordered by our Shuangquan Town. ”
"Time is tight, let's save time, we have to go back at night, and strive to come up with the design draft within a week, so as not to delay the construction before you freeze." ”
"Okay, let's go to the house and sit down and rest first, I'll order someone to deliver food." Jiang Lang let a few people into the office here, and asked Liu Xiaojuan to call the restaurant in the town and ask them to make a standard meal of 600 yuan.
"If you have any other ideas, Director Jiang will talk about it, let's record it, draw a sketch and try to come out around Wednesday or Thursday next year. After sitting down, Mr. Zhang said with a smile that he was in his forties and had been working in the coal industry for more than 20 years.
"Mr. Zhang, you have also seen that my conditions here are relatively simple, and I dare not say what it will be built in the future, but at least we have to meet the needs of our own development.
So, I think so, the freight yard you look at how to design can meet the needs of how to come, the rest of the first is the road when you come, I have found a road repair company, let them widen to 12 meters, build asphalt pavement, at that time I forgot to tell them about the installation of street lights, you help design the street lights, I will let them work together to ensure the lighting project of the entire mining area.
There is no need to apply to the State Power for electricity, our own mine can fully meet it, and there is a lot of rich electricity connected to the village.
Second, you can find a suitable place to design an office building that meets the needs of our mines, it doesn't matter if you are rich, in case it will be useful in the future. ”
"According to Mr. Jiang's description and the situation in your mine, based on our experience, there are four or five hundred people, how many workers do you plan to use?" Mr. Zhang nodded slightly.
"I don't know the details yet, or let's design it according to the office scale of 1,000 people, after all, we still have crude oil and natural gas. After finishing speaking, seeing Mr. Zhang nodding, Jiang Lang ran back to his desk and took out a typed organizational chart, and gave it to the other party when he came back, and continued:
"This is the organizational structure of Shuangquan Coal Mine that I imagined myself, because we don't need to go down the mine, so many departments don't have it, and only some basic department settings are retained. ”
This is Jiang Lang came up with in the last few nights, since the last time Meng Gong came, Jiang Lang has been thinking about the company's organizational structure, every night is to check the information, and to plan on the computer, and finally formed this organizational chart, to each department is responsible for what affairs.
The legal person and the general manager are Jiang Lang himself, and there is a deputy mine manager for safety production, and there is a production commissioning degree, in fact, the main thing is to be responsible for the mining of the control room and the operation to the freight yard. There is also a safety monitoring department, which is to check the safety of the whole mine, as well as quality inspection, etc., and the production control department is responsible for all monitoring, viewing, recording, etc., and notifying relevant personnel in time when problems are found.
There is a deputy mine manager of storage and transportation, and a coal storage and transportation department is responsible for the coal shipment in the freight yard, the management and commissioning of logistics vehicles, the scheduling and use of wheel loaders or special loaders for coal mines, weighing pipes, etc.;
And he is responsible for administrative support and sales, under the administrative office, mainly there are too many things that need to be reported, when the small coal mine is my own mother will do it, can not be a few to do it, I am afraid that at least a dozen people, as well as drivers, canteens, dormitories, warehouses and many other affairs have to be managed by the office, so a qualified office director, is still quite necessary.
Zhang Ying is in charge of the finance department, and the human resources department is newly established, which will be reviewed by the human resources department and distributed by the finance department.
Design the quantity department, statistics, record all kinds of data, and divide and summarize the report to the finance and office, and report to the outside world and to Jianglang after multi-party checking.
In the end, the sales department is mainly led by himself, recruiting a few people to assist him in doing a good job in sales, and the other links are not big problems, but only the sales situation Jiang Lang attaches great importance to it, after all, everyone in the whole factory has to count on their own food, and the sales work is not done well, it is a big problem.
"This organizational structure is very suitable for your mine, your mining is fully automatic and saves a lot of departments and manpower, that is, the superior comes to inspect and likes enterprises like you the most, at least the mining link is also the most important link in the mine No one participates, there is no possibility of accidents at all, and the bumps that occur in the open air outside are normal phenomena, not within the scope of safety production, so I just said that you have four or five hundred people is basically enough. ”
Hearing Zhang Linxiang say this, Jiang Lang also nodded with a smile: "Initially, I want to control the scale at about 500 people, and if I find that there are not enough people in the future, I will add them, but some key positions must be guaranteed." ”
The two deputy mine managers, Jiang Lang is prepared for the second and third uncles, let one of them be responsible for safety and production, and the other is responsible for storage and transportation, although their cultural level is not high, but no one is born with it, and after so many years, I believe that the third uncle and the second uncle also know what to do next, but it is really not possible to go to Qikuang Group to learn from the experience, and it is a big deal to pay for them to go out to study.
"Well, with this, you can design more intuitively, some locations still need to be marked, are you sure you are not going to participate in the logistics part?"
"Don't participate, all outsourced, we only do pits, crude oil, natural gas is the same, I want to find my own logistics companies to pull, don't forget it." "With the sci-fi mining equipment provided by the system, the indicators of the three products mined are the top, Jiang Lang naturally doesn't want to get any more logistics, if you want it, it's too expensive or too troublesome, anyway, there are already a lot of companies doing logistics, and there is no need to find trouble for yourself.