Chapter 26 General Contract

Chatting and chatting, Liu Xiaojuan said that the food had been delivered, Jiang Lang hurriedly invited a few people to go to the canteen together, there is a small room there is specially used to entertain guests to eat, which was specially arranged before the Jianglang Festival.

Called the second uncle, the third uncle, and Zhang Ying together, everyone had a happy lunch at noon, and the wine was not too much, 11 people drank three catties of five grains, Jiang Lang still had several boxes at home, and he moved two boxes when he came this morning.

At the wine table, the second and third uncles who were called over knew how much power Jiang Lang wanted to give himself, although they still worked for Jiang Lang as before, but everyone had to be responsible for one aspect of the work in the future, and their subordinates were in charge of hundreds of people, which suddenly made them feel a little drumming in their hearts, and they didn't know if they could do a good job.

Although they knew that they would definitely do a big job after knowing the production capacity of the equipment before, and Jiang Lang would definitely not treat themselves badly, they didn't expect Jiang Lang to suddenly raise himself to the level of deputy mine manager.

It's easy to say that the mine is small, but it's really not an ordinary difficulty when it's big, especially from scratch, the key is that everyone has no experience, but now there are guests, and neither of them said anything else, so they are ready to have a good chat with Jiang Lang in the evening.

In the afternoon, according to the existing drawings and what Jiang Lang said, Zhang Linxiang's assistant drew all the maps of the coal mine and freight yard after the visit, as well as the preliminary identification of where to place something in the future, especially the sketch of the design of Shunda Mining Machinery has been changed to a great extent.

First of all, a set of large elevation angle mine transportation machinery is no problem, but to the freight yard to switch, according to the quality of coal in Shuangquan Coal Mine to calculate, can not exceed 15 meters, and then the height is easy to cause fire, 15 meters of height, with a daily mining capacity of 30,000 tons, that is, 5 days to reach 150,000 tons to switch the place to another accumulation, from the original accumulation point, changed to three, plus a spare, a total of four coal accumulation points, so that the turnover can be opened, as long as the logistics can keep up, basically can ensure that the equipment is mined all year round。

Zhang Linxiang and they don't understand how to set up crude oil and natural gas, so it is enough to set aside about one-third of the coal area, even if it is transported by hundreds or thousands of vehicles every day.

Because the road has also been re-planned, the 12-meter-wide existing road is a little too crowded for thousands of trucks, and the most important thing is to ensure the travel and safety of the villagers, so Mr. Zhang gave two plans.

One is that all the trucks only come in from the existing road, and build a road of the same width from the east side of the freight yard to the provincial road, the distance is not long, and it is a little farther there, because it needs to be built about six or seven kilometers long to bypass a mountain, and the land is not all from Shuangquan Village, as well as from Mengjiazhuang next door.

The second plan is to directly widen the existing 12-meter road scheme to 26 meters, set up as a two-way four-lane, and draw out an eight-meter width near the west side for villagers and other vehicles, and the 18-meter road on the east side is a special road for trucks, so that the safety of pedestrians and the safety of other vehicles can be guaranteed, and the normal operation of the freight yard will not be affected.

After all, Jianglang's mine not only has coal, but also the same amount of crude oil and natural gas, and if there are no such two, it is no problem for trucks to even smooth the gravel road.

"That's the second widening to 26 meters, most of the land in our village, only near the provincial highway there is a little Zhangzhuang Village. The third uncle, who also participated in the afternoon discussion, smoked a cigarette and said with a smile.

"I'm not worried about building roads, even if it's just flat and compacted trucks, it's no problem, but there are oil and gas transport vehicles to be standardized, according to the secondary provincial road standards that Mr. Jiang said, that's 20 million per kilometer, I'm worried about whether the financial resources of Director Jiang can support it, and this road alone does not have a hundred million can not come down." Zhang Linxiang said with a smile.

"Ah, it's so expensive to build roads? Jiang Lang, why don't you find the county and let the county pay for it. When the second uncle heard that it was 20 million for one kilometer, he was suddenly a little startled, and hurriedly said to Jiang Lang.

Jiang Lang smiled and shook his head: "Second uncle, I don't know if I can fix it in the county, I don't know if I have the money, I have the money." ”

"Loan?" The third uncle frowned, although he had known for a long time that with such a large output, the mine would definitely make money in the future, but Jiang Lang had already borrowed 12 billion yuan to buy equipment, which was to buy land and build roads, and he felt that the investment was too great, at least they didn't have the courage, what if they didn't pay it in the future?

"Well, I borrowed hundreds of millions more, and Mr. Zhang doesn't have to think about money, as long as he designs it according to standardization. Jiang Lang smiled, but he was not worried about future profitability at all, anyway, with the support of the system, he was so confident.

"I can see that Jiang is always really courageous, I have never seen a young man like you who dares to think and dare to do, and today I can be regarded as a long insight.

Then you have to find professionals to design the rest of the crude oil part, the office building is still on the west side of this equipment, just in time for personnel to enter and exit this 8-meter-wide road, and the truck does not interfere with each other, and you have such a large area on the hillside, it is too wasteful if it is empty, but now this house has to be stripped off. ”

"Okay, I'm okay with this plan, these broken houses are not much use now, just right. As long as we don't build a house under our feet, there is an oil pipeline underneath, but it is not a big problem to build a bungalow or a two-story building, the pipeline is 1.5 meters above the ground. ”

The office building is better placed on the west side of the equipment, closer to the road, more than 300 acres of land, minus the 100 acres occupied by the equipment, plus the piece under their feet now, there are about 100 acres of office land, office, canteen or something is enough.

"Don't build anything, in the future, if it breaks, you can't repair it, but it can be planned as a second parking lot, this doesn't need to be repaired, and it's still quite flat."

Director Jiang, there are still quite a lot of things to do in a mine from design to construction, and we also have general contracting experience, Zhaolou Coal Mine, Qi Mining Group No. 3 Mine and many other coal mines are designed and constructed by us, do you want to contract it to us too?" Zhang Linxiang asked with a smile.

"Great, I'm worried that it's too troublesome and too messy to find a company, since you have general contracting experience, then I plan to contract this project to you, but I have found a good county Datong Highway Company, Shunda Mining Machinery Company, you have to continue to use, I have paid them 10 million in advance to prepare materials, and the rest of the construction companies you can find the right one yourself.

My requirement is to have excellent quality and fast speed, and strive to let us officially put into production on New Year's Day.

By the way, can you provide training services? Let us train the newly recruited personnel in the mine, especially my second uncle and third uncle, the two mine managers, who will not be able to do without training. ”