Chapter 133 Pipeline Formal Oil Supply
At present, there is no commodity exchange for non-ferrous metals in China, and even the futures commodity trading of coking coal will not be able to appear in the Dalian Commodity Exchange until 13 years, but this year Qidong Energy has been invited to participate in the Northeast Asia Summer Coal Fair, which will be held in Dalian in early July.
Originally, Jiang Lang was not very active in wanting to participate, but the National Coal Association personally called, Jiang Xiaodong agreed, then Jiang Lang had to go to see, after knowing that Qidong Energy signed out 20 million tons of anthracite, the Coal Association quickly called Jiang Xiaodong, so that the coal of Longwa Mine should not be sold again, anthracite is a hot commodity at the Northeast Asia Summer Coal Fair, and the remaining 80 million tons will definitely be sold out, let them wait, Jiang Lang originally wanted to participate in the coal trade fair in the province in the autumn, but people actively invited, Jiang Lang could only agree to go there to trade。
Compared with the occasional copper products, coal is the main business of Qidong Energy, and hundreds of millions of tons of anthracite in Longwa Mine is indeed a sought-after commodity in the world, otherwise he would not have chosen to produce anthracite, anthracite is not worried about selling in this period, especially the good quality and quantity of anthracite, some enterprises rush to want, nothing more than price and quantity, and Qidong Energy's mining cost is actually extremely low, not with anyone to fight a price war.
In the afternoon, Wang Wei called the General Management Department, and then Qidong Energy invited China Railway and Provincial Coal Logistics to send a logistics quotation invitation.
Originally, Jiang Lang basically only cooperated with the provincial coal logistics company, but with the diversification of Qidong energy products, as well as 20 million tons of coal in Shuangquan Mine, plus 20 million tons of coal in Baizhuang Mine, the provincial coal logistics company did not have so much power at all, and fortunately, the coking coal of Shuangquan Mine will not start to increase production until the end of the year, otherwise Xu Tao, the boss, will have to cry, there are really not so many cars, and now the provincial coal logistics company has found a lot of private coal trucks.
Therefore, although Qidong Energy invited them to copper, it excluded them in its heart, and preferred that all Baizhuang mines use China Railway Logistics.
Copper is relatively high, although many large iron and steel companies also have their own logistics companies, but they do not have much capacity to undertake the transportation capacity of Baizhuang mine, even if it is a 40-ton truck, it needs 250 trucks a day to transport, not to mention thousands of kilometers may not know where there will be a problem.
On the 28th, 2 logistics companies for Qidong Energy's 300,000 tons of copper per month, from Baizhuang mine to Jiangtong logistics project to quote, Jiang Lang, Wang Wei in the logistics mode, capacity guarantee, company strength, price and other aspects of a detailed inspection, discussed or gave this order to China Railway Logistics, their quotation is also the lowest, only 0.15 yuan per ton kilometer, and Jiangtong plant on the train. The provincial coal logistics kilometer is still reported as 0.2 yuan ton kilometer, calculated according to 1,000 kilometers, and the freight difference is 500,000 per day.
Compared with other logistics companies, China Railway Logistics is more convenient, safe, cheap, less affected by the weather, they have their own branch in Zaocheng, and they belong to the railway system, three to four freight trains will be issued for Qidong Energy Security every day, calculated with 60 tons of carriages, Baizhuang Mine can be filled with three or four trips per day is not a problem, and the coal of Baizhuang Mine was also signed to them to transport.
Baizhuang Mine has signed a railway construction agreement with the Quandu Railway Bureau, and the Baizhuang Mine Railway will be completed and opened to traffic before the end of the year, so Baizhuang Mine will be able to directly use the railway on its own mine to send coal and copper next year, and there is no need to transfer at all, and even dozens of freight trains will be sent out every day.
Compared with the train, the long-distance transportation of the car is indeed not advantageous, from the Baizhuang mine to Jiangtong to take the high-speed about 1000 kilometers, but the same you take the high-speed freight can go up, the high-speed toll per kilometer a few cents to a piece more, even if the wealthy Qidong energy is willing, but the safety factor is not safer than the train after all.
On the 29th, the oil pipeline from Shuangquan Mine to Great Wall Petrochemical officially began trial operation, Jiang Lang arrived at Shuangquan Mine early in the morning, and the crude oil produced from No. 1 equipment directly entered three huge oil tanks after the caliber was changed, and then entered the metering device after coming out of the oil tank, pressurized by the oil pump, and continuously delivered oil to the Great Wall Petrochemical through the oil pipeline, and a large number of oil tanks were not built in the Shuangquan Mine, but at the end of the Great Wall Petrochemical at the end.
The whole process is not complicated, the crude oil output port of the No. 2 equipment is also being converted according to the design drawings, but also fortunately, the land purchased by Jiang Lang is large enough, and seven more 100,000-ton oil tanks will be added to the oil and gas storage area in the future, otherwise the pressure on the crude oil reserves of the Great Wall Petrochemical is too great, and the land of the Shuangquan Mine is large enough, so the reserves here can only be slightly larger, Li Xingyuan is responsible for the construction of the second phase of the project, so after he proposed it, under the condition of confirming the safety, Jiang Lang agreed to this plan, anyway, the crude oil of the entire Shuangquan Mine is supplied to the Great Wall Petrochemical。
"Mr. Jiang, everything is ready, please come to work in person. Jiang Xiaoyan said happily.
"Third uncle, you are the mine manager of Shuangquan Mine, you come. Jiang Lang smiled and gave this glorious moment to the third uncle, Jiang Lang didn't care about this kind of face-saving matter.
"Xiao Lang, it's better for you to come. ”
"Third uncle, you're welcome, Mr. Zhao and they are still waiting. Jiang Lang smiled and pushed the third uncle.
Under the gaze of dozens of people, under the filming of several cameras and cameras, the third uncle Jiang Huailiang personally turned the switch of the main valve, and then heard the sound of flowing in the oil pipeline, and then the employees of the crude oil and natural gas department turned on the switch in the pump room to officially supply oil to Great Wall Petrochemical.
This is a historic moment, marking that after eight months of almost 24-hour construction, Qidong Energy's first mining area officially supplied oil to the outside world, and it is also a pipeline with high safety performance and no weather conditions, with a daily output of 10,000 tons of crude oil, which can bring about 650 million yuan per week to Shuangquan Mine at current prices.
Qidong Energy is now counting on the Shuangquan Mine to live, because only the Shuangquan Mine is really produced and sold, and the Baizhuang Mine is still under construction, even if it is crude oil and coal, it is only recently sold to SK Group on May 18 and 27 while being built, and this week has settled more than 600 million yuan of last week's payment, but fortunately, the future prospects are huge and broad, and Qidong Energy's cash flow will start to explode from next month.