Chapter 077 Leave slip that moved me to tears

Foreword: This is a leave slip that moved colleagues to tears.

I woke up in the middle of the night, suddenly semi-paralyzed, only my neck and one hand could barely move, I spent nearly three hours of hard work, little by little to the head of the bed, difficult to open the door of the rental room only two and a half feet away from the head of the bed, waiting for the rescue of colleagues after dawn, just waiting for a few hours of dawn, I also struggled to find out the ballpoint pen and simple notebook in my pocket, and wrote this 10-page leave note in the palm of my hand with even more difficulty.

For work, I never forget, every bit is in my heart, and I can't say enough about it, this is me nine years ago.

Today, 9 years later, I am almost demoted back to the property management department to work as an employee and receive the most guaranteed salary. When I came out of property management 12 years ago, I was already a squad leader, and looking back, I was already flat-headed.

Regardless of why, whether it is "Water Is Not Warm Moon" or the 20-year deadline, it is just an excuse.

This is an ominous leave note, the deputy manager who approved my leave note back then, he, her, and her who acted on my behalf, the little ghost who returned the leave note to me, and the team leader and his wife with the leave slip, all resigned! Several of them were forced to leave. Now it's my turn to write a fake note, of course, it won't end well......

I'm about to take office, today, I packed up my drawer, and when I saw this fake note again, I still remember that when the little ghost handed it back to me, there were still tears.

Only now do I understand that she is not crying about my past, but crying about my present......

?Body.

Submit****:

In the past 8 years, only ask for leave to go home once, when this quick dismantling material parts are in great difficulty, but should not be evacuated, but unfortunately unable to do so, has not been able to enter the company's door, this is to ask for leave from medicine, please first ask for a week off on my behalf, and then determine whether to extend the leave, if then paralyzed, I will stop by myself.

If I can invite the blessings of heaven, I hope to enjoy your love again as soon as possible and face it side by side......

Below, I will record the recent highlights of my work as follows, please arrange for the agent to pay attention.

A.After my computer is turned on, when it displays white English, it will stop opening the program, and you can hit the enter key twice in a row. My personal password, Mr. Li, Ah Fang and A Qin know, after entering, there is a second decoding, the password is ******** to enter my personal file operation, there are several jobs, must be operated in this: quick release order scheduling requirements, performance bonuses, efficiency accounting, assembly output curve charts, etc.

B. Jian yì arranged my work as an agent as follows:

1). The relevant personnel of the company can extend the number of overtime hours by 1H~2H every day.

2). Build yì Li Sheng agent quick dismantling preparation, by the little ghost for the order, May 26 before the demand has been written to Zhou Sheng, only owed aluminum handle is not written. Aluminum handle production first catch up with no standard 30000 (including yesterday) need to divide the electric yang no standard about 100KG, yang black no standard 40KG; yang black standard 200KG; May 26 reserve materials need **** customers pay attention to the beginning of the next month of the flat black no standard, May 22 aluminum hand wool needs to enter, that is, must arrange aluminum hand night shift punching and punching. The quick-release assembly production has been scheduled to the 23rd, and part of the pre-delivery date has been arranged on the 26th.

3). Jade charge, waterproof cover, nut, washer, FN, safety hook and other parts built by the agent. Among them, jade charges, nuts, casings, most of the washers, and only double flowers are not checked. I have written the material requirements table this week, in my personal file, look for the 'form form table - demand table - blank demand table' to open, organize the format, print it, note that the citation mark is red, not the green part. ONE OF THE SPECIAL ATTENTION IS THAT THE NUT 14X23.5X5 IS AIRLIFTED AFTER THE TRACKING'S 1200PCS IS TURNED INTO 4.5 ELECTRIC BK, AND THE REST CAN BE USED UNTIL 26 DAYS AFTER PHOSPHATING. Yesterday, after the 40,000 of JEISENY loading was in place around the 22nd, it must be phosphated immediately. 5/16X14X16.5 with a cap with urging to purchase ****;May 22 must enter M14 jade more than 20,000, the old car, has been entrusted with the outer part of the 11.3mm jade charge, must have 8,000PCS. After the demand form is printed, it will be given to Zhou Sheng.

4). CT dispatch and parts tracking, built yì by Zhou Sheng, this week still owes next week's orders have not been sorted out, owes 175mm core phosphate 300PCS, owes CP hub 36H.28H a small amount. It should be noted that at the beginning of next month, **** order 11500PCS, it is best to be able to ship all on June 3, should be arranged in advance in the tube, driving rotation, brake pads, taper, etc., CT blades have iron plates, CT washer to electricity 10000 phosphating, etc. This month, the 26T brake cone is more prolific, and the old type of detaper in stock can be arranged to be turned, and the old type of middle pipe is digested first.

5). Wen jiàn drawing surface construction yì**** bothered agent, I still have three unfiled on the desktop. In addition, please negotiate the efficiency accounting to be helped by ****, if it doesn't work, you have to trouble the ghost. The location is in my personal document - performance data - performance accounting - 2005 - May - password entry, after opening in the index marked as a schedule, enter the output and working hours of each unit in the corresponding space. Be careful not to break the formulas already set in the storage compartment, otherwise it will be difficult to fix (I have thousands of different formulas in this document, which are applied to each other, and no one else in the company can figure it out). After the daily input is completed, it should be saved to the public file to submit the manager-performance data-2005-May performance. Note: There are still 'Output', 'Accounting Table', 'Summary Table', 'Description', etc. on the loose page of performance accounting, which cannot be changed.

Remember to fill out the performance dashboard every day.

Save the 'blank accounting table' in the folder to a new file and rename it as the June performance accounting table, and then you can calculate the June month.

6). April end bonus please by Zhou Sheng to help complete, the information in my basket of red dossier, others have been calculated, only the quality of the transfer of sales and customer complaints deduction, please calculate the four parts of the deduction: 1. is the return and customer complaints; 2. tools; 3. mixed deductions, which are not enough, to the quality of the department to deal with themselves. 4. Last month, the part was extended, and the location was in my document - performance information - performance overview - March 2005, open the query - Lu Jie, the performance bonus accounting system, in my personal file, the above annoyance Mr. Li mentioned.

C. The materials I am responsible for are detailed in my documents and can be consulted.

These words were written by me lying in the palm of my hand, and I am not clear because my hands are weak, please forgive me. The work that has not been explained cannot be exhausted.

If I don't have limb disease, **** can replace me, and I want to add a new person, and there is one or can enter, ****'s wife, there is a little foundation.

Sick in bed, worried about unfinished work, I stayed up all night, and at dawn I saw that my body was difficult to hope for early death, so I wrote these things, which is also my own explanation.

Sincerely

Good morning!

So-and-so

May 21, 2005 at 6:00 AM