Chapter 120: The first machine of the old tree and the new factory

According to the old workers, there are several old items hidden in the Yangfan factory: bricks, ginkgo biloba and old wells.

When the auto repair plant was first established, the daily output of the Langya brick factory was in short supply, which could not meet the demand of the city at all. Although the auto repair shop has an approval slip, no one can do anything if there is no goods. Wu Aiguo, the director of the factory, begged his father to tell his grandmother, and finally begged for a lot of bricks from the Langya City Brick Burning Factory, but there were still some gaps in the construction.

So Wu Aiguo mobilized his employees to pick up a lot of bricks from the old city wall, and by the way, some tomb bricks that no one wanted were also brought back.

There are three ginkgo trees, two of which are at the gate of the factory, and only the name of the person in charge of the apportionment is hung on the tree, and there is no other information. Yang Quan remembers visiting other people's homes when he was a child, and heard that the tree was nearly 100 years old.

Later, the city developed and the sanitation gave a sign showing that these ginkgo trees were planted in 1899. Needless to say, it was also moved when the factory was built.

Yang Quan only remembers being born in this yard, and he has remembered that there are three ginkgo trees, two inside the factory and one outside the factory.

The two trees in the factory, one male and one female, the male does not bear fruit, and the mother bears fruit, and in the autumn of his childhood, he carried a basket to the bottom of the tree to harvest ginkgo fruits.

Another tree is across the dormitory building to the south, not far from the old well.

When the factory was first built, it was also the site of the factory. A few trees in the factory, facing the south and west of the office building, are neither windy nor light, and they look aggrieved and look very average. And the one on the north side grew in the open field, there was no shelter around, it was much taller and thicker than them, and it stood in the sunlight like a beautiful man, golden and dazzling.

And this beautiful man will witness a new story of this land today, and a new friend will appear not far from it.

At 10 o'clock in the morning, from the first medium-sized truck Dongfeng EQ140 to be sent to the factory, the entire new Yangfan engine plant was as busy as a construction site.

The non-stop busyness of the EQ140 only caused children to cheer on the sidelines, while the adults rushed to unload various equipment and sent it to the workshop to wait for installation and commissioning. No one paid attention to these medium-duty trucks, which were finalized by the state in 1975 and officially put into production in 1978.

As a domestic classic truck that has been selling well for decades, Dongfeng EQ140 is believed to be a medium-sized truck that many drivers have been in contact with since they learned their driver's license. However, when it went into production, the EQ140 was not what we see it now, but the same appearance as the EQ240 military vehicle.

According to historical understanding, the EQ140 did not have its own new cab when it was first produced, and could only temporarily install the cab of the 240. The yield is very small.

Later, the 140's own cab was produced, and it was soon loaded in large quantities, which is the well-known two-pane-glass version of the EQ140.

Starting from the port, the containers loaded with these medium-sized trucks and the rest of the heavy trucks have traveled a long way to the Yangfan factory after a day's journey, and these imported equipment are the machine tools and equipment that Yang Quan bought back from the bank loan.

Now the trucks parked at the back door of the factory are surrounded by employees who are sticking their heads and watching, and forklifts are carefully cooperating with cranes and lifts to rest these tight equipment. These machines will be temporarily parked in a corner of the factory and the rest of the equipment purchased from China, waiting for further installation and commissioning.

The site has now reserved the position of these imported machine tools, and some of the punches bought from domestic equipment factories have been debugged.

Yangfan Factory also inspected many domestic equipment factories, similar to Jinling No. 2 Machine Tool Factory are providers. Although the product performance is average, but can not bear the price concessions plus geographical location and human reasons, Yang Quan also purchased two ordinary lathes from Jinling No. 2 Machine Tool Factory.

When the last machine was safely unloaded, Yang Quan took the technical team to accompany the professionals to participate in the installation and commissioning of the production line. From the horizontal multi-tool semi-automatic lathe whose productivity is 3~5 times higher than that of ordinary lathes for processing discs, rings and shafts, to imported CNC CNC milling machines with stable processing quality, high machining accuracy and high repeatability.

Several teams in the group are responsible for different equipment, and each team works overtime to debug under the guidance of the manufacturer after ensuring that the equipment is correctly understood. In order to earn the high subsidy of Yangfan Factory, the technical staff of the manufacturer also stared at the red eyes and continued to struggle.

After three consecutive days of overtime, a rigid and flexible production line with a guaranteed annual guarantee of 30,000 yuan was preliminarily commissioned. The production line can ensure the switching of 70CC and 125CC production, and can also be adjusted to a certain extent with the later investment of new products.

After the commissioning was completed, production did not start immediately, and some new equipment had never been seen before for the employees of Yangfan Factory, and these sudden start-ups may cause damage to the equipment. Although we have organized theoretical knowledge training for employees before, it is based on theory, not practice.

The operation on paper has to cooperate with the actual on-site guidance to ensure the normal operation of the equipment, and Yang Quan understands that for the quality and safety of later production, these trainings are indispensable.

Yang Quan does not require the creation of a new Langya speed, as long as the equipment is complete, the product quality is qualified, and the safety of employees is the greatest satisfaction.

Over the next few days of training, prototypes of the machine were continuously made, and each employee got his hands on the machine he was responsible for dozens of times. Samples are constantly being produced and then taken to test the size, and it can be seen from the sample boxes piled up in the quality department that each machine has at least dozens of products off the assembly line in the past few days.

"Good morning everyone, today is the first day of production, and I hope everyone will show the state of their previous training and start the first step perfectly. Do you have confidence?" Luo Daodao shouted at the morning meeting in the workshop.

"Yes" thick and thin male and female voices mixed neatly back.

"Okay, according to the previous assignment, go online and prepare. Luo Daodao closed the notebook and waved his hand to move immediately. On the production line, male and female employees walked to the machine they were responsible for, and with the sound of the assembly line turning on the current, the whole factory seemed to be under the control of an invisible hand.

"If there is a problem, remember to report it in time!" Luo Daodao and his entourage of emergency guarantee teams walked back and forth in the green walking line, in order to respond to sudden failures in a timely manner, they had to be stationed here every day today to prevent the line from stopping.

Soon, with the completion of the production of one piece of equipment processing, the products are placed on the assembly line and quietly transported to the general assembly area, during which several inspectors stand on the water flow line to check each product through the inspection fixture before the general assembly area. These inspectors have the authority to stop the assembly line, and they are responsible for each product, both visually and with the help of equipment and tools.

"The product is visually free of scars and burrs"

"Size Qualified, Next Step"

After ensuring that the dimensions are correct, the products are quickly transferred to the assembly line, where skilled workers assemble the whole machine. The U-shaped assembly line is set according to the size of the site and the process, and each person in the assembly area is responsible for the assembly of one to several parts, after which the parts will be summarized to the next step until completion.

"Correct air tightness, next step"

"Ventilatory Resistance Test Correct, Next Step"

……

Yang Quan and the person in charge of the quality department stood in front of the last assembly process, waiting for the first engine to be officially assembled. Finally, the person in charge of quality stands on the testing equipment for special testing.

"Ignition test begins"

"The ignition is normal, the data indicators are normal, and it is qualified!" The person in charge connected the equipment line, and after a burst of ignition, he was immediately judged to be qualified by the experienced quality control.

For them, the sound of the engine running is the language of their communication, and they can judge whether the engine is qualified by looking, hearing, listening and listening.

The first engine was moved to the trolley, and the name of the new factory hall was knocked down, where there was a photographer waiting to take pictures, and the engine with batch number ZY-70-19881011001 will be sealed in the hall for visitors to visit.