Chapter Seventy-One: Take it as long as you make money
"Village Chief Chu, don't worry about this, for the damaged road, our work team will consider it at its discretion and give a certain amount of compensation. Pen ~ fun ~ pavilion www.biquge.info" Yu Qing smiled.
There is no objection to this question, after all, the village road belongs to the whole village, ordinary cars pass by the village road, people can't intercept you, construction machinery and vehicles want to pass through the village cement road, you must pay the corresponding road wear and tear fee.
"Of course, if after the road is damaged, the leader of the Yu Gong squad helps our village to renovate it, I also agree. "The Chu River channel.
In Chujianghe's view, the real road to be rolled is the road between Chujiang Town and the mixing plant, for the road from the mixing plant to the construction site, only need to open a road from the east side of the mixing plant to the west side of Chujia Village, and then the concrete tanker will go directly to the railway construction site from this road, so as to reduce the rolling of the road surface.
"Village Chief Chu, it's not too late for us to discuss this matter in the future, after all, this railway can't be built in three or two days. Yu said.
Chu Jianghe nodded slightly, feeling that what Yu Qing said was also reasonable, it was still a little early to talk about the issue of village road tolls, and then asked: "Squad leader Yu, are your mixing conveyors all purchased by the Railway Bureau itself?"
Since there is a mixing plant, it is obvious that there can be no shortage of concrete transport trucks.
For the mixer truck (also called concrete concrete truck, tanker), Chu Jianghe is still more understanding, the development of domestic concrete mixer truck began in 1966, when the East China Construction Machinery Factory and Changsha Construction Machinery Institute cooperated to develop the JC2 type mixer truck.
The car is based on 8t Yellow River brand car chassis, mixing drum capacity of 5.7 square meters, is the first self-designed mixer truck in China, in 1969, it began mass production.
From the early 80s of the 20th century, a large influx of foreign concrete machinery, the domestic machinery industry, has had a major impact, coupled with the continuous spread of reform and opening up, the domestic machinery manufacturing industry, and gradually appeared with foreign joint ventures.
In 1982 and 1983, China introduced the manufacturing technology of related mixer trucks from Japan.
In the construction of railways, since 1975, mixer trucks have gradually entered, which has greatly accelerated the speed of construction.
However, even in 1984, it was not fully popularized, and many dangerous railway constructions were still dominated by manpower, and most of the construction machinery could not be used at all, so they could only use trolleys.
"Yes, our Chutan Railway Bureau Materials and Equipment Company has imported several mixer trucks and is going to transport two of them. Yu said.
Even the Chutan Railway Bureau does not have many imported large concrete trucks, and it is not easy to get two.
However, with Chu Jianghe's understanding of construction machinery, two concrete trucks are far from enough!
"Yu Gong squad leader, there is a sentence I don't know whether to say or not. Chu Jianghe was silent for a moment and said.
"Please. ”
"I also know a little about mixer trucks, and now imported mixer trucks can load more concrete, there is no doubt about this, but do you think our roads are really suitable for using such a large mixer truck?" Chu Jianghe asked.
The cement road in Chujia Village is very fast, there are four meters and five, in this era it is already a big cement road, there is no problem with this kind of large concrete transport truck, but there is no problem in Chujia Village, it does not mean that there is no problem with the section from Chutan City to Chujiang Town, even if the transport truck arrives in Chujia Village, with the road of Chujiang Town up and down the mountain, the large concrete transport truck may not be suitable.
And in Chu Jianghe's view, two concrete trucks are not enough, if it is poured with a pump truck, at least four or more are needed, and if the distance is more than ten kilometers, there are no more than six, which is completely insufficient, otherwise, the supply of concrete can not keep up at all, once something is delayed on the road, it is normal for the pump truck to block the pipe.
Yu Qing and Song Jing glanced at each other, and Song Jing spoke, "Village Chief Chu, I don't know what suggestions you have?"
Since Chu Jianghe mentioned it like this, he must have his thoughts, otherwise what kind of business would he have to do?
"I think we can make a deal between us. Chu Jianghe said with a smile.
This time, even Yu Qing was a little stunned, not knowing what Chu Jianghe meant, and asked, "I don't know what deal Village Chief Chu is going to make?"
"It's very simple, the construction of the concrete batching plant is all built by your work class, and I want to contract the operation and transportation of the batching plant. "The Chu River channel.
The reason why Chu Jianghe did not say that he wanted to contract the construction of a mixing plant was mainly because the cost of building a mixing plant was not low, Chu Jianghe did not have such a big appetite and could not eat this piece of fat, in addition, whether Yu Qing was willing to build it for him was another matter.
In this case, Chu Jianghe simply did not want the right to build the mixing plant, but changed it to operation and transportation, and contracted the transportation of concrete.
Usually, after the construction unit builds the mixing plant, it will contract the operation of the mixing plant and the transportation of concrete to some local people to transport, and the local people are responsible for purchasing tankers and opening up the relationship between each transportation road, all of which are done by the locals.
And how much money is given to this contractor for each square of concrete by the construction unit to reach such a contract.
The advantage of this model is that the people who can contract this work generally have a relatively wide network in the local area, plus they are locals, and when the concrete trucks pass through some villages and roads, they come forward to negotiate, and the villagers in those villages dare not blackmail these contractors.
Even if it is blackmail, you have to contract the boss to give it!
The construction unit completely put this piece aside and reduced the coordination fee in this regard, perhaps the coordination fee was not reduced, but this part of the coordination fee was given to the contractor of concrete transportation, so that the other party could coordinate things.
In this way, the construction unit only needs to do the construction on the construction site, and for concrete, as long as a phone call and a notice, the other party will send it out, and there is no need to worry about it at all.
Obviously, the construction company has less trouble and may spend less, so why not?
However, at this time in the eighty-fourth year, this model was not implemented at all, and there was not even a work class to try, as soon as Chu Jianghe's words came out, Yu Qing was shocked, and he couldn't understand this kind of thing for a while.
"Village Chief Chu, I don't quite understand what you mean by this package. After a long time, Yu Qing spoke.
"I will buy the mixing plant transport truck, and I will arrange people to mix the construction, management and operation of the concrete, you only need to arrange one or two people to supervise the mixing plant, and finally how much processing and transportation fees each of you give me, and then what local problems in the concrete transportation encountered in each village, I don't need your work class to come forward, I will solve it myself, and reduce the trouble for you." And as long as you promise to let me contract, like the toll in Chujia Village, I can consider reducing it for you, and I will pay for the other part, these are all okay. "The Chu River channel.
Chu Jianghe explained this way to let the other party know that everything he did was beneficial to the other party and to reduce trouble for the other party, after all, with the progress of reform and opening up, people's minds have gradually opened up, and the people have become more and more difficult to deal with.
You drive a transport truck through other people's land, once you run it over, people blackmail you, you can't help it, you don't give it, people will go to your construction site, see what you do?
But if these are contracted by Chu Jianghe, and his transport truck runs over the land of the common people, Chu Jianghe wants to see, within the scope of Chujiang Town, who dares to blackmail himself?
Unless you don't want to live anymore!
Yu Qing and Song Jing glanced at each other again, obviously, Chu Jianghe's suggestion was too novel, and they couldn't accept it for a while.
"Village Chief Chu, I haven't touched this kind of thing yet, why don't you wait for me to go back and discuss it, and then give you news?" Yu Qing said.
Yu Qing vaguely felt that this was indeed a good attention, but even if it was the foreman of the work class, Yu Qing did not dare to make the decision rashly, and he had to report to the upper leaders of the Railway Bureau to make a decision for the first time like this.
Chu Jianghe also understood Yu Qing's words, nodded and said: "Of course, I'm just a proposal, whether the squad leader Yu agrees or not, it won't get in the way, of course, if this agreement can be reached, it's the best." ”
At the beginning, Chu Jianghe originally wanted to only have the right to transport, but after thinking about it, he simply put forward the right to operate and let the other party choose, if the right to operate is also coming, it will be better for Chu Jianghe.
"Village Chief Chu, let's postpone this matter, why don't we go and see the construction site of the mixing plant we have selected now?" Yu Qing suggested.
Yu Qing came this time just for the mixing station, for what Chu Jianghe just proposed, many of them were unexpected by Yu Qing, and vaguely, Yu Qing felt that Chu Jianghe was young, but he had a lot of ideas, and many of the ideas were very novel, so that Yu Qing couldn't make a decision for a while.
"Absolutely. "The Chu River channel.
Chu Jianghe followed Yu Qing and Song Jing out of the room, only to hear a 'boom', another explosion, during this time, the sound of explosions can often be heard during the day, and the villagers are used to it.
The place where Yu Qing chose to build the mixing plant is less than 300 meters away from the quarry in Chujianghe, and on the east side of the quarry, just on the other side of the blasting, about 700 meters away from the mining and blasting place.
"Village Chief Chu, just that piece of land. Yu Qing pointed ahead.
Chu Jianghe took a look, this place happened to be the easternmost side of Chujia Village, and two hundred meters past it, it was the territory of Maxiu Village.
"How much area are you going to have. Chu Jianghe asked.
"At least about 20,000 square meters. Song Jing thought for a while.
20,000 square meters, that is, 200 meters in length and width, used to build a mixing plant, not too big or small, you must know that there are several silos, first uninspected raw materials, then inspected raw materials, as well as sand, gravel and cement, all of which must be separated, in addition to a series of things such as workers' dormitories and restaurants, but these can be replaced by simple board houses.