Chapter 165: Cement Factory
The design of the cement plant is relatively reasonable, the terrain is rectangular, about 500 meters long, 30 meters wide, and the total area is about 1.5 hectares.
Enter the door from the right-hand side, the gate is about ten meters wide, followed by the slope road made of stone, the whole is about seven meters higher than the road below, the slope has exceeded the position of the gate, and below it is (crusher), and in the inside of the slope, there is a small tile house, which is used as an office location, which is the place where the incoming materials are counted.
The cement plant has zero raw meal inventory, so the raw meal that needs to be crushed will be crushed at the first time, and then stored after crushing, or calcined directly, which will reduce the labor force for loading and unloading. For example, as soon as the limestone is pulled into the cement plant, it needs to be weighed and counted, and then it is queued up to wait until the truck of limestone is poured from the top of the slope into the crusher inlet, then the delivery is completed.
This means that the raw meal that needs to be crushed will not enter the cement plant before it is crushed.
In this place, two personnel will be arranged to follow up, a worker will take care of the site, and a statistician will conduct data statistics.
The canteen is temporarily built outside the gate in the direction of the coal plant, and now it is already starting to build tiles, and it will be completed tomorrow on the 31st at the latest, although it is only a one-story brick house, but the canteen is relatively large, and can accommodate 200 people sitting and eating at the same time.
The tiled house is all based on the beams of large wood, and then there are small vertical stalks, both horizontal and vertical, and finally the tiles are covered on the top OK, and the design below is that the innermost is the kitchen. There will be a row of countertops. It is designed as a window for cooking. Miscellaneous people are not allowed to enter. The outside area is the place to eat, and he ordered a large number of tables, chairs and benches in the commune, and in terms of wood, he took advantage of the state, which was basically equal to zero cost, but he paid some labor costs for planting trees.
Of course, the carpenter's salary had to be settled, and it was handled by Carpenter Jiang, an old acquaintance of Jiaoshan Commune, who was also in charge, and a large number of doors and windows were also needed. The carpenters of the rest of the communes also got orders.
As soon as the funds are in place the day after tomorrow, the money will be sent out immediately, the equipment will be pulled back, debugged and installed, and strive to be officially put into production before the fifth day.
Time is tight, not only the equipment, but also the rest of the buildings are also competing for time, and there is a relatively large cistern behind the canteen, designed at a high place, which is convenient for the formation of a water tower with running water. The entire cement plant will lay water pipes, which is also an expense. It is currently being installed.
Because of the substitute teachers who came with Jin Chi with four summons, plus Li Yulan to conduct data statistics together, he was also happy to be idle, and finally it was OK to take a look at the cost, and then he was announcing the final data to the investors, making the construction fee into an iron account, and incorporating it into the cost fee.
The gate is relatively simple, but it is a capped iron gate, covered with tiles, and there is a separate guard room at the door, which is actually a very small room tile, and this place will be guarded 24 hours a day, and it is enough to find an older honest person to guard it.
The ground is still muddy, and it will not be treated for the time being, and the cement calcined by the cement plant will be used to pave the road surface of the plant, etc., to save costs and carry out cement tests.
He had already walked into the gate at this time, and after entering the door, there was a row of warehouses on the left, which was built relatively simply, although it was also made of bricks, but there were no walls separating it, and the walls were not painted, and the walls of the canteen were plastered, after all, it was a place for people to eat, and it took a lot to deal with it.
The storehouse also has no door, it is directly open, and the spacing between the pillars is also large.
The depth of the warehouse is about seven meters, out of a road, about six meters wide, the inside of the highway is the production area of the cement plant, the beginning is the crusher, after the crushing, it will be stored in the warehouse first, and then calculated by the statistician, according to the proportion with the rest of the raw meal, such as clay, refined coal, etc., with a mixer for mixing.
After mixing the raw meal, a little to the front is the grinding machine, the prepared raw meal is grinded, after grinding, it will be directly loaded into the front of the large vertical kiln, and the excess mixed raw meal will be stored in the warehouse opposite.
When the calcination is completed, there will be a crawler design here, because the calcination temperature is thousands, so just after calcination, the human body can not contact the clinker, must be transported into the refrigeration equipment by the crawler, this set of preparation equipment occupies a large area, a bit like a train style, the crawler enters from this end, and then comes out from the other end, with a total length of about 30 meters.
After the clinker is cooled down, a statistician is needed here, according to the weight of the clinker, according to the proportion of the mixture, such as calcined coal gangue, slag, etc., after the matching, it will be ground again, and the final thing that comes out is cement.
When the cement comes out, it will be bagged, which is generally divided into fifty catties and one hundred catties of design, and here a packing group is needed, and a statistician is also needed.
As for Li Yulan, he is nominally a statistician, but in fact he is his secretary, such as making meeting minutes, notifying various departments to hold meetings, etc., if he is not there, he can go to Li Yulan to register something, and deal with it when he returns.
At this time, the equipment of the cement factory has not yet returned, and the ground has not been treated, and there is another kiln building site that has been reserved, etc., which looks a little dilapidated, but everything will be fine.
The cost of building a vertical kiln is not large, the key is the supporting design of the vertical kiln, refrigeration equipment, it is more cheating, 50,000 yuan a set, it is simply a dead father.
The back of the warehouse is a road, and the back of the production area is a cliff, which is a kind of cliff without mud, and the stones are connected in large pieces, so there is no possibility of landslides and mudslides, and the top of the mountain is full of forests, so that it can also absorb the smoke excreted by purification. The smoke cooker dozens of meters high, which is the supporting of the vertical kiln, is also the landmark building of the current cement plant, which can be seen from afar.
At this time, he did not come to visit, but according to the model of the Jingxian cement factory and his own production management experience, he divided labor.
Overall, it is divided into three groups: crushing and grinding of raw meal A, calcination and refrigeration of clinker B, and grinding and packaging of clinker C.
And he took care of procurement and freight alone, which is equivalent to solving the problem of both the beginning and the end.
Group A is in charge of the auspicious Tang Chao, with two statisticians, in fact, the statistician is equivalent to the role of supervisor and technician.
Group B is in charge of Chen Danian, who planted the flag, and will be matched with a technician invited from outside to be responsible for the maintenance and maintenance of machinery and equipment.
Group C is in charge of Xu Dazhuang of Jiaoshan, with a statistician, this piece will concentrate on the Jiaoshan Gang, which is easy to manage, and this group is estimated to be a place where Fang Dajun often stays, because the finished cement is here.
In the end, a workshop director is needed to coordinate production, and Yang Zhongjian, the calcination team leader of Jingxian Cement Factory, must be such an experienced and skilled hand, if he can't dig this person, he will also find a way to find another person.
In addition, after the large equipment is delivered, such as crushers and refrigeration equipment, there will be technicians from the equipment factory to stay for a few days, teach the workers how to use it before leaving, the cost is borne by the cement factory, not responsible for wages, but will be responsible for food and accommodation, of course, if you know better, you will give a red envelope.
Fang Dajun is alone, concurrently serving as the factory director, director of the personnel department, financial director, logistics director, IE engineer, etc., but he only gets a salary, which is really cheap, but at the same time, he is also powerful.
The total investment of the cement plant is 100,000 and 55 thousand yuan, and his family invested 50,000 yuan; 20 retail investors each contributed 2,500 yuan, and the collective investment was 50,000 yuan; Each of the five communes contributed 1,000 yuan, and the collective invested 5,000. In addition, a set of refrigeration equipment of 50,000 yuan was also credited.
In fact, the cement plant spent so much more than 150,000 yuan, and as a result, a ton of cement earned 20 yuan, or even less, because the number of workers raised was more than twice as many as that of the coal plant.
The total investment of the coal plant is only 10,000 yuan, and the loan is only 20,000 yuan, and the money earned will not be less than that of the cement plant.
But he needs this cement plant, first, Wang Hongwen needs to rely on this position, as long as Wang Hongwen is in power, then the resources of the seven communes of Beidou will be open to him, and there is no need to worry about official pressure.
Second, he also needs a cement factory, using this as an excuse to engage in other industries, such as coal, reselling goods, contracting land, and so on.
In general, as long as the cement plant does not lose money, even a small loss, he has to bite dry, if he can make money, of course, everyone is happy, after all, he is also responsible for investors.
If you include the cost of the tractor and the surrounding costs, in fact, the total investment of the two factories will be close to 200,000 yuan, and 200,000 yuan will only be able to buy one toilet in a big city in 30 years, but it is an absolute huge amount of money now, equal to more than 1.6 million catties of rice.
Shaking his head and coming back to his senses, he began to arrange the personnel of the site, and there are corresponding warehouses opposite the three groups of production areas in ABC for transit, and then the area will be divided, such as the materials in the B area will be strictly forbidden to return to the C area, and the materials in the A area can not be returned to the B area to prevent the occurrence of mixed materials.
When the time comes, he will be stuck in all links, he is not a producer, he is definitely a very good manager, according to the production situation, a lot of standardized rules will be formulated, of course, the first and most important thing is safety, safety is heavier than Mount Tai!
Because there will be a transfer of materials in the warehouse, then a lot of iron trolleys will be purchased back, it is expected to be forty, as well as tools such as shovels, some tools can be produced locally, and some have to place orders from the outside.
"Brother Dajun, it's time to eat!" Xiao Yuqin's coquettish voice came.
Fang Dajun is happy, this morning has passed like this! (To be continued......)