Chapter 30 Unspoken Rules of Engineering Units

In engineering units, there is such an unspoken rule.

All the quantities that are not designed can be done with hands and feet.

Nine out of ten leaders understand this.

Like this kind of river filling, this square amount is not given at all, and there is no design amount, like an unknown bottomless pit, no one knows how big his belly is.

The amount of work obtained by the leaders of the project department is reported on site, and the amount reported on site is the actual quantity.

It's impossible for a leader to come down and measure for you whether this measure is correct or not, and they won't do it.

For this kind of project without design volume, it is easy to do tricks, the difference is who is bold and ruthless.

For example, when the land is requisitioned, there is a sapling, according to the requirements, a sapling is twenty yuan, the leader in a word, add the number of saplings to a hundred, or more, as for this part of the money to increase the number, it goes directly into the leader's pocket.

This kind of thing is commonplace in engineering units.

Otherwise, why would anyone sharpen their heads and squeeze into leadership positions? Isn't it just for the money?

In the 31st Railway Bureau, there is such a person, in order to become a deputy manager, he sold a house he lived in, and then used the money from the sale of the house to bribe the leader, and finally became the deputy manager.

Because of this, his daughter-in-law almost divorced him.

But when he sat in the position of assistant manager, in three years, he bought a bigger house.

It can be seen that even if it is an assistant manager, as long as you want to get money, you can get it anywhere.

In the engineering unit, things like digging foundation pits and filling sidewalks do not have a specific design quantity, and they can be done completely.

These methods are all used by the little people below, and when it comes to the upper leaders, they also have their own ways to make money, and the means are wonderful and amazing.

Shu Cheng can be regarded as having experience.

For example, the manager of the project department, when the technician below reports the actual quantity of on-site settlement to the manager, this quantity is definitely less than the quantity on the contract.

Because when signing the contract, a certain coefficient will be added to the number of designs to prevent the situation of exceeding the contract settlement in the future.

In order to get the money openly, the project manager will change the amount of settlement on the settlement statement, of course, the number of other changes will not exceed the number of contracts.

As for this part of the amount that is more than the actual settlement quantity, the manager takes the money directly from the construction team.

In other words, the project department gave the money that the construction team had not done to the construction team, and the project manager took this part of the money from the construction team.

In this way, even if the superior leader comes to check the accounts, it is difficult to find out the trickiness.

Even if you want to check, tie up the son-in-law, because many construction projects are hidden projects, and after construction, they are all poured in reinforced concrete, and if the building is not destroyed, you can't know the internal situation at all.

This also leads to a detailed investigation, and it is extremely difficult.

This method is a safer, less risky method, and is used by most managers.

The superior leaders are also very clear about the ideas of the project manager, and they all come from the project manager.

In order to prevent this situation, many company leaders stipulate that the number of contracts cannot exceed the number of designs, which also indirectly controls the corruption of the project manager.

However, there is no doubt that there are policies at the top and countermeasures at the bottom, and the thinking of the Chinese people is extremely powerful.

For Wei Jian, it is really rare to pay benefits to employees at the work point through guò.

The general leader is to fill his own pockets, as for the others, get out of the way, he cares if you live or die.

Three days later, the relevant procedures of the river bureau came down. After Shu Cheng came to the construction site, he got into Zhao Qingming's van directly.

"Shu Gong, I came to work so early. Zhao Qingming slept in the van for a while at noon, and when he saw Shu Cheng open the car door, he said with some sleepy eyes.

"I took a nap at noon, and then I came over, and there was nothing wrong with the station anyway. Shu Cheng sat down on the co-pilot and straightened his posture.

"Do you know when the bridge reinforcement over there at K92 will be opened? Zhao Qingming asked.

Now that the bridge reinforcement of K88 is about to be completed, and even the bearing platform on the shore is about to be completed, Zhao Qingming must consider the next project, after all, he came here to make money.

Once this project is completed, Zhao Qingming will have to work on other engineering projects if he wants to make money.

If the shallow foundation reinforcement of the K92 bridge is to be opened, Zhao Qingming can just move the drilling rig there, and he can also save part of the reversing fare.

The construction team is more shrewd than most people, and they think very carefully about every step of the construction process, and only in this way can they make the most money.

"K92 reinforcement hasn't been said yet, but don't worry about running out of work, the river here is about to be filled." Shucheng Road.

"The river channel of K88 needs to be filled? When? Zhao Qingming was stunned for a moment, and a glimmer of light flashed in his eyes.

Obviously, as a shrewd small boss of the construction team, he has a keen sense of smell and realizes that there is money to be made.

"The specific time has not yet been decided, it should be in the near future, this old Wei let me take a part of the amount from you, and then you can directly give the money to Lao Wei." After thinking about it, Shu Cheng felt that it was better not to interfere in this part, although Wei Jian believed in himself and let himself get it, but after all, this was money, and he only gave the corresponding amount, as for how much money, let Wei Jian and Lao Zhao calculate it themselves when the time came, and Shu Cheng would save trouble.

As long as Shu Cheng gave Wei Jian the amount of overreporting, with Wei Jian's experience, he would know how much it would cost after thinking for a while.

As for how Wei Jian distributed the money, Shu Cheng didn't want to participate.

"Walk, Shu Gong, how much does Manager Wei ask to walk?" Zhao Qingming's eyes flashed brightly, and he smiled, his hazy eyes were full of brilliance.

"I don't know how much, I don't know until the time of filling, and then the amount of the site will be changed according to the actual according to the reality, and the final amount will be added, and I will deal with it here." Shucheng Road.

"Okay." Zhao Qingming nodded, and then said: "Shu Gong, I don't think Manager Wei will come to the scene to supervise, it is better to get you a hundred and eighty square meters at that time, anyway, this amount of square meters, I can't see it." ”

Hearing Zhao Qingming's words, Shu Cheng understood his thoughts, if Shu Cheng gave Wei Jian the amount of the actual overreport, Zhao Qingming could get very little money, because most of the money was taken by Wei Jian, and he couldn't even get it.

If you give Shu Cheng one hundred and eighty squares, after giving this money to Shu Cheng, on the one hand, you can buy Shu Cheng, and on the other hand, Shu Cheng will definitely give Zhao Qingming some money in order to keep Zhao Qingming from spreading, so as to kill two birds with one stone.

Shu Cheng smiled slightly, and said: "Cheng, but not too much, too much is easy to be discovered, when the time comes, I will give you thirty percent, and the other seventy percent will be mine." ”

The number of thirty percent is still a lot.

If the contract price of one piece of soil is 26 yuan, in addition to the 5 yuan of the boss at the top, there are 21 yuan, and these 21 yuan, there are 10 yuan for buying soil, 3 yuan for transportation, and 3 pieces for bulldozer leveling, 16 pieces are removed here, and only 5 pieces are left.

These 5 yuan are what Lao Zhao and Zhao Qingming earned.

Now the problem is that the soil on this side has not been transported at all, so the previous 16 pieces have been omitted, and the commission of the boss at the top is 21 pieces, and these 21 pieces are directly distributed to Lao Zhao, Zhao Qingming and Shu Cheng.

If it is 30%, it is 6 pieces, and the remaining 15 pieces are Shucheng's.

If you remember 500 square earthworks, it is 25,000 yuan, even if you deduct some, Shucheng can get more than 20,000 yuan!

It can be seen how rich the benefits are.

"Shu Gong, don't worry, how can I tell others about this?" Zhao Qingming said with a smile.

In the end, Shu Cheng discussed some of these details with Zhao Qingming, after all, it was not so easy to hide from Wei Jian, and a little carelessness would be fatal to Shu Cheng.

But fortunately, after Shucheng was reborn, he was already an old fritter, and these things were running like a fish in water, and once the agreement of the river bureau came down, the river could be filled. xh118