Chapter Twenty-Nine: How to Do It
At the beginning of September, the roadbed of Haocun Station began to be filled, and Shucheng directly handed over all the technical work of K88 bridge reinforcement to Zhang Min to deal with.
As for Shucheng, he took Wu Peng to manage the filling of the station subgrade of Haocun Station.
If it was the previous Shucheng, the first time to dry the station subgrade, I don't understand many aspects, but after the rebirth, the Shucheng trunk subgrade is wide, which can be said to be easy to catch, and it is very convenient.
Due to the roadbed widening work of Haocun Station, it is the first roadbed project of the Jersey Line, and both the project department, the bureau and the supervision station attach great importance to this project.
Superior leaders came to the site several times to inspect and were quite satisfied with the work on the site.
In fact, Haocun Station is a small station, and the roadbed is only more than 2,000 square meters, which belongs to the transformation of a small station.
The entire widening project took ten days to complete, and the K88 bridge reinforcement pile foundation project, there are 12, the bearing cap on the shore has been dried for a total of 8 and a half, and the ninth root has three days to pour.
Four drilling rigs, at most half a month, can complete all the 12 pile foundations, and then there will only be six bearing platforms and 24 pile foundations in the river channel.
On the second day after the roadbed of Haocun Station was widened, Shucheng knocked on Wei Jian's door.
"Come in."
"Manager Wei." Shu Cheng pushed the door and entered the road.
"Oh, Xiao Shu is here, sit." Wei Jian said casually,
With the cooperation with Wei Jian during this time, Shu Cheng felt that Wei Jian was still very good and very protective of calves.
"Manager Wei, I'm here to discuss something with you." Shucheng gets straight to the point.
In any work, there must be more communication, which is the experience of Shucheng for a long time.
"Oh, you say, let's discuss it together." Wei Jian leaned on his chair, took out a pack of cigarettes from his pocket, and handed one to Shu Cheng.
After Shu Cheng took the cigarette, he lit it for Wei Jian first, and then lit it for himself.
"That's the way Manager Wei, now there are 12 pile foundations on the K88 bridge to strengthen the shore, which can be completed in half a month at most, and in three days, the bearing cap on the shore can be completed nine, and 12 can be completed this month, and there are only two on the shore of the bearing cap, and at most in mid-October, the bearing cap on the shore can be completed." Shu Cheng explained.
When Wei Jian heard this, he nodded slightly, and motioned for Shu Cheng to continue.
"My construction is to start filling the river now, after all, it is now mid-September, the rainy season has passed, but the flow of the river is not small, I am afraid that the platform that has just been filled will not be able to carry out pile foundation construction." Shu Cheng voiced his concerns.
Because the water flow of the K88 bridge to reinforce the river is not small, after the island is built with soil, the pile foundation construction may not be carried out immediately, the meaning of Shucheng is obvious, after the island is completed, give him about a month to settle naturally, and then start construction, in this way, it may be helpful for the construction.
"Well, I know what you mean, I have discussed this matter with Manager Zhang and Manager Ren, and now that the rainy season has passed, it is indeed a good season for construction, but the river construction is not so simple, because it is related to a problem of the river bureau. I communicated with Secretary Li before, and Secretary Li meant that now Jianzhi is running the procedures of the River Bureau, and once the procedures are down, we will start to build islands in the river. Wei Jian said about the plan of the project department.
Shu Cheng didn't know about these, but seeing that Wei Jian was ready to build the island, Shu Cheng didn't say much, it seems that the leader's thoughts are the same as Shu Cheng's, and they are considered in front.
"So that's the case, but Manager Wei, only use loess to fill, I don't think it's good, it's best to mix some sand in the soil, otherwise it's all mud, the pile foundation can't be constructed, and this is also related to the future excavation of the cushion cap, if it's all mud, the cushion cap protection can't be done, and he will collapse as soon as he digs."
Shu Cheng said some of his own ways based on his own experience.
"Well, I will discuss this with the leader, now I want to ask you a question, according to your estimates, how much earthwork will be needed to strengthen the river and build the island for the K88 bridge?" Wei Jian took a deep puff of his cigarette and spit out.
Shu Cheng frowned slightly, this question is not easy to answer, first, the water level of the river has not been measured, I don't know the specific depth, even if the depth of the bank on both sides is known, the depth of the center of the river has not been measured, at least I can't get an average.
It is difficult to estimate how much earthwork is needed without counting jΓΉ.
Another point is that the water flow of the river is not small, and when filling, how big the loss coefficient is, this must also be taken into account.
Of course, when Wei Jian asked Shu Cheng like this, he definitely needed an approximate number, so that Shu Cheng could roughly estimate one.
Shu Cheng, as the technical person in charge of the site, even if it is an estimated number, cannot be nonsense, it must be reasonable.
There are six piers in the river, there are five empty in the middle, one is empty is 16 meters, five is 90 meters, assuming that the depth of the river is three meters on average, the filling width is 20 meters, because the size of the cushion cap is 10 meters * 10 meters, 20 meters should be enough.
In this way, the amount of filling in the river is 5,400 square meters, and if the river water is washed away, it will be at least 7,000 square meters.
After pondering for a moment, Shu Cheng spoke: "If the water depth of the river is calculated as three meters, and the filling width is calculated as twenty meters, it will be at least 7,000 square meters. β
"7,000 square meters?" Wei Jian thought for a while and said, "This number shouldn't be enough, the number reported by Manager Zhang and I is about 10,000 square meters." β
"That's about the same amount." Shu Cheng did not object, nodded and said.
Wei Jian pondered for a moment, and said to Shu Cheng: "This earthwork leader has decided, or Lao Zhao's side to fill, during this time, the guys at the site are also tired, I have communicated with Lao Zhao, when the time comes to fill, you go some squares, take out this part of the money, and give some bonuses to the guys at the site, how to operate, you and Zhao Qingming count." β
Hearing Wei Jian's words, Shu Cheng was stunned for a moment, and then he knew what Wei Jian meant.
Obviously, Wei Jian wanted to work on the earthwork to fill the river.
First of all, there is no reasonable design value for the amount of this river filling, and it is simply unknown how much earthwork is actually needed. How much earthwork really needs to be filled is only known after it has been filled.
Since there is no design number, even if two thousand square meters are added to it, it can be explained.
And these two thousand square meters are actually not filled at all, and this part of the money can be operated. Wei Jian, who has rich construction experience, obviously wants to do something on the earthwork.
But then again, Wei Jian didn't hide it from Shu Cheng and ate alone, which was already very good.
As for what Wei Jian said, giving some bonuses to the guys at the work site, Shu Cheng didn't care, but what Shu Cheng could be sure of was that his own money must be indispensable, otherwise Wei Jian would not mention it in front of him.
Now the remaining thing is the agreement of the River Bureau, once the agreement is down, the river filling can be carried out, Wei Jian actually spoke, and handed over this matter to Shucheng, which is an affirmation of Shucheng, and it is also a test for Shucheng.
Some people may say, what if the guys at the site take the money and report it to the project department?
This is completely reassuring, after the employees of the site get the money, they can't even hide it, how can they report to the leaders of the project department. Of course, there is an important point in this, that is, when giving money to everyone, it should be given separately, so that he will think that only one person has been given money.
"Okay, Manager Wei, I know what to do." Shu Cheng nodded.
Wei Jian said everything very clearly, and even mentioned it to Shu Cheng.
Wei Jian has already told Manager Zhang that the filling of this river channel is about 10,000 square meters, as long as the amount reported by Shucheng is around 10,000 square meters, there is no problem, as for how much more than the actual square volume, this is not important. xh118