Chapter 70 Proceeding in an orderly manner

In the afternoon of the same day, Wan Yong got two jade streams and threw them directly to Han Zhao, Han Zhao's wrinkled face was as happy as a chrysanthemum!

Not to mention, after Han Zhao received the two jade streams, he didn't worry too much about things on the construction site, and he didn't wander around, he just got a mazha during the day, sat in the rest shed, and bragged. ○

For Han Zhao's expression, Shu Cheng is also happy and comfortable, the supervisor doesn't care about things, he has less trouble, and as for the construction period, it will be carried out in a rocket style.

In the next few days, the cushion of the signal building was also completed, followed by the strip foundation, which took a long time to complete.

The main reason is that some grounding and the like are more troublesome, and there are many procedures and some delays.

During this time, Zhang Tianhu came once, and Wei Jian came three times, except for some precautions, he didn't ask for anything.

However, the two of them are satisfied with the speed of the Yunzhuang signal building!

After the strip foundation is poured, it is backfilled, seizing this time, Shucheng is ready to ask the construction team to dig out the fire pool first.

The so-called fire pool, to put it bluntly, is a building built artificially to store water for fire fighting. To put it more colloquially, it is to make a pool, which is used to store water, and second, what is this water used for? Mainly for firefighting!

But when Shu Cheng saw the drawings of the fire pool, he suddenly had a headache, the fire pool of the general signal building is made on both sides of the signal building, but the fire pool of Shangyunzhuang is very wonderful, directly in front of the signal building?

It's nothing to do in front, but when the excavation is over, the public works section finds the door, the reason is very simple, in this place, the fiber optic cable below 4 meters can't be dug down!

According to the design, the fire pool must be buried, and at the same time cover 50 cm of soil on the top of the fire pool, which is covered with 50 cm of soil on the top of the pouring pool.

This is also for the aesthetic effect, otherwise a large pool will be exposed, and it will be uncomfortable for anyone to see.

But now the total height of the fire pool has exceeded four meters, and the foundation pit is only four meters at most.

Faced with such a painful problem, Shu Cheng had no choice but to consult Manager Wei Jianwei!

Manager Wei's word, looking for your chief engineer!

Then Shucheng crackled and called the chief engineer Sun Xun, Sun Xun can't help it, now your foundation pit is excavated, there is a fiber optic cable underneath, you must not continue to excavate, then only press the wrong one, continue the construction.

In fact, it can't be said wrong, it's just that the construction drawings don't match the site!

Since Sun Xun has spoken, Shucheng will continue to build, no, the fire pool has just been excavated, and it is not beautiful, and it is raining heavily.

The fire pool was originally in front of the left side of the signal building, near the platform, and should be only two meters away from the inner edge of the platform.

Now when it rains, the fire pool is close to the side of the platform, and it collapses directly, the collapse is not strict, but it extends to the platform to cover the fall, if you walk on the platform, look down at the shield, you can find that the soil below has collapsed.

At first, Shucheng didn't feel anything, after all, the collapse of the fire pool did not affect the platform, and after the rain stopped, the cushion and bottom plate of the fire pool could be poured, and then poured together with the main body of the signal building, and the backfill could be completed.

But I don't know when this matter reached the ears of the foreman of the public works section, and he came directly to the door, he did not look for Shucheng, but directly notified the construction team, asking for a suspension of work for rectification, otherwise he would issue a rectification notice!

After Shu Cheng found out, he was not nervous, took out his mobile phone, and prepared to call Wan Yong.

Before the call could be dialed out, Wan Yong's call came to his mobile phone.

"Hey, Wangong!" Shu Cheng pressed the answer button.

"Minister Shu, Engineer Xue asked to stop work, saying that the collapse should be dealt with first, what do you think about it?" Shu Cheng hasn't looked for Wan Yong yet, Wan Yong has found it himself.

"Today, the rain has just stopped, and it is difficult to enter the construction site, you arrange two or three people to protect that piece first, and at the same time go to the side of the platform, and cover the opening with a wooden plank, in case the leader sees it when he passes by the platform, and at the same time, you get two cigarettes and send them to Foreman Xue, I don't think it's a big problem." Since Wan Yong called him, Shu Cheng didn't hide it, and said: "When you go, by the way, tell Foreman Xue how to deal with it, and said that the fire pool will be poured in a few days, I don't think it's a big problem." ”

After all, during the construction of the project, this kind of thing often happens, and the person looking for trouble is nothing more than looking for some benefits.

"Okay, then do as you say!" Wan Yong nodded.

"Wait a minute, you should get two Yuxi, and I'll send them to you." After thinking about it, Shu Cheng continued.

In the future, in Shangyunzhuang, Shucheng and Foreman Xue must greet each other more than Wan Yong, and Shucheng will have to come forward for a lot of time, and there is also the transformation of the battlefield in Shangyunzhuang, the filling of the roadbed, and the construction of leveling and erection have not been completed, and many places have to rely on Foreman Xue.

Although the leaders of the project department and the stationmaster and foreman of Shangyunzhuang have been in contact, and the relationship has been handled, but sometimes, the distant water can't save the near fire, Shu Cheng feels that he just took this opportunity to meet with Engineer Xue, and the future work is much easier to deal with in terms of cooperation.

Shu Cheng came forward, but the smoke must still have to be brave, to do a project, this little money still has to be paid.

"Cheng, then do it, wait for me to send you two cigarettes, by the way, give one old Han, and pour the main body immediately, don't let him find trouble." Wan Yongdao.

"Well, this can be had!" Shucheng Road.

Han Zhao has been taking two cigarettes for half a month, and the main body of the signal building is being poured once, and it is finished, so it is necessary to get another cigarette for Han Zhao.

After pondering for a moment, Shu Cheng said: "Why don't you invite Lao Han to have a meal in the evening, and give him the cigarette by the way!" ”

"Yes, let's go together in the evening." Wan Yongdao.

Asking Han Zhao to eat, Shu Cheng must also be indispensable.

In fact, Shu Cheng and Foreman Xue also had contact in the previous life, but it was not deep, when Shu Cheng put two Yuxi cigarettes in a black plastic bag on Foreman Xue's table, the collapse of the fire pool was basically half solved.

Later, after Shu Cheng said how to deal with the fire pool, Engineer Xue didn't want to talk about this matter anymore, so he fooled around and passed, because he couldn't find any other reason to embarrass Shu Cheng.

After all, Engineer Xue took the benefits, and others also gave a way to deal with it, what else can you do?

The next construction was carried out in an orderly manner, from the start of construction to the completion of the main body pouring, and the completion of the fire pool, it took a total of 20 days, and the previous construction period was arranged for 27 days, which was reduced by half.

The main reason for the construction schedule is that I didn't expect the earthwork to be carried out so quickly, and the time consumed in this regard is relatively long.

For the main construction period of Shangyunzhuang Signal Building, not only Wei Jian was affirmed, but even Zhang Tianhu was verbally praised at the meeting of the project department.

In this process, the land acquisition of Shangyunzhuang station is also in full swing, when the main body of the signal building is poured, Secretary Li of the project department has been with the Shangyunzhuang Village Committee, and the land acquisition problem has been basically solved.

This also indicates that the construction of Shangyunzhuang and the construction of roadbed filling have entered a stage of countdown.