Chapter 740: Leipzig of the East
On one side of the city, there was a lot of trouble because of the forced demolition, but on the other side of the city, Jin Xiaoqiang didn't have the leisure to keep an eye on Fang Shao and Yu Shaodong's every move.
After knowing that they were going to carry out demolition and relocation, and there would definitely be no good results, Jin Xiaoqiang no longer worried about their affairs, because he knew that with the radical personalities of these two people and the way they like to deal with things out of the ordinary, there will definitely be an accident in this demolition work, and all he has to do is just wait.
Once there is a problem with their demolition work, the rest of the things can be solved, and all they have to do is push the boat with the water.
During this time, he didn't have time to spend with the two of them, and he still had a lot of work to deal with, such as the renovation and expansion of the factory that he needed to worry about the most.
Last year, Huayang Power made plans to expand the new plant, and they plan to build three new factories to increase the company's production capacity from the original 1.5 million vehicles to 3 million vehicles.
They will build two large-scale production bases with an annual output of 500,000 vehicles in Yangcheng, Yucheng and other places, and the current production capacity of Huayang Power Corporation will also be expanded, and the production capacity will be increased from the original 1 million vehicles to 1.5 million vehicles.
The construction of new factories in Yangcheng and Chongqing has already begun and is expected to be completed within two years, while the expansion of factories in the provincial capitals is much more complicated, according to Jin Xiaoqiang's vision, the entire expansion and restructuring work will take three to five years to complete, and this is still without affecting production as much as possible.
Once the entire plant has been rebuilt and expanded. The headquarters of their Huayang Power Company will be a collection of automobile manufacturing and machine tool manufacturing. There is also a large-scale comprehensive industrial base integrating special metal smelting and equipment manufacturing, and its effect is no less than that of the Ruhr area in Germany. It could even be called the Leipzig of the East.
The reason why Jin Xiaoqiang has such an idea is entirely because he has been to Germany several times before, participated in auto shows, or when he was purchasing equipment, he visited the German factories, especially some of the latest factory designs designed by Germans.
In modern industry, if you want to improve efficiency and ensure the quality of your products. It is no longer like in the past, as long as you pay attention to management and production, the appropriate production line, and the design of the latest production plant will also be the key to improving product quality and improving work efficiency.
At the beginning of Huayang Power's creation. The reason why they were able to quickly complete the construction and start production was that they acquired the original Laonan # Yang No. 1 Machinery Factory, the original time-honored state-owned enterprise, which left a very rich legacy to Huayang Power.
At that time, Huayang Power relied on these legacies. In order to be able to quickly complete the production and construction, quickly produce and manufacture their own products, and save a lot of trouble in the design and construction of the factory.
This deal seemed very cost-effective at the time, but a few years later, especially after the rapid expansion of the scale of Huayang Power Company, these early factories are now completely inadequate from a modern point of view.
Especially after Jin Xiaoqiang visited some German factories, he felt that if the current production line and production workshop of Huayang Power continued to operate like this, they might never be able to make further breakthroughs in the high-tech field.
This is entirely due to past and present production models, production technologies, and the products produced.
In the early years, the Nan@Yang No. 1 Machinery Factory relied on the help of experts from the former Soviet Union to design and build the plant, and quickly became the largest machinery manufacturer in China, and is a very comprehensive production unit. …,
There are metal smelting and manufacturing plants here, there are raw material storage workshops, and after the metal is produced, it can be directly sent to the processing workshop, processed, and then produce diesel engines, cars, tractors and other agricultural tools, and even railroad tracks, locomotives, and quite a lot of military products.
At that time, it was a giant enterprise that could feed hundreds of thousands or even hundreds of thousands of people, and a comprehensive and covering enterprise that could produce any heavy industrial products.
But later, after more than 20 years of baptism after the reform and opening up, and the impact of a large number of private enterprises, the enterprise finally could no longer move, and finally could only fall to the ground, but the legacy he left behind is still very rich.
Machinery and equipment, factories are not counted, and land alone can make anyone feel red.
At the beginning of Huayang Power, the conditions here were indeed very suitable for the operation of Huayang Power, but in the next few years, some shortcomings of this factory began to leak out.
For example, the conveying and batching device of the production line they use, as well as the machine tools they use, are very inappropriate to use in the current factory floor.
In particular, the machine tool processing and equipment manufacturing industry, which Jin Xiaoqiang attaches great importance to, is very inappropriate in the original plant of this factory.
For example, the modern airport processing industry, especially the high-precision machine tool processing and equipment manufacturing industry, has very strict requirements for the plant.
Not to mention that the requirements for the land alone are very strict, we all know that when the modern mechanized manufacturing industry uses machine tools to process and produce, the machine tools often produce a certain vibration for the processing of some working parts, and these vibrations will be transmitted to the ground through conduction, and the ground will generally feedback back a recovery force, and this recovery force will bring some slight vibrations that are difficult for our human body to feel, and these vibrations that require high-precision machining machine tools can be felt. And this vibration often affects the accuracy of machining.
Moreover, recently, Nan#yang City has been engaged in large-scale construction and real estate development everywhere, and demolition is being carried out in many places, and some buildings will be blasted when they are demolished.
The shock waves generated by these blasting operations will be transmitted through the ground, and when these shock waves are transmitted to the high-precision robot processing production line of Huayang Power, it will seriously affect the accuracy of the workpieces they process.
And for Jin Xiaoqiang's long-standing optimism about the machine tool and equipment manufacturing industry, these industries need more precision to ensure processing, and the vibration of surface transmission will have a great impact on the processing accuracy of this industry.
So if you want to go one step further in the industrial industry, you have to put a lot of effort into the foundation of this factory alone.
Originally, when the time-honored Nan # Yang No. 1 Machinery Factory was under construction, it didn't consider these things at all, let alone any ground backfill, plus the industrial products produced in the former Soviet Union at that time were also based on stupid and rough shapes, so when the factory was designed, it didn't consider any processing accuracy at all.
However, in today's industry, which has higher and higher requirements for machining accuracy, it is obvious that these old factory facilities are no longer suitable.
This is also the main reason why Jin Xiaoqiang proposed to rebuild the original Laonan @ Yang No. 1 Machinery Factory, the new factories built in Yangcheng and Yucheng will be built in full accordance with the current international latest technical standards, and the head office can not lag behind at all.
Now Huayang Power's market share and sales continue to increase, if this problem is not solved, then they will face great problems in the future, especially in the quality of products and the productivity of defective products, which will bring great losses to the company. …,
After last year, Jin Xiaoqiang proposed to rebuild and expand part of the new factory, this proposal was approved by many senior leaders at the company's middle and high-level meetings, after all, most of the management personnel in the company currently understand technology and management, have studied abroad and worked in large overseas manufacturing companies.
Jin Xiaoqiang is also an arrogant character, if he doesn't do it, he will be pulled down, but if he wants to do it, he must do his best, this is his business philosophy.
So after specifying the plan, last year Huayang Power sent a lot of teams to Germany, Japan, and the United States to investigate, and after a round of inspection, it was finally decided to adopt the German design model to build their new factory.
At the beginning of last year, after the inspection, they invited the design team from Germany to inspect their factory site and then design it.
After all, the area of Nan#Yang No. 1 Machinery Factory was very large, and the production area used by Jin Xiaoqiang and them now is only a quarter of the original old factory, so if a new factory and workshop are built, it will be carried out on the original remaining land.
In August last year, the German team of designers finally got the latest design drawings, and the design standards of the new factory will be fully implemented in accordance with the specifications of BMW's Leipzig plant.
The first phase of the new factory will invest 9 billion soft sister coins, covering an area of 2.07 square kilometers, equivalent to ten bird's nests, with an automation rate of more than 95 percent, a water circulation rate of 90 percent, and the production process can even be on par with Rolls-Royce.
The annual production capacity of the first phase will reach between 1 million and 1.2 million vehicles per year, covering all models of Huayang Power......
At that time, when Jin Xiaoqiang saw this detailed plan, he was also excited, and finally a new, brand-new, and completely world-class large-scale automobile manufacturer was about to be born in his hands.
If this factory can really be completed, then it can be called the Leipzig of the East...... (To be continued)