Chapter 351: The Trouble of Electricity

Chapter 351 The Troubles of Electricity

Two weeks after Zhang Zijian returned to Weidong Town, the construction of the entire Weidong Town entered a climax period, and at the same time, Zhang Zijian also used his connections in Japan to send Meng Quansheng and others to Japan to study, learn more advanced management experience, and see how people serve in place.

The autumn tiger is very hot, and the air conditioner in the office is humming, as if protesting something? Refrigeration is like an ornament.

Liu Baoquan is still serving as the director of the office, waiting for the trading market to be fully open before taking office. Zhang Zijian called him over and said to him: "This air conditioner is a little faulty, let people come and repair it." ”

Liu Baoquan said to Zhang Zijian with a wry smile: "Mayor Zhang, there shouldn't be much wrong with the air conditioner, not only you here, as long as we have air conditioning here." ”

"Oh, since it's all like this, it means that the quality of the air conditioners purchased in this batch is not up to par, and whoever is responsible will let him change it." Zhang Zijian said domineeringly.

"It's not a quality issue." Liu Baoquan's face was even more depressed and said, in fact, this batch of air conditioners was really handled by him, and he didn't ask for a kickback at that time, and he was given a 21-inch imported color TV. Now that Zhang Zijian has put him in charge, he is even more scared, he clearly said in the last conversation that he can't be greedy.

"What's that?" Zhang Zijian asked again, with an impatient tone, meaning that Liu Baoquan finished speaking directly in one breath.

"The voltage is unstable, and the power supply equipment in our town can no longer withstand our current electricity demand. The town's power distribution station burned down for a while last week, and you should remember that. Liu Baoquan said, looking at Zhang Zijian's expression.

Zhang Zijian nodded, there was such a thing, there was a sudden power outage, and then it stopped for a long time, Zhang Zijian also asked Liang Luosheng to ask, at that time in the town's power distribution station, the two transformers were like thunder, crackling and bursting, and the frightened people who bought fruit around hurriedly ran, thinking that the transformer was going to explode? Then bursts of smoke came out, after more than three hours of firefighting to extinguish, the substation was in a mess, the next day the county power supply bureau came to repair, after a day to repair, but also on the new substation equipment, now the voltage is unstable is overload in operation.

Liu Baoquan continued: "The county power supply bureau has given us advice, let us plan the use of electricity, because the distribution quota for our town has exceeded the standard, and at present, our town's power grid is 250 kilowatt ampere for agriculture, but many of our construction sites and small factories need to use three-phase electricity, which is also 380 kilowatt ampere, but the power supply station has changed from 250 kilowatt ampere to three-phase electricity, and the general small amount of electricity is okay, but now our town's electricity consumption has caught up with one-fifth of the ready-made electricity consumption." Let's go on like this, I think the new transformer will also burn? ”

Zhang Zijian said to Liu Baoquan: "I didn't tell the county power supply bureau about our electricity consumption here, so that they could change to a larger equipment, or it could ensure our civil and industrial electricity." ”

"Yes." Liu Baoquan said.

"Then why don't you change it?" Zhang Zijian asked with questions.

"The people from the power supply bureau said that they want to get more than 3 million? Who pays for this money, they don't have money, and now the power supply network is still in the seventies, so the output is afraid of danger, and it will cost more than 2 million to replace the line from the new. Or ask who is out? Liu Baoquan said.

"Won't you tell them, one and a half? This money has to be spent, and it is not negotiable. Zhang Zijian said with a hint of complaint, no one told him about it, if he did, Zhang Zijian directly found the county power supply bureau to negotiate this matter.

"At that time, you were in the Municipal Commission for Discipline Inspection, so no one bothered about it. In one, you can't pay for it even if you're solely co-funded. Liu Baoquan said with a bitter gourd face.

"Not for Mao. Hi, I'm fully funded by me, I'm going to go out of the line, what do they do to eat. It would be nice to be able to get half of it. Wholly funded and not given me supporting facilities. What are they trying to do? Hearing Liu Baoquan say this, Zhang Zijian became angry, he can't mess up his software facilities because of power distribution problems, you must know that geography and transportation are weaknesses in addition to electricity, how can Zhang Zijian attract investment, the future electricity consumption is huge, and this must ensure the smooth flow of electricity.

"It's that the power supply capacity of our county can't meet the demand, according to the past, the power distribution to our town is 10 kilowatts, but now it has exceeded the standard." Liu Baoquan told Zhang Zijian all the information he knew, so as not to get angry again.

"Let Wang Yong prepare the car, and you follow me to the county power supply bureau. In any case, we must also make the industrial and civil electricity in our town smooth this year. Zhang Zijian stood up and said to Liu Baoquan when he was preparing the bag.

After listening to Zhang Zijian's words, Liu Baoquan said "hey", turned around and ran out, asking the driver Wang Yong to prepare to start the car, and he also went back to the office to get the briefcase.

When he came to the county power supply bureau, Zhang Zijian found the director's office, and when he inquired, he knew that the director of the power supply bureau was called Lin Jiefang, who was about fifty years old and had been in the position of director of the power supply bureau for five years.

Knocking on the door and entering, Zhang Zijian saw a middle-aged and elderly person with a little shiny head on the desk, wearing a short-sleeved shirt, and there were a lot of texts in the corner of the table, the most conspicuous thing was that there was a canned and bottled teacup in the middle of the table, which was full of thick tea leaves. There is a cigarette between his fingers, which looks like he is very addicted, and his index finger is a little yellow.

"You are, what's the matter?" Lin Jiefang raised his head and asked, flicking the ashes in the ashtray.

Zhang Zijian saw that the other party had spoken, and said to Lin Jiefang with a warm smile on his face: "Hello Director Lin, I am Zhang Zijian, the mayor of Weidong Town, I am sorry to disturb me, but now there is something that I am really anxious to deal with, and I will rush over to discuss with you if I am not in a hurry." ”

Lin Jiefang looked at the young man in front of him, and only then did he understand where this came from, some time ago, he was the happiest to make a fuss, and there were many people in the county who discussed it, and he thought that this child had entered the Municipal Commission for Discipline Inspection, and it was over, but who knew that people would come out in a few days, indicating that there were people behind them, and they didn't know how big they were, and now there are mutual speculations behind them. With a lot of power and a huge amount of money at their disposal, who has the ability to do that in their early twenties? Think about it, someone behind them has sighed, there is no comparison. If there were any people, he would have jumped out to become a bigger official, and he would not have stayed in this poor county for five years, and I heard that it was interesting for him to work for a few more years.

"Oh, it's Mayor Zhang, sit down." Director Lin Jiefang raised his hand to let Zhang Zijian sit on the sofa on the edge of the office, got up to pour water for Zhang Zijian, and Liu Baoquan, who had sharp eyes, hurriedly took over the job of serving tea and pouring water.

As soon as Zhang Zijian sat down, he said to Lin Jiefang: "Director Lin, for the economic development of our county and Weidong Town, I have no choice but to come to beg you." ”

"There is nothing to ask for, as long as it is a public matter, you say that I can do it, you are at the forefront of reform and opening up and economic development, and I can't drag our county backwards," Director Lin said humorously.

"With your old sentence, the power supply demand in Weidong Town is very large, and the current equipment has not reached the current state of rapid development. In order for more than a dozen or hundreds of manufacturers to be injected into Weidong Town, the demand for industrial electricity is greater. I want Director Lin to think of a way. Zhang Zijian said very sincerely.

"Little brother, it's not that I don't help you, this matter is too difficult. Even if I want to help you, the Municipal Electricity Bureau will not agree, do you want to know how much electricity is used in an industrial zone? Ten kilowatts to thirty kilowatts. Add in the civil electricity in your town, and it will reach more than 40 kilowatts. Do you know that this electricity consumption has reached the annual electricity consumption of our county in the 80s, and to say something unpleasant, even if you want to meet your power supply demand, do you know how much it costs in the city and how much you have to change the line? Whether the power plants in the six cities can be driven is another matter. ”

After listening to Lin Jiefang's statement, Zhang Zijian frowned slightly and said, "Then we have to find a way to solve it."

"Hehe, you listen to me first." After Director Lin finished speaking, Zhang Zijian listened calmly: "The Tanjiakou Power Plant of the Six Cities was planned by the Administrative Office of Province A in 1958, and the Mechanical and Electrical Bureau of Province A officially established the Preparatory Office of the Tanjiakou Power Plant of the Six Cities in October 1959. Located on the loess market of Tankou Town, about 20 kilometers southwest of Liushi, it is imported by East Germany with an installed capacity of 1,500 kilowatts. Construction began in mid-October 1959 and was installed by the Engineering Division of the GD Provincial Electric Power Installation Company. After more than a year of hard work, the power plant was completed in early 1961. On January 31, 1962, after the last 72-hour continuous trial operation, it was officially put into operation on February 18, 1962, and sent telegrams to six cities, three districts and four counties to our county. Because the unit is a foreign unit, the personnel experience is insufficient, the generator set vibrates greatly in operation, and can not carry full load. In order to continuously expand production, the second phase of expansion was carried out in 1964 with the addition of a Soviet-made 1,500 kW unit. After more than a year of hard work, it was officially put into trial operation in December 1966. In October 1966, the Tanjiakou Power Plant carried out the third phase of expansion, and added a Soviet-made 1500 kilowatt unit of the same type, and the maintenance team of the A Provincial Electric Power Bureau began to install it in October 1968, and it was officially put into operation at the end of that year. So far, the three imported 4,500 kilowatt units of the power plant can generate electricity at the same time to transmit power to the power grid of the four counties in the 63 districts. At the end of 1972, the expansion of the wire drawing workshop began, and at the same time, the construction of the wire drawing workshop, the manufacture and installation of reverberatory furnaces, calenders and wire drawing equipment were constructed, and the production of rolled wire stranded wire began in August 1973. The main business of Tanjiakou Power Plant is mainly power generation. In the process of power generation, due to the completion of the South Power Station for power generation, the Tanjiakou Power Plant is in a standby phase modulation state. Our six cities also produce coal, but the coal punch card is not enough, because the coal required for production has to be transported from other provinces, but from the actual production process, the equipment is worn out, the number of people is employed, the cost is high and unsafe, so in July 1984, the A Provincial Electric Power Industry Company decided to restore the original state. The three units in the plant are standby units according to the requirements of the superiors, and the system needs to be turned on at any time, and the two generator sets can also be operated in phase. In January 1963, after the Electric Power Bureau of A Province completed the change of the frequency of Haikou Power Plant from 60 Hz to 50 Hz, Tanjiakou Power Plant initially formed a power supply system in six cities, three districts and four counties, and increased the voltage of each line to 35 thousand volts. ”

Zhang Zijian listened to Mao thoroughly, he came to find a solution, not to listen to the history of the development of the power plant, how to give him a solution, the power plant in the six cities is also large enough, 45 million, and it is really enough to give them 500 million, how can it be difficult? Do you have to show the card for a while, delay the time, and fight on the bucket before allocating power to him? Thinking of this, Zhang Zijian looked at Lin Jiefang with a frown. Waiting for him to explain, I have listened to you so much, you have to explain to me, how to solve the problem of electricity in Weidong Town.

Lin Jiefang smiled at Zhang Zijian, who was frowning, and said: "Don't look at the two major power generation in the six cities, over the years, the three districts and four counties have been developing, especially the industry, and the heavy industry in the six cities is about seven, and their electricity demand is also very large. Therefore, the power supply of the six cities is also very difficult. ”

Zhang Zijian interjected and said: "Since you are struggling, you are expanding."

"Hehe, a power plant is a little more polluting. The area around the six cities is not suitable for building factories. The city has plans to build a larger power plant. We are also working on site selection, and we may be able to meet the needs of your town in a few years. ”

"We can't wait for the power plant to be built, we can't afford to wait, we still have to think of a quick solution." Zhang Zijian said bitterly. At the same time, he took out his own cigarette and lit it for Lin Jiefang, the cigarette is not a good smoke, soft and Hongta Mountain. Now Zhang Zijian is very low-key, and his smoking has also been lowered, and he no longer shows off any good cigarettes, and he also smokes by himself.

Lin Jiefang shook his head and said, "It's difficult, unless you build a power plant yourself." I have the approval here, you can take a look, the higher authorities have mentioned that when the demand for electricity in county-level cities is too high, county-level power plants can be built. In fact, many county-level cities built their own power plants in the 50s, but we didn't build them at that time because the Tanjiakou power plant in the six cities was not necessary. ”

Zhang Zijian opened his mouth wide and asked in surprise: "You mean that we won't build our own power station, right?"

"That's not what it meant. At that time, our county was a well-known poor county in the country, and there was little electricity, and there was no plan to build a power station. Under the leadership of County Magistrate Hou and you, changes have been made, and with the future development, the demand for electricity is necessary, either to build a power station by yourself, or to wait for the state to build a second large-scale power station in our six cities. Lin Jiefang stood up and walked to his own work, and after looking for a long time, he found a text and handed it to Zhang Zijian.

Zhang Zijian opened it and saw something, about the construction of the power station in the seventies, the approval document is there, but it is too old. Besides, Zhang Zijian really doesn't have that strength. If you need a car to move, you can just spend a little freight, but you don't need to buy a truck just because you want to move

But Zhang Zijian asked: "How much does it cost to build a power station?" ”

As soon as Zhang Zijian said this, Lin Jiefang became interested and said, "It doesn't cost much." According to the future development of our county, small power stations will not work, and medium-sized power stations will be directly used. I estimate it to be between 2 billion and 4 billion. ”

"I, this is called not spending much, I tried my best to collect money abroad, but I didn't get so much, and there were not so many people in the Soviet Union, you are two or three billion yuan in one mouth, I really think that the sky is dropping money" Zhang Zijian cursed in his heart. At the same time, Zhang Zijian also said: "Do you think our county's finance can build such a power station?" ”

Lin Jiefang also nodded and said: "No, but I think you and County Magistrate Hou have this ability, first of all, you have a lot of starting capital, I have heard about this." Second, you can take out loans, and third, you can ask for policies or funds from above, so two or three billion yuan can still be solved. ”

"You're talking lightly. You know how much effort I put into the construction of this town, just the eight or nine billion foreign loans in our county, I know how much risk I take. What you are talking about is not the current way to change the status quo, I can give out a few million, as long as I can ensure the civil and industrial electricity in Weidong Town, this money will be spent on billions of funds, let me say Hou Liguo, as far as our newly appointed municipal party secretary will not agree to this project. How much ability to make how much strength, let's not play with small horse-drawn carts, good days just saw the signs, once on this project, the pit is the people of the county, I think wait a few years, wait for the county's finances to be a little better, and then consider this matter"

"Then I really have no choice, after all, the power grid line is only 35 kilowatts of output, and it is many years old, once the overload will have an accident, this responsibility is not your back, it is my back. I build a planned power supply, a planned power supply for this area today, and a planned power supply for that area tomorrow to ensure the safety of power equipment. After Lin Jiefang finished speaking, he walked back to his desk, took out a plan, and handed it to Zhang Zijian to read.

This guy looks a little hairy, and the official Weidong Town planned telegram jiàn is still in draft and has not been sent out. Zhang Zijian looked up at Lin Jiefang and asked, "This, are you going to put it down?" ”

"Yes." Lin Jiefang nodded and said.

"Director Lin, you can't send it, as soon as you send it, the power supply station in Weidong Town will have a power outage on the construction site, do you know how much the loss will be on this day? Tens of thousands, you don't feel distressed, I feel distressed," Zhang Zijian smiled bitterly and said.

Lin Jiefang said to Zhang Zijian with a bitter face: "Mayor Zhang, I beg you, your loss of tens of thousands a day is still small. Do you know how much a transformer I cost? Hundreds of thousands of units, you Weidong Town will burn it for me, who will I go to report the account, the finances of our county power supply bureau are also limited, you scrap two or three more units for me, and we will all drink the northwest wind. So, I'd rather watch you lose, and I don't want to lose. ”

"Damn, this old thing, it's really not a thing, first fooled me into building a power plant, and when I saw that it didn't work, I just talked about it, and I went around for a long time, isn't it just to control electricity? Talking about so many difficulties made me retreat. It's not a thing. Zhang Zijian scolded in his heart.

Scolding and scolding, the matter still has to be solved Zhang Zijian asked: "Can you change to a transformer with a larger capacity?" As for the cost, our town could have thought of a little. "Zhang Zijian was forced by this old thing to have no choice, who made his family an electric tiger, and he didn't have the strength to build his own power station. can only look at other people's faces, people don't want to change you, what can you do, besides, even if Hou Liguo comes, he can only mediate the conflict, and the matter cannot be solved. After all, it is not a direct supervisory unit, and people have their own vertical bosses. A