Chapter 375 is starting to burn money again.
The money in the development account has returned to 200 million, and it is still 200 million and tens of millions.
With this sum of 80 million money, Chengxin, who has a lot of money, directly found the project leader of the glass plank road and asked them to go back and calculate how much money was needed for the elevator up the mountain.
Not only have elevators been added, but several more items have been added, plus places for tourists to rest and eat.
After all, there are many projects, and you may have to play for a long time.
In case you are tired, there is also a place to rest.
When you're hungry and thirsty, you also have a place to eat and buy water, right?
The person in charge did not delay at all, and immediately called someone to come and measure.
The price will have to wait.
Two days later, Manager Chen came to Chengxin's house again, followed by the person in charge of the glass plank road.
"Boss Zhong, the cost of your added project is 30 million, of which 20 million is the cost of the sightseeing elevator."
"The remaining 10 million is a few additional items. There are also restaurants, kiosks, and temporary resting places for tourists. ”
The person in charge of the glass plank road spoke first.
"Okay, then tomorrow I'll take the lawyer to the Second Bureau to sign the contract."
Chengxin had already been mentally prepared, and the difference between him and his budget was not too big, and he didn't care much.
"Uh, okay."
Chengxin promised so quickly that the other party almost didn't react.
After being stunned for a moment, he immediately responded.
After completing the addition of the glass plank road, the next thing is the resort and the ancient street.
"Boss Zhong, let's talk about the ancient street first."
"This street, not counting the two inns and hotels, has a total construction area of 22,500 square meters."
"This kind of ancient building, per square meter, our quotation is 2,000 yuan."
"Two thousand yuan per square meter, including the street in the middle, the sewer."
"Electricity and water in every room."
"The total price is forty-five million."
"And what about two inns and hotels?" Cheng Xin asked.
This thing is essential for hotels, otherwise tourists will have no place to stay in the village for two more days.
The star-rated hotel Chengxin never thought that it would be enough to build two inns and an ordinary hotel under construction.
"For three hotels with a total of 500 rooms, our offer is 30 million."
"So there's a total of 75 million on this side of the street."
Seventy-five million, this price, Chengxin thinks it is a bit high.
However, Chengxin didn't open his mouth now, and after the resort's offer was finished, he would see if he could lower it.
"What about the resort?"
"Resort?"
"There are a total of 200 small units, with a total area of 12,000 square meters."
"Because we want to renovate, our quotation is 191 square meters."
"The total price is 22.8 million."
"The mountain villa offers fifteen million."
"Three hundred and seventy-eight million in total."
"In addition to the surrounding greenery, the three projects add up to a total of 125 million."
The resort and the ancient street will be built not far away.
At the same time, they are all built on the side of the barren slope, and the surrounding needs to be greened, otherwise it looks like the surrounding desert is too ugly.
The extra 10 million yuan is the cost of greening.
If it is outside, more than 10 million, how many square meters of area do you have to green? Thirty thousand? Fifty thousand?
However, it is not possible on the barren slope, and Wan needs to buy a lot of dirt from the outside to bring it in.
Otherwise, on the other side of the barren slope, you may plant something and die.
"125 million? Manager Chen, I have worked happily with you in the second game. ”
"Don't you think that on the side of the glass plank road, I didn't bargain much, so I was wronged?"
"I can't afford the price."
Chengxin really can't accept this price, don't look at the development company's account There are more than 250 million in the account, but the money is like flowing water!
The glass plank road has to be deducted 49 million, and there is still 210 million left.
If you spend 125 million, there will be about 85 million left.
That's a lot of money.
However, there are still many places to spend money.
The hotel does not have decoration costs, and the resort has to buy all kinds of home appliances.
And there are resorts and tourist attractions, so you have to get a hospital emergency situation?
This sum of money has to be spent.
Therefore, Chengxin wants to save and compress funds.
"Boss Zhong, we have already made a very low price for this price."
"Especially the greenery."
"This is a barren slope in your village, and we still need to find a relationship to buy soil from the outside, which costs a lot."
Source change app】
"Other ancient buildings have to use wooden planks to wrap the outer layer, so the price must be high."
Manager Chen explained to Chengxin the same way, and almost said that they were going to lose money.
"Manager Chen, I don't press much, one hundred million a little, if it works, we will sign the contract."
"Also, between the two mountain ranges, there is a lot of dirt piled up, and it should be no problem to lay one or two hundred thousand square meters, and there may be more."
"When you do greening, you go straight there and pull it."
When the reservoir was built, Chengxin paid a lot of money to concentrate the soil in the ravine and pile up more than a dozen dirt mountains.
"This, Boss Zhong! You've cut more than 10 percent of this time, and we can't do it. ”
Manager Chen was slashed by Chengxin's knife.
"Manager Chen, don't cry poor."
"According to your quotation, all the projects in my village add up to 190 million, and I don't have that much money."
"If you don't accept 100 million, then I'll look for another engineering company to take a look."
Chengxin is not scaring the other party, if the other party really can't do it, Chengxin can only be replaced.
Manager Chen fell into deep thought.
In fact, their offer is a bit inflated.
In order to deal with Chengxin's bargaining.
If they really do it at this price, their profit can reach more than 20 percent.
In other words, 125 million, they can earn 267 million.
According to the 100 million given by Chengxin, they can also earn 123 million in addition to the saved green soil.
Manager Chen pondered for a long time, as if he had been struggling for a long time, and finally agreed to Chengxin's offer.
That expression, as if he had lost hundreds of millions of dollars in this life.
The price was negotiated, and Chengxin also asked the other party to prepare a lawyer, and tomorrow he took his lawyer to the second bureau to sign the contract.
Manager Chen and his entourage left, and Chengxin also drove to the city to find a lawyer.
I didn't go back to the village, so I stayed in the city for one night.
The next day, with a few lawyers, in a conference room of the Second Bureau, two contracts were signed, one for the resort and the ancient street.
There is also a modified glass plank road project.
The payment for the project was paid in four installments.
The first sum is 50 million, the middle two are 25 million at a time, and the last 10 million is given one year after acceptance.
On the side of the glass plank road, it is also four times, the first one has been given, and the next two have been given according to the progress of the project, one of which is fifteen million.
After receiving it, there are still as many seizures as last time.
The contract was signed, the first batch of project money was given, and within a few days, various construction machinery of the Construction Department of the Second Bureau drove into the village.
The construction site of the resort and the Rugu Street is opposite the Chengxin house, 200 meters in the direction of Chaishan.
It's also more than a hundred meters from the asphalt road.
This position was decided by Chengxin after thinking about it many times.
Originally, I wanted to build the resort on the Shibayama side.
Later, I thought that it would be next to the ancient street, and if it was all built there, it would be too far away from the glass plank road.
And I am afraid that it will be too close to the lake, and if there are too many people, it will affect the habitat of various water birds inside.
So in the end, it was decided to build it on this side of the village.