Chapter 640: Start the Xin'an Line

This is the first train of JF200A EMU, the real first train!

This train can be traced back to before the completion of the Jiufang EMU factory, it completed the vehicle assembly in the vehicle assembly workshop of the Red Star Factory, and also completed the factory in the Red Star Factory, and then has been carrying out the operation assessment test on the Beijing-long line, and it has completed the operation assessment of 500,000 kilometers excellently.

It successfully completed its mission!

It returned to Jiufang EMU, where it will be overhauled and refurbished, and then delivered as one of the 32 JF200A EMUs ordered, and then run on the Beijing-long line to carry passengers.

Seeing that the train was slowly pulled into the vehicle assembly center and stopped steadily on the rails in the assembly center workshop, the whole scene erupted in warm applause.

Everyone greeted him as if they were heroes.

Not only are there a lot of workers and technicians on standby, but even Ding Liang and other middle and high-level officials are here to welcome its arrival.

After a long time, the applause gradually stopped.

A middle-level manager next to him said to Ding Liang: "Mr. Ding, it is our great hero, its outstanding performance has won great honor for our Jiufang EMU Company, and we will definitely make it look new here." ”

Ding Liang nodded lightly.

After the train is overhauled and refurbished here, it will become a brand new new car, but the number will remain the same, and it will still be the number of "JF200A2002001".

The JF200A EMU with the word "2002" in the number is the only one of its kind, and it is unique in that it was manufactured last year.

The train arrived at Jiufang EMU and began a series of overhaul work, which will carry out a thorough overhaul, so that the old is as good as new, and after about a month, it will complete a major transformation here.

Ding Liang looked at the train with satisfaction, and thought in his heart, even if there is an overhaul task for this train, we still have to complete the production and delivery of a total of 4 EMUs in December.

There are a total of 32 train orders, and Ding Liang wants to complete half of the delivery at the end of December, that is, the delivery of a total of 16 trains, so that they can run on the Beijing-long line for the upcoming Spring Festival.

The production and manufacture of 4 trains per month shows that Jiufang EMU has begun to take shape and production capacity. According to the production volume of 4 trains per month, in a few months the order for 32 trains will be fully delivered.

Ding Liang thought in his heart, if the JF200A EMU shows its skills during the Spring Festival and makes an outstanding appearance, it is estimated that the country will place another order after the 32-train order is about to be delivered.

Red Star Factory.

Xie Zhenhua heard the report. Li Hui personally knocked on the door and entered Xie Zhenhua's office and reported: "Mr. Xie, the first JF200A EMU we produced and manufactured has returned, and it has been parked in the vehicle assembly center of Jiufang EMU Company, can you go over and take a look now?" ”

When he learned that the train was about to return, Xie Zhenhua immediately said that he must go and see the train.

After listening to Li Hui's report, Xie Zhenhua didn't say a word, put down all the affairs in his hand, and waved his hand: "Let's go, let's go over now, go to Jiufang EMU Company, and take a look at our EMU that has passed 500,000 kilometers of operation assessment." ”

Not only Xie Zhenhua, but also several middle and high-level executives of the Red Star Factory went together.

They are extremely proud, because this train was originally assembled and shipped out of the Red Star Factory, and now it has completed the operation assessment excellently, and it will definitely go to see it.

Everyone arrived at Jiufang EMU Company and went straight to the vehicle assembly center of Jiufang EMU Company. When I walked into the vehicle assembly center and saw this EMU, I was slightly excited.

Xie Zhenhua strode to the front, and soon walked to the front of the EMU, watched it with great interest, and said with a sigh: "You see, it is still so beautiful, it still looks relatively new, and you can't see that it has passed the operation assessment of 500,000 kilometers." ”

"yes, almost like new!"

After looking around the EMU, everyone finally boarded the train, and looked carefully in each carriage.

The more I watch, the more satisfied I become, and the more I look at it, the more I like it.

Even after 500,000 kilometers of operation assessment, everyone seems that this train is still good, indicating that the quality of this train is very good.

What makes them extremely proud is that this train was originally manufactured in the Red Star Factory.

After gladly watching this EMU, everyone has time to take a good look at other EMUs that are being assembled, they are all JF200A EMUs, and there are many cars that are being assembled in the whole vehicle.

Seeing the brand-new and beautiful EMUs, Xie Zhenhua said with satisfaction: "Mr. Li, our EMU production has gradually become a scale, how gratifying this looks." ”

Li Hui said: "Our current production capacity is gradually rising, in October we produced 3 EMUs, in November a total of 4 EMUs, this month our plan is also 4 trains. ”

Xie Zhenhua said in surprise: "At this production and manufacturing speed, the order of 32 EMUs will be fully manufactured and delivered in a few months." ”

Li Hui said: "We also plan to complete the delivery of these 32 EMUs in a few months, and we are fully confident that these EMUs that have been delivered should perform very well during the Spring Festival, and after the Spring Festival, it may not be long before new orders are ushered in." ”

OMG!

Many middle-level officials of the Red Star Factory looked at Li Hui in astonishment, thinking that they had misheard. Jiufang EMU will usher in new orders soon after the Spring Festival, and this development situation is also very gratifying.

Xie Zhenhua was not stunned, only a deep joy in his heart.

Jiufang EMU Hongxing Factory has a 45% stake, the better this company develops, the happier Xie Zhenhua is, he very much hopes to see the vigorous development of Jiufang EMU.

"Mr. Li, you work hard and make great achievements here. ”

"Well, we'll try. Li Hui replied.

Xie Zhenhua and others stayed in Jiufang EMU for at least two hours, not only in the vehicle assembly center to see the EMU that has completed the 500,000-kilometer operation assessment, but also to see the vehicle assembly of other EMUs, and they also went to several EMU parts manufacturing plants.

Not only did I see the full production and manufacturing of JF200A EMUs, but also saw a lot of parts of JF160A EMUs being manufactured.

Li Hui told Xie Zhenhua and others that around March next year, the first JF160A EMU will also begin to assemble the whole vehicle, and by that time, Jiufang EMU will have a new member in the EMU family.

Everyone was stunned again, and sighed in their hearts, the development speed of Jiufang EMU is really fast, and the JF160A EMU will be able to start the assembly of the first train in March next year.

Xie Zhenhua's heart was relieved and full of expectations.

He knows that the market prospect of JF160A EMUs is broader, and they are more suitable for our domestic ordinary railway lines, and they are specially designed and developed to adapt to ordinary railway lines.

Although they are slightly slower than the JF200A EMUs, they can also reach about 160 kilometers, which is much faster than ordinary trains, and they can carry many passengers at a time, often in 16 cars.

Perhaps by next year, or the year after that, there will be a lot of JF160A EMUs on domestic railway lines, and they will run on ordinary railways together with ordinary trains.

After visiting Jiufang EMU Company and returning to the Red Star Factory, sitting in his office, Xie Zhenhua fell into deep thought.

The good development situation of Jiufang EMU Company has given Xie Zhenhua infinite motivation, since Jiufang EMU Company can develop so well, then Hongxing Factory can also develop rapidly.

In his mind, he remembered the new AC high-power electric locomotive that was about to be developed, which is more advanced than the DJ4 AC electric locomotive, and the country has prepared to establish a project and prepare to carry out design and development, and initially set this electric locomotive as a harmonious electric locomotive.

Thinking about this new type of electric locomotive, Xie Zhenhua's mood is slightly bowed, because it is a more advanced AC electric locomotive than the DJ4 type.

Xie Zhenhua even thought in his heart, I want to take the initiative to ask Ying to take over the trial production task of this new electric locomotive, and assemble the whole vehicle of the first train in the Hongxing Factory in the future.

Hongxing Factory will also assemble a strong technical research and development team to participate in the development of this new electric locomotive......

……

Xin'an high-speed railway line.

This is a high-speed railway built in China, on this fast line, the first EMU has been running since a few months ago, and it has run more than 200,000 kilometers on this line, and its performance is very good, which can be described as amazing.

It has also set the highest operating record in China on this high-speed railway line, with a maximum speed of 297.6 kilometers per hour, close to 300 kilometers per hour.

After 200,000 kilometers of operation assessment, this high-speed railway line has also reached the stage of passenger operation. At the starting station of this rapid railway, another brand new JF200A EMU slowly began to enter the station, and then stopped steadily next to the platform.

Soon after, the Xin'an Express Railway Line will enter the stage of passenger operation, which is also the second railway in China to have EMU passenger operation after the Beijing-long line.

It is also a little different from the Beijing-long line, it is a special line for rapid railways, there is no operation of ordinary trains, and only EMUs will run on this line in the future.

The newly built station also looks much warmer and no longer as deserted as before, with a total of three JF200A EMUs parked on the tracks in the station.

That's right, there are indeed three columns!

On the tracks of the railway station, three JF200A EMUs are neatly parked next to platforms 1, 2 and 3.

………

Today's three watches, the second one is sent!

https:

Genius one second to remember the address of this site:. Mobile version reading URL: m.