Chapter 319: Starlight Speed, the installation was completed in two days
Xu Xiuzhen was pleasantly surprised that for people who had no design concept, there was a set of templates that could be presented in front of her eyes, clearly expressing what the products she was buying looked like.
It really couldn't be better.
No matter how good the picture is, there is no peace of mind from looking at the real thing.
Xu Xiuzhen was very excited in the model room, looking left and right, touching this way, touching that.
Lu Wenliang smiled and took her around.
Finally, she was taken to the kitchen and visited the basket, pendants, appliances and accessories.
In the bedroom, I saw the drawers, lattice shelves, trouser racks and other parts in the wardrobe that my nephew said.
There is no need for Li Wenliang to continue to introduce, when she sees the real thing and understands the role of these accessories, she directly places an order with Xinghui Home.
The new hardware accessories are not expensive, all down to 2880 yuan.
In fact, she also likes a full set of soft furnishing accessories for the home, but unfortunately the price is relatively high, and it costs tens of thousands, and she is a little reluctant.
Later, only the hardware accessories part was added.
The two returned to the booth.
A final agreement was reached on the total number of products, the category of products, the number of products and the price of products.
The part of the whole house that exceeds the projection area of 0.78 is exempted from Xinghui Home as an opening discount.
made her happy, after all, there are more than 1,000 yuan.
At last!
Xu Xiuzhen officially signed the contract and paid the corresponding amount.
After completing the contract, she left the Xinghui Home Furnishing store with a cheerful face.
Xinghui Home also intimately called a taxi for her and paid the fee.
After Xu Xiuzhen left, Li Wenliang's team returned to the 2nd floor and held a short meeting to summarize some details of this order.
Especially in terms of cutting beams, wrapping columns.
One of the assistants nodded incessantly.
The three assistants brought by Li Wenliang are two room measuring assistants and a CAD painting assistant.
After a short meeting, the CAD drawing assistant started to get busy.
He first fine-tuned the data obtained from the house measurement on the floor plan transmitted by the decoration company.
Then, in the area involving home furnishing products, the simple product floor plan of the decoration company's calligraphy and painting will be replaced with the floor plan prepared by Xinghui Home.
Because the product Xu Xiuzhen chose has already been preset.
Therefore, the CAD painting assistant is very convenient to deal with the drawings, and the work he has to do is to find the relevant product number among the many drawings.
Open the CAD and copy and paste it below the general floor plan.
There are 8 products in total, and it takes less than 5 minutes before and after.
The product is then fine-tuned according to the actual product size.
For example, the 2-meter-1 shoe cabinet uses a two-meter preset, and the extra 100mm of communication with customers is added to which part?
In the remarks of each product request form, there is a clear description.
Fine-tuning is also very simple, with a single incremental piece and less than 30 seconds before and after.
It is worth mentioning.
On the sealing plates around the product, Wei Zhijie used the double-seal cross-wall method that will only appear after 2018.
For normal products, if the height is 2.48 meters, the general product is made into 2.4 meters, and the top sealing plate is 8 cm.
If the ceiling of the customer's house is tilted, one end is 2.47 meters, and the other end is 2.48 meters.
It is necessary for the installer to be on site and cut off the excess part according to the inclination.
Because there is no way to carry large carpentry equipment on site, you can only use jigsaws, or angle grinders to replace woodworking saw blades for cutting.
This will not only cause a lot of wood dust on site, but also form a very harsh noise.
And Wei Zhijie directly upgraded the practice of the top cover version.
Make two 6 cm high covers.
The front sealing plate is flush with the door panel, and the rear sealing plate can be adjusted according to the actual height of the top, and the last one after the other, the two sealing plates are fixed.
This will allow for a two-centimeter gap between the front roof sealing plate and the ceiling.
But it saves the trouble of on-site cutting.
In the sales can be guided with customers, the tilt of the ceiling is not the fault of the home enterprise, on-site cutting will cause damage to the board, when the board has an exposed surface, even if it is mildew and moisture-proof, it will cause damage to the board for a long time.
And do this kind of double seal plate staggered. Although there is a gap of 1~3 cm on the top, the whole practice is more environmentally friendly.
After using this process of staggered double sealing plates.
Not only is it easy to install a home, but it can also be remedied to the greatest extent possible if there is a measurement error.
CAD drawing assistant after adjusting the size of 8 sets of products.
Open the product purchase details, and restore the form handwritten by the main designer and the customer in the computer for 1:1 restoration.
Then sum the corresponding projection area, fill in the relevant unit price of the product, and find the sum of the product price.
Then fill in the customer's new products clearly.
The part of the product projection clarifies the settlement price between Rastar Home Furnishing and the decoration company, and the new part of the customer clarifies the rebate of Rastar Home Furnishing to the decoration company.
Fill in this part of the data in the product purchase contract.
Finally, the product CAD drawings, product price schedules and product purchase contracts are sorted out and submitted to the chief designer for review.
If there are no errors in the documents, you can upload the relevant documents to the attachment of the order design results through the Rastar Home Service Platform.
Send it back to the renovation company for confirmation.
After the decoration company downloads the three documents, it conducts a design review and financial review.
Both audits were confirmed, and then the order department of the decoration company officially issued the order to the Xinghui Home Furnishing Factory.
On the morning of March 20th.
Li Wenliang led three assistants to set off at 9 a.m. and arrived at the owner's home at 9:30 a.m., and it took another half an hour to measure the whole house.
At 10 o'clock, return to the commercial and residential villas of Haishi Banshan Peninsula, Xinghui Home Furnishing Direct Store.
The service started at 10:30, the contract was signed at 11 o'clock, and then the three documents were sorted out.
At 11:30, the renovation company is sent back for confirmation.
Because the first order was more exciting, the decoration company cooperated very well, and it only took 20 minutes before and after to confirm the order and convey it to the Xinghui Home Factory.
At 11:45, the order operation department led by the senior sister Li Jia officially received the first home order issued by the decoration company.
After the order review department downloads and reviews the three documents, no problems are found, and the order is officially received after 10 minutes and submitted to the order splitting department for dismantling.
After the received home orders come to the order splitting department, the auditors of the order splitting department will also conduct a CAD audit on the products.
After confirming that it is correct, submit it to Lin Chuanmu as an order splitter to dismantle the order.
If the order splitting software is not preset, the order splitter receives the CAD drawings.
It is necessary to analyze the product structure first, and then according to the characteristics of the product, first pull the outer frame of the product, and then arrange the vertical plate, fixed shelf, movable shelf, back plate and other components in the product.
Finally, according to the functional parts, add drawers, lattice racks, trouser racks, clothes rods, etc., and hardware accessories.
Finally, add door panels, handles, sealing plates and other components.
According to the normal dismantling method, it takes about half an hour to disassemble a set of household products, and taking Ms. Xu Xiuzhen's order as an example, 8 products need to be dismantled for 4 hours.
And after the product is preset.
What the order splitter needs to do is to enter the product model in the product price list into the search box.
You can mobilize the product and preset the order splitting file.
After the order splitting file is mobilized, adjust the parameters of the product according to the product price schedule, such as product size, cabinet color, door panel color, handle, hardware accessories, etc.
The whole adjustment time does not take more than 5 minutes.
In this way, the order splitting process can be increased from the past 4 hours to 40 minutes.
The efficiency has been increased by 6 times.
This is the power of presets, of course, presets need to have a very strong foresight, need to have years of experience summary, in order to create a preset product that is very popular in the market.
After the order splitter sorts out the dismantled documents, submit them to the supervisor for review.
After the review is completed, it will be submitted to the planning department for the dismantling of the order.
In this process, the software will divide the order according to the characteristics of the product.
What products need to be outsourced?
Which products are homemade.
Which products have been made semi-finished products in stock.
What products are already in stock?
The reason why Wei Zhijie dares to press a projection area of 980 yuan to provide the whole house customized products and services for the decoration company, including precision, labor, materials, transportation, installation, and after-sales.
It's because he made a whole set of presets.
Like Xu Xiuzhen's order, in the width direction, only the shoe cabinet and a set of wardrobes have increased by 10 cm.
Others, such as TV cabinets, sideboards, bookcases, and two wardrobes, are all included in the standard preset products.
And this part of the products, Xinghui Home Furnishing is made of bulk inventory. For example, the 2.8 meter TV cabinet has 100 sets of pre-production inventory.
When a single set of products becomes multiple sets of products, centralized production is carried out.
In the cutting process, you can superimpose production.
The drilling process can be used through the test row drilling rig, and 8~12 plates can be played in one minute.
Different from the production of a single project, when the production of a single project, the stacking of the cutting and stacking does not stack the price.
However, the preset production, stacking 5 layers only gives the price of 2 layers.
In this way, you can save a lot of time and labor, not to mention that only two layers of labor are given. Because it only needs to be opened without a brain.
A heavy-duty reloading electronic saw master, with two small workers, works 8 hours a day and earns 15,000 yuan a month, which is easy.
Because of the relationship between intelligent three-dimensional warehouses.
The data is interacted with the order management system data of the planning department.
In the order planning process, it will be judged according to the size of the product, the color and hardware involved, and whether there is a preset inventory in the warehouse.
If there is a preset inventory, the order will automatically lock the in-stock products in the warehouse, indicating that the products have been completed.
What the planning specialist needs to do is to confirm this part of the product and submit it directly to the warehouse to issue instructions for delivery.
The remaining products that do not match will be disassembled according to the condition of the parts. For example, the 2 meter 1 shoe cabinet matches the height and depth direction.
The only mismatch is the width direction.
At this point, the software will identify the parts that need to be remade, such as the top and bottom plates, the middle shelf and the back plate.
widened door panels, etc.
These parts are re-produced, while the other parts are pre-set in the warehouse as semi-finished products.
For example, side panels of the same depth and height.
The workshop also uses the method of superimposed cutting, first cutting, edge sealing, and placing it in front of the hole rowing link.
When the order is diverted, the sorter enters the semi-finished product inventory warehouse, extracts the relevant plates, and scans the code to enter the punching link after labeling.
In fact, there are very few plates that need to be reproduced in such a decomposition.
Of course, if the above-mentioned product presets do not have strong planning capabilities, the preset products do not meet the needs of the market terminal.
That would presuppose a loneliness.
In order to make the preset product size and structure in advance.
In fact, Wei Zhijie took the house type information of many real estate projects in Qiong Province through Wu Jianguo.
And according to the house type information, the corresponding summary was made.
In the product series, it has also been standardized, such as the new Qiong provincial style, and the cabinet body has two kinds of yellow and white.
Other styles are only 2~3 kinds of cabinet colors to choose from.
The size has also been optimized, for example, the TV cabinet is only made of 2 meters 6, 2 meters 8 and 3 meters 2 sizes, the same style, each made 100 stocks.
If the cabinet is set in two colors, the stock of these three sizes is 600 sets.
This is also where Wei Zhijie is bold.
And the cabinet has also been preset.
There are not many wall cabinets, base cabinets, neutral cabinets, high cabinets and standard cabinets on the counter.
Such as single door cabinets, double door cabinets, double drawer cabinets, triple drawer cabinets, single door corner cabinets, double door sink cabinets, double door stove cabinets, etc.
The basic preset was also made, because the plate is 1 meter 22 relationship.
The width of the door panel should be set to 400 mm optimally.
Therefore, the preset cabinet size is based on the 400mm base system. For example, it is 400mm for single-door cabinets and 800mm for double-door cabinets.
In the designer training, the design scheme is required to be closer to 400mm.
There are only two preset cabinet decors.
Each cabinet, each size, is also preset with 100 sets in stock.
The dimensional error of the field is adjusted to one of the cabinets, or the side sealing panels.
When Xu Xiuzhen's products were sent back to the factory, it was close to noon.
At 1:30 p.m., the commissioner of the planning department will decompose and divert the order and issue the production order.
After the workshop receives the production order, the intelligent plate bin will prepare the plate materials at the same time.
Xu Xiuzhen's product orders need to start from the cutting process to produce not many plates, and no more than 30 pieces are fully calculated.
Other panels can be punched directly from the semi-finished product silo of the panels.
It took 10 minutes for the master to cut the material, 20 minutes for the edge banding, and an hour to punch after all the plates converged into the punching link.
Then sorting, trial assembly, hygiene, packaging, and finally scanning the code into storage.
From 13:30 in the afternoon to 17:30 in the product, exactly 4 hours.
At the same time as the production of plates, the hardware warehouse was also picking up and matching hardware packages, and it took two hours to put them into storage.
Before getting off work, the order commissioner of Huaxun Decoration received an order from the Xinghui Home Service Platform, Ms. Xu Xiuzhen, and the prompt that it could be delivered and installed.
The order commissioner was directly dumbfounded, thinking that the system was malfunctioning, and hurriedly contacted the order operation department of Xinghui Home.
After inquiring about the production records of the system, the commissioner of the order operation department made it clear that it could be distributed and installed, and the order commissioner of Huaxun decoration was directly stunned on the spot and was speechless for a long time.
Then the whole Huaxun decoration was a sensation.
The senior management of Huaxun decoration and the employees who watched the excitement drove to Xinghui Home Furnishing Industrial Park to see the authenticity of the order.
After all the products were put into the warehouse, they were shipped out of the warehouse and entered the logistics waiting area.
I learned that Huaxun decoration senior management and employees came to visit.
Senior sister Li Jia received her.
When seeing the goods in the logistics waiting area, Huaxun decoration and his party collectively lost their voices.
In the end, I don't know who it is.
Swallowed a sentence: "Fog grass!" ”
As a result, the sound of "fog grass" at the scene continued.
Huaxun Decoration's order commissioner used the computer of Xinghui Home Furnishing on the spot to operate the instructions to determine the distribution and installation.
Within 5 minutes, a 7-meter logistics distribution vehicle came to the loading and unloading platform.
The loading dock starts loading.
Xu Xiuzhen was very happy this afternoon, and she maintained a high level of enthusiasm for the household products that will be installed in seven days after the contract.
She ran to the furniture store in the afternoon and talked with the proprietress of the furniture store for more than an hour.
On the one hand, it is to show off that you have picked up a big bargain.
On the other hand, it was agreed with the proprietress of the furniture store that the furniture would be delivered after 10 days.
In the afternoon, she lingered in the soft decoration accessories area, trying to restore the soft decoration accessories she saw in the Xinghui Home Furnishing direct store.
The time came to 5:45 p.m.
She received a call that started with 800.
This phone number is very familiar, and when she signed the contract for household products, there was this phone number on the last page, which was the delivery number of the headquarters of Xinghui Home.
She answered with some surprise.
On the other end of the phone, a delivery master's voice came: "Hello Ms. Xu, all the household products you ordered in Xinghui Home have been produced. ”
"Receiving Huaxun decoration confirmation, our company will deliver it to you within half an hour, and arrange for installation tomorrow, I don't know if you are convenient to come and open the door."
"Oh, it's done? What! Production is complete! Delivered within half an hour? You're not mistaken, are you? ”
"Yes, Ms. Xu, make no mistake, after half an hour, it will be delivered to the door of your community, please come to the gate of the community and assist in the relevant procedures for entering the community."
"Oh, okay."
hung up the phone, Xu Xiuzhen's brain was buzzing.
She hurried out of the soft accessories store and took a taxi home.
About 20 minutes later, she returned to her new home and saw a seven-meter double-row cab van printed with Starlight Home Delivery.
After repeated confirmation, the delivery of Xinghui Home Furnishing is correct.
The truck entered the community and came to the downstairs of Room 303, Unit 1, Building 3.
From the double-row cab, six young men dressed in yellow starlight home furnishings and delivery staff costumes came down.
Each young man is sturdy, with strong child holes, walking between sitting and sleeping, revealing a military atmosphere.
Xu Xiuzhen's 8 sets of household products have a lot of things, and it took six delivery people two hours to deliver the products to the room.
Xu Xiuzhen after confirming the signature on the delivery note.
Looking at the room full of product packages, she muttered speechless.
Early in the morning of the second day, the installation team of Rastar Home got in touch with her.
9:30。
A master in a purple installation suit, with 5 installation assistants in white installation suits, appeared at her door.
Then it is unpacking, installing structural hardware, assembling cabinets, connecting cabinets, installing door panels, and installing accessories.
The installation started at 9:30 in the morning and was completed by 6 masters until 20:35 in the evening.
After cleaning, he left Xu Xiuzhen's community.
Looking at the household products that had been installed, Xu Xiuzhen touched it here, looked at it, and couldn't help pinching her thighs.
In the grinning.
Laughed out loud.
It's also too dreamy.
It only took two days before and after the order!
This day! Like Xu Xiuzhen, in the dream, there are many owners in Haishi, Qiongshi, and Dan City.
The decoration company that has reached home furnishing services with Xinghui Home is even more collectively dumbfounded.
Is this in a dream? Or has the world changed?
82 Chinese Net